Responds to Request for Addl Info on Draft SER Open Item 101 Re Failure Mode Analysis for Boron Dilution Event. Analysis Will Be Submitted for Staff Review by 850715
ML20129B294
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/31/1985
From: Bailey J
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
GN-632, NUDOCS 8506050179
Download: ML20129B294 (1)


Text

W Georgia Power Company Route 2 Box 299A Waynesboro, Georgia 30830 Tek phone 404 554-9961 404 724-8114 Southern Corepany Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 -

May 31, 1985 Director of Nuclear Reactor Regulation Files X7BC35 Attention:. Ms. Elinor G. Adensam, Chief Log GN-632 Licensing Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 REF:. BAIIEY TO DENTON, GN-629 DATED 5/29/85' NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION:

DSER OPEN ITEM 101

Dear.Mr. Denton:

The failure mode analysis for the boron dilution event cited in the reference letter will be submitted to the NRC for review. The analysis will be submitted no later than July 15, 1985.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, b'

/

J. A. Bailey Project Licensing Manager JAB /cas xc D. O. Foster R. A. Thomas J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller B. Jones, Esquire L.' T. Cucwa G. Bockhold, Jr.