ML20128Q461
| ML20128Q461 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/29/1985 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| 0205M, 205M, GN-629, NUDOCS 8506040203 | |
| Download: ML20128Q461 (1) | |
Text
GeorgLn Power Company Rout 3 2 Box 299A Waynesboro. Georgi 130830
. Telephone 404 554 9961 404 724-8114 Southern Company Services,Inc.
Post Office Box 2625 ~
Birmingham, Alabama 35202 Telephone 205 870{011 Vogtle Proj,ect May 29, 1985
. File: X7BC35
- Director of Nuclear Reactor Regulation Attention:
Ms. Elinor G. Adensam, Chief Log:
GN-629 Licensing Branch #4 Division of Licensing U. S. Nucle ~ar Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTIE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION: DSER OPEN ITEM 101
Dear Mr. Denton:
,Concerning DSER Item 101, Inadvertent Boron Dilution, we have performed a.
failure mode analysis for the chemical and volume control' system which de.monstrates that the calculated minimum time intervals available (time interval-between an alarm announcing an unplanned moderator dilution and the time of loss of shutdown margin) for the operator to take appropriate corrective actions will meet the acceptance criteria of SRP Section 15.4.6, i.e., at least 15 minutes. The' primary instrument used to detect this event is the' safety-grade source range. The FSAR will be revised
'accordingly via FSAR Amendment 17, which is scheduled for July 1985.
If your staff requires any additional information, please do.not hesitate to contact me.
Sincerely, 4
J. A. Bailey Project Licensing Manager 4
' JAB /caa
. Enclosure xc:
D. O. Foster G. Bockhold, Jr l
R. A. Thomas H. H. Gregory, III T. Johnson J. E. Jeiner, Esquire.
D. C. Teper B. W. Churchill, Esquire M. A.~ Miller L. Fowler B. ' Jones, Esquire Vogtle Project File L. T.Gucwa I
8506040203 850529
.0205m.
PDR. ADOCK 05000424 E
-