ML20129B630
| ML20129B630 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 05/22/1985 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20129B623 | List: |
| References | |
| NUDOCS 8506050284 | |
| Download: ML20129B630 (2) | |
Text
.-
.2 inng 4,_
k UNITED STATES 3
_ p, NUCLEAR REGULATORY COMMISSION 3
j WASHINGTo N, D. C. 20555
~
\\e.../
SAFETY EVALUATION AMENDMENT NO. 23 TO NPF-11 AND AMENDMENT NO.11 TO NPF-18 LA SALLE COUNTY STATION, UNITS 1 AND 2 DOCKET N05. 50-373 AND 50-374 Introduction By letter. dated February 21, 1985 as supplemented by letter dated March 5,1985 Corrionwealth Edison Company (the licensee) requested amendments to the La Salle, Units 1 and 2 Technical Specifications. The proposed changes are either administrative in nature or make Technical Specifications consistent with upgraded regulations that became effective January 1, 1984. Specifically Section 10 CFR 50.72 has been revised and a new Section 10 CFR 50.73 has been added.
Evaluation The revised Section 50.72 modifies the immediate notification requirements for operating nuclear power reactors, and Section 50.73 provides for a revised License Event Report System. The proposed major changes are in the
" Definitions and Administrative Control" sections of the Technical Specifications with added administrative changes to make the Technical Specification consistent throughout. The definition " Reportable Occurrence" is replaced by a new term, " Reportable Event". \\
The administrative changes were requested by the NRC Staff in Generic Letter No. 83-43, "Reportir.g Requirements of 10 CFR Part 50, Sections 50.72 and 50.73, and Standard Technical Specifications", dated December 15, 1984.
The staff has reviewed the licensee's response to the staff request and finds it acceptable.
Environmental Consideration This amendment involves a change in recorJkeeping, reporting and administrative procedures and requireroents. Accordingl.r, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
8506050284 850522 PDR ADOCK 05000373 P
Conclusion The Commission made a proposed determination that the amendment involves no significant hazards consideration which was published in the Federal
-Register (50 FR 16001) on April 23, 1985.
No public comments were received.
We have concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and. (2) such activities will be conducted in compliance with the Commission's regulations and the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Dated: NAY P.2 EE6 m