[7590-01-P]
NUCLEAR REGULATORY COMMISSION 10 CFR Part 50 Draft Policy Statement on the iestructuring and Economic Deregulation of the Electric Utility Industry AGENCY: Nuclear Regulatory Commission.
ACTION: Draft Policy Statement request for public coment.
SUMMARY
- The f4RC is seeking comment on the draft statement of policy regarding its expectations for, and intended approach to, its power reactor licensees.
.he electric utility industry moves from an environment of rate regulation toward greater competition.
The NRC is concerned that rate deregulation and disaggregation resulting from various restructurings involving power reactor licensees could have adverst effects on the protection
)
of public health and safety.
DATE: The public is invited to submit coments on this draft, icy Statement by [ insert a date to allow 75 days public comment)
_, 1996.
Coments received atter this date will be considered if it is practical to do so, but assurance of consideration cannot be given except as to comments received on i
or before this date. On the basis of the submitted comments, the Commission will determine whether to modify the draft Policy Statement before issuing it in final form.
1 9610210128 960917 PDR ORG NRCC t.
ADDRESSES: Mail comments to: Secretary, U.S. Nuclear Regulatory Commission, Washington DC 20555, Attention: Dockating and Service Branch.
Deliver Comments to: 11555 Rockville Pike, Rockville, Maryland, between 7:45 a.m. and 4:15 p.m., Federal workdays.
Examine copies of comments received at:
The NRC Public Document Room, 2120 L Street NW (Lower Level), Washington, DC.
FOR FURTHER INFORMATION CONTACT: Robert S. Wood, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555, telephone (301) 415-1255, e-rr. ail RSW10nrc.gav; or, for the antitrust aspects of this policy statement. William Lambe, telephone (301) 415-1277, e-mail
)
WML9nrc. gov.
SUPPLEMENTARY INFORMATION:
I. Purpose The purpose of this draft policy statement is to provide a discussion of the NRC's concerns regarding the potential safety impacts on NRC power reactor 4
licensees resulting from the economic deregulation and restructuring of the 4
4 electric utility industry and the means by which NRC intends to address those This draft policy statement recognizes the changes that are concerns.
occurring in the electric utility industry and the importance these changes may have for the NRC and its licensees. The NRC's principal mission is to regulate the Nation's civilian use of byproduct, source, and special nuclear 2
materials to ensure adequate protection of the public health and safety, to promote the common defense and security, and to protect the environment.
As part of carrying out this mission, the NRC must monitor licensee activities and any changes in licensee activities, as well as external factors that may affect the ability of individual licensees to safely operate and decommission licensed power production facilities.
- 11. Background The electric utility industry is entering a period of economic deregulation and restructuring which is intended to lead to increased competition in the industry.
Increasing competition may force integrated power systems to separate (or "disaggregate") their systems into functional Thus, some licensees may divest electrical generation assets from areas.
transmission and distribution assets by forming separate subsidiaries or even separate companies for generation.
Disaggregation may involve utility restructuring, mergers, and corporate spin-offs that lead to changes in owners or operators of licensed power reactors and may cause some licensets, intlading owners, to cease being an " electric utility" as defined in 10 CFR 50.2.'
Such changes may affect the licensing basis under which the NRC originally found a licensee to be financially qualified to construct,
' Section 50.2 defines " electric utility" as "any entity that generates or distributes electricity and which recovers the cost of this electricity, either directly or indirectly, through rates established by the enti+y itself or by a separate regulatory authority.
Investor-owned utilities, i luding generation and distribution subsidiaries, public utility districts, municipalities, rural electric cooperatives, and State and Federal agencies, including associations of any of the foregoing, are included within the meaning of " electric utility.""
3 i
4 e.
operate or own its power plant, as well as to accumulate adequate funds to ensure decommissioning at the end of reactor life.
Rate regulators have typically allowed an electric utility to recover prudently incurred costs of generating, transmitting, and distributing electric services.
Consequently, in 1984, the NRC eliminated financial qualifications reviews at th'e operating license stage for those licensees that met the definition of " electric utility" in 10 CFR 50.2 (49 FR 35747; Sept. 12, 1984). The NRC based this decision on the assumption that "the rate process issures that funds needed for safe operation will be made available to regulated electric utilities" (49 FR at 35750). However, the NRC recognized that financial qualifications reviews for operating license applicants inight be appropriate in particular cases where, for example, "the local p elic utility commission will not allow the total cost of operating the fa.ility to be recovered through rates" (49 FR at 35751). The Commission also has I
expressed potential concern with various State proposals to implement economic performance incentive programs.2 f
4 In its 1988 decommissioning rub, the NRC again distinguished between electric utilities and other licensees by allowing " electric utilities" to accumulate funds for decommissioning over the remaining terms of their i
2 See Possible Safety Impacts of Economic Performance Incentives: Final Policy Statement, (56 FR 33945; July 24,1991), for the NRC's concerns relating to State economic performance incentive standards and programs. The NRC understands that States instituted many of these programs as a means of encouraging electric utilities to lower el,ctric rates to consumers.
As States deregulate electric utilities under their jurisdictions, these economic performance incentive programs ultimately may be replaced by full market 12 competition.
4
operating licenses. NRC regulations requira its other licensees (with the added exception of State and Federal government licensees of certain facilities) to provide funding assurance for the full estimated cost of decommissioning, either through full up-front funding or by some allowable guarantee or surety mechanism.
A discussion of the current and future NRC review process will be contained in two Standard Review Plans that the NRC plans to issue -- one for financial qualifications and decommissioning funding assurance reviews and the other for antitrust reviews.
In addition, the NRC issued an Administrative Letter on June 21, 1996,- that informed power reactor licensees of their ongoing responsibility to inform, and obtain advance approval from the NRC for any changes that would constitute a transfer of the license, directly or indirectly, through transfer of control of the NRC license to any person pursuant to 10 CFR 50.80. This administrative letter also reminded addressees of their responsibility to assure that information regarding a licensee's financial qualifications tud decommissioning funding assurance which may have a significant implication for public health and safety is promptly reported to the NRC.
i 1
III. Policy Statement i
i The NRC is concerned with the potential impact of utility restructuring 1
on public health and safety. The NRC has not found a consistent relationship l
between a licensee's financial health and general indicators of safety such as i
j the NRC's Systematic Assessment of Licensee Performance (SALP). Thus, the NRC l
5
i l.
. ~. -
l l -
i has traditionally relied on its inspection process to indicate when safety 1
5 performance has begun to show adverse trends.
Based on inspection program results, the NRC can take appropriate action, including, ultimately, plant shutdown, to protect public health and safety.
However, if a plant is permanently shut down, that plant's licensee (s) may no longer have access to adequate revenues or other sources of funds for decommissioning the facility.
If rate deregulation and organizational divestiture occur concurrently with the shutdown of a nuclear plant either by NRC action or by a licensee's economic decision, that licensee may not be able to provide adequate assurance of decommissioning funds. Thus, the NRC believes that its concerns with deregulation and restructuring lie primarily in the area of adequacy of decommissioning funds, although it is also concerned with the potential effect that economic deregulation may have on operational safety.
As the electric utility industry moves from an environment of substantial economic regulation to one of increased competition, the NRC is concerned about the pace of restructuring and rate deregulation.
Approval of organizational and rate deregulation changes may occur rapidly without the NRC's knowledge. The pace and degree of such changes could affect the factual underpinnings of the NRC's previous conclusions that power reactor licensees can reliably, accumulate adeauate funds for operations and decommissioning over the operating lives of their fac lities.
For example, rate deregulation could create situations where a licensee trat previously qualified as an " electric utility" under 10 CFR 50.2 may, at some point, no longer qualify for such status. At that point, the NRC may require licensees to submit proof pursuant to 10 CFR 50.33(f)(4) that they remain financially qualified and vill require 6
them to meet the more stringent decommissioning funding assurance rer"irements of 10 CFR 50.15 that are applicable to non-electric utilities, i
Although new and unique restructuring proposals will necessarily involve ad hoc reviews by the NRC, the Commission will exercise direct oversight of such reviews to maintain consistent NRC policy toward new entities.
The NRC has considered mergers, the formation of holding companies, and the outright sales of facilities, or portions of facilities, to require NRC notification and prior approval in accordance with 10 CFR 50.80 in order to ensure that the transferee is appropriately qualified.
For example, the NRC determines whether the surviving organization will remain an " electric utility" as defined in 10 CFR 50.2.
In consideration of these concerns, the NRC will be evaluating deregulation and restructuring activities as they evolve.
The NRC will take all appropriate acticns to carry out its mission to protect the health and safety of the public and, to the extent of its statutory mandate, to ensure consistency with Federal antitrust laws.
The NRC intends to implement policies and take action as described in this policy statement to ensure that its power reactor licensees remain responsible for safe operations and decommissioning.
In summary, the NRC will:
(1) Continue to conduct its financial qualifications, decommissioning funding and antitrust reviews as described in the Standard Review 7
Plans being developed in concert with this policy statement; (2) Identify all owners, indirect as well as direct, of nuclear power plants; (3) Establish and maintain staff-level working relationships with State I
and Federal rate regulators; i
(4) Evaluate the relative responsibilities of power plant co-owners /co-licensees; and (5) Reevaluate its regulations for their adequacy to address changes
~
resulting from rate deregulation.
IV. Issues Related to Restructuring and Economic Deregulation of the Electric Utility Industry i
The NRC believes that its regulatory framework is generally sufficient i
to address many of the restructurings and reorganizations that will likely arise as a result of electric utility deregulation.
In many instances, the NRC's review process will follow the current framework, or will otherwise follow policies consistent with the NRC's current regulations. However, the NRC believes that several other policy issues need to be further evaluated and options developed. Therefore, this section addresses NRC policies with respect to electric utility restructuring and economic deregulation both as these policies can be carried out under current regulations and as matters under consideration for further resolution.
8
( -
A. NRC Resoonsibilities vis-a-vis State and Federal Economic Reaulators.
The NRC has recognized the primary role that State and Federal economic regulators e in setting rates that include appropriate levels of funding for safe operation and decommissioning. For example, the preamble to the 1988 decommissioning rule stated: "The rule, and the NRC's implementation of it, does not deal with financial ratemaking issues such as rate of fund collection, procedures for fund collection, cost to ratepayers, taxation effects, equitability between early and late ratepayers, accounting procedures, ratepayer versus stockholder considerations, responsiveness to e
cisange and other similar concerns.... These matters are outside NRC's jurisdiction and are the responsibility of the State PUCs and [the Federal Energy Regulatory Commission] FERC" (53 FR at 24038; June 27, 1988).
Notwithstanding the primary role of economic regulators in rate matters, the NRC has authority under the Atomic Energy Act of 1954, as amended, (AEA) to take actions that may affect a licensee's financial situation when these actions are warranted to protect public health and safety.
To date, the NRC has found no significant instances where State or federal rate regulation has led to disallowance of funds for safety-related operational and decommissioning expenses. Some rate regulators may have chosen to reduce allowable profit margins through rate disallowances, or licensees have for other reasons encountered financial difficulty.
In order for the NRC to make its safety views known and to encourage rate regulators to continue their practice of allowing adequate expenditures l
9 i
1
l l
for nuclear plant safety as electric utilities face deregulation, the NRC intends to take a number of actions to increase cooperation with State and Federal rate and financial regulators to promote dialogue and minimize the possibility of rate deregulation or other actions that would have an adverse i
safety impact. We intend to work and consult with the State PUCs through the National Association of Regulatory Utility Commissioners (NARUC), and with FERC and the Securities and Exchange Commission (SEC) to coordinate activities and exchange information.
B. Co-owner Division of Responsibility Many of the NRC's power reactor licensees own their plants jointly with other, non-related organizations. Although some co-owners may be only
)
authorized to possess the nuclear facility and its nuclear material, and not to operate it, the NRC views all co-owners as co-licensees who are responsible for complying with the terms of their licenses. Public Serv /ce Company of Indiana, Inc. (Marble Hill Nuclear Generating Station, Units 1 & 2), ALA8-459, 7 NRC 179, 200-201 (1978). The NRC is concerned about the effects on the availability of operating and decommissioning funds, and about the division of responsibility for operating and decommissioning funds, when co-owners file for bankruptcy or otherwise encounter financial difficulty.3 The NRC is The NRC has had experience with 3 licensees who have had much greater 3
than de minimis shares of nuclear power plants and who filed under Chapter 11 of the U.S. Bankruptcy Code: Public Service Company of New Hampshire (PSNH), a co-owner and operator of the Seabrook plant; El Paso Electric Company (EPEC),
a co-owner of the Palo Verde plant; and Cajun Electric Power Cooperative (Cajun), a co-owner of the River Bend plant. Both PSNH and EPEC continued their pro rata contributions for the operating and decommissioning expenses for their plants and successfully emerged from bankruptcy.
Cajun remains in bankruptcy.
10
)
^
evaluating courses of action to ensure that operating and decommissioning 4
costs are paid by owners.
i C. Financial Oualifications Reviews The NRC believes that the existing regulatory framework contained in i 50.33(f) and in the guidance in 10 CFR Part' 50, Appendix C, is generally sufficient at this time to provide reasonable assurance of the financial qualifications of both electric utility and non-electric utility applicants and licensees under the various ownership arrangements of which the staff is currently aware.
Licensees that remain " electric utilities" will not be subject to NRC financial qualifications review, other than to determine that such licensees, in fact, remain " electric utilities." However, the NRC is evaluating the need to develop additional requirements to ensure against j
potential dilution of capability for safe operation and decommissioning that could arise from rate deregulation and restructuring.
Section 184 of the Atomic Energy Act and 10 CFR 50.80 provide that no license shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission consents in writing.
The NRC i
intends to review transfers to determine their potential impact on the licensee's ability both to maintain adequate technical qualifications and j
f organizational control and authority over the facility and to provide adequate funds for safe operation and decommissioning.
Such consent is clearly required where a corporate entity seeks to transfer a license it holds to a different corporate entity. See Long Island Lighting Co. (Shoreham Nuclear 11
Power Station, Unit 1) CLI-92-4, 35 NRC 69 (1992).
The NRC staff has advised licensees that agency consent should be sought and obtained under f 50.80 for the formation of a new holding company over an existing licensee.
Other types of transactions, including those involving transfers of operating authority or j
responsibility to non-licensed organizations, have been considered by the staff on a case by case basis to determine whether 9 50.80 consent is required. The NRC is evaluating what types of transfers or restructurings should be subject to i 50.80 review.
Effective December 28, 1995, all orders approving i 50.80 transfers have been signed by the Director, Office of Nuclear Reactor Regulation. The NRC staff will inform the Commission of unique or unusual licensee restructuring actions.
D. Decommissionino Fundina Assurance Comoliance Reviews The NRC believes that the existing decommissioning funding assurance provisions in f 50.75 generally provide an adequate regulatory basis for new licensees to provide reasonable assurance of decommissioning funds.
- However, to address this and other issues related to decommissioning funding assurance in anticipation of rate deregulation, the NRC published an advance notice of proposed rulemaking (ANPR) (61 FR 15427: April 8, 1996).
4 E.
Antitrust Reviews The NRC must be able to accurately identify all owners of its licensees to meaningfully assess whether there have been "significant changes" since the licensing reviews. The NRC anticipates that competitive reviews over the next 12 4
s
5 to 10 years will arise primarily from changes in control of licensed f
facilities.
The regulatory review addressing transfer of control of licenses under 10 CFR 50.80 will be used to determine whether new owners or operators will be subject to an NRC significant change review with respect to antitrust matters.
ELECTRONIC ACCESS i
Comments may be submitted electronically, in either ASCII text or Wordperfect format (version 5.1 or later), by calling the NRC electronic Bulletin Board (BBS) on FedWorld.
The bulletin board may be accessed by using a personal computer, a modem, and one of the commonly available communications software packages, or directly via Internet. Background documents on the draft policy statement are also available, as practical, for downloading and viewing'on the bulletin board.
If using a personal computer and modem, the NRC Rulemaking subsystem on FedWorld can be accessed directly by dialing the toll free number (800) 303-9672.
Communication software parameters should be set as follows: parity to j
none, data bits to 8, and stop bits to 1 (N,8,1). Using ANSI or VT-100 terminal emulation, the NRC Rulemaking subsystem can then be accessed by selecting the " Rules Menu" option from the "NRC Main Menu." Many NRC subsystems and data bases also have a " Help /Information Center" option that is tailored to the particular subsystem.
The NRC subsystem on FedWorld can also be accessed by a direct dial J
13
)
L i
~
telephone number for the main FedWorld BBS, (703) 321-3339, or by using Telnet via Internet: fedworld. gov.
If using (703) 321-3339 to contact FedWorld, the NRC subsystem will be accessed from the main FedWorld menu by selecting the
" Regulatory, Government Administration and State Systems," then selecting
" Regulatory Information Mail." At that point, a menu will be displayed that has an option "U.S. Nuclear Regulatory Com.nission" that will take you to the NRC Online main menu. The NRC Online area also can be accessed directly by typing "/go nrc" at a FedWorld command line. If you access NRC from FedWorld's main menu, you may return to FedWorld by selecting the " Return to FedWorld" option from the NRC Online Main Menu. However, if you access NRC at FedWorld j
by using NRC's toll-free number, you will have full access to all NRC systems, j
but you will not have access to the main FedWorld system.
If you contact FedWorld using Telnet, you will see the NRC area and menus, including the Rules Menu.
Although you will be able to download documents and leave messages, you will not be able to write comments or upload j
files (comments).
If you contact FedWorld using FTP, all files can be i
accessed and downloaded but uploads are not allowed; all you will see is a list of files without descriptions (normal Gopher look).
An index file j
listing all files within a subdirectory, with descriptions, is available.
l There is a 15-minute time limit for FTP access.
Although FedWorld can also be accessed through the World Wide Web, like i
j-FTP that mode only provides access for downloading files and does not display i
the NRC Rules Menu.
i i
I 14 L
\\
1
., e f
For more information on NRC bulletin boards call Mr. Arthur Davis, Systems Integration and Development Branch, NRC, Washington, DC 20555, telephone (301) 415-5780; e-mail AXD39nrc. gov.
/(
day of p S]s 1996.
Dated at Rockville, Maryland, this I
i For the Nuclear Regulatory Comission.
1
($
f(
JohnC. Hoyle,/
Secretary of the Comission.
15