ML20129B351

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/96-05 on 960803 & Nov.Violations Re Failure to Establish Proper Design Control Measure,When Determining Valve Factors Being Cited as Violation of NRC Requirements
Date released: 05/22/2020 Download: ML20129B351


Insp Rept 50-289/96-05 on 960617-0803.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support
ML20129B376
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/13/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20129B376 (77)
Notice of Violation from Insp on 960617-0803.Violation Noted:Inspectors Could Not Confirm Valve Factor Inputs to Calculations Which Establish Design Basis Functionality of Motor Operated Valves in Safety Re Applications
ML20129B360
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/13/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20129B360 (2)
Forwards Insp Rept 50-289/96-05 on 960803 & Nov.Violations Re Failure to Establish Proper Design Control Measure,When Determining Valve Factors Being Cited as Violation of NRC Requirements
ML20129B347
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/13/1996
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: KNUBEL J
GENERAL PUBLIC UTILITIES CORP.
References
Download: ML20129B347 (3)