ML20128Q145

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Documents Describing Scope of Work & Results from Projects by Westinghouse or NRC Re Steam Generator Tube Degradation in Pwrs.Forwards Apps B & C Documents.Info Available in PDR
ML20128Q145
Person / Time
Issue date: 05/22/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Patricia Anderson
WISCONSIN'S ENVIRONMENTAL DECADE
Shared Package
ML20128Q150 List:
References
FOIA-84-884 NUDOCS 8507130382
Download: ML20128Q145 (3)


Text

E }

  • &f*[*h o. UN.TED STATES N 8' ,

~{.E NUCLEAR REGULATORY COMMISSION L)  ;

5 WASHINGTON, D. C. 20555 o  !

%...+[ May 22, 1985 O(3 Mr. Peter Anderson, President Wisconsin's Environmental Decade 114 North Carroll Street, Suite 208 IN RESPONSE REFER Madison, WI 53703 T0.F01A-84-884

Dear Mr. Anderson:

This is in further response to your letter dated November 26, 1984, in which you requested, pursuant to the Freedom of Information Act, copies of any documents subsequent to 1980 describing the scope of work and results from projects completed, or in the process of being conducted or planned, by

~ Westinghouse Electric Corporation or the Nuclear Regulatory Comission relating to tests or analyses of steam generator tube degradation in pressurized water reactors.

By letters to you dated January 3,1985, and January 14, 1985, we provided you with documents subject to your request as modified and informed you about obtaining NRC NUREG documents.

During a May 9, 1985, telephone discussion with Joseph Cawley, among other things you agreed to accept a non-proprietary version of GPUN Topical Report 008, Revision 3, which is identified at number eight on the enclosed Appendix B.

The enclosed Appendix B is a list of records subject to your request that are available at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. The enclosed Appendix C is a list of documents subject to your request which are being placed in the PDR in file folder F01A-84-884 under your name. Also enclosed is a notice which explains how you can obtain records from the PDR.

This completes NRC action on this request. If you have any questions regarding this response, please telephone Mr. Cawley at 301-492-4269.

Sin 916 ely, M. elton, Director ivision of Rules and Records Office of Administration i

Enclosures:

As stated i

2 g50522 ,

O p 4 004

e

. Re: F01A-84-884 DATE DOCUMENT DESCRIPTION ACCESSION NUMBER

1. 10/23/84 Letter Hukill to Stolz regarding 8410290063 documents submitted in response to staff request for additional inform-ation concerning steam generator plugging program.
2. 07/18/84 Letter Hukill to Stolz regarding 8407230010 current status of recent tube plugging efforts
3. 11/21/84 Letter Clark to Denton regarding 8412010168 comment on Beyea Report
4. 08/15/84 PNO-I-84-69: License reported 8408210383 five missing lower head steam 9enerator plugs
5. 06/29/84 PNO-I-84-56: Licensee confirmed 8407060090 presence of boron in secondary side of once-through steam generator 8
6. 07/09/84 PNO-I-84-56A: QC Check of plug 8407160144 status in steam generator A identified two tube plugging problems.
7. 07/17/84 PNO-I-84-56B: Five steam 8407240108 generator plugs discovered missing from lower outlet head area.
8. 9/83 GPUN Topical Report 008, Rev. 3, 8309190320 I entitled " Assessment Of TMI-l Plant l Safety For Return To Service After l

Steam Generator Repair"(Non-proprietary) l

9. 10/84 Safety Evaluation For Use Of Westing- 8410290066 house Rolled Plugs In TMI-l Once Through Steam Generator, Rev. 1
10. 10/84 Report:" Loose Once Through Steam 8410290076 Generator Westinghouse Rolled Plugs"
11. 10/84 Report:" Operation W/ Loose Once Through 8410290078 Steam Generator Tube Sheet Plugs"
12. 10/84 Report:" Evaluation Of Potential Effects 8410290083 Of Loose Once Through Steam Generator Plugs In TMI-l RCS"

3

i Re: F01A-84-884-APPENDIX C
1. 06/03/77 Letter D. Olson to P. Litteneker Re: Resolution of Comments on the Semiscale EOS Appendix 28 w/EOS Operating Specification for Steam Generator Tube Rupture Tests S-28-1 through S-28-4 (88 pages)
2. 06/06/77 Letter D. Olson to P. Litteneker transmitting Test Prediction for Test S-28-1 (32 pages)
3. 06/08/77 Letter D. Olson to Litteneker transmitting Test Prediction for Test S-28-2 (27 pages)
4. 06/13/77 Letter D. Olson to R. Tiller transmitting Test Prediction for Test S-28-1 (Revision 1) (31 pages)
5. 06/28/77 Letter D. Olson to R. Tiller transmitting Test Prediction for Test S-28-3 (27 pages)
6. 06/30/77 Letter D. Olson to R. Tiller transmitting Test Prediction for Test S-28-4 (30 pages)
7. 07/06/77 Letter D. Olson to R. Tiller transmitting Quick Look Report for Tests S-28-1 and S-28-2 (36 pages)
8. 07/18/77 Letter D. Olson to R. Tiller transmitting Test Prediction forTEstS-28-5(30pages) -
9. 07/27/77 Letter D. Olson to R. Tiller transmitting Quick Look Report for Tests S-28-3 and S-28-4 (30 pages)
10. 08/19/77 Letter D. Olson to R. Tiller transmitting Quick Look Report for Test S-28-5 (19 pages)
11. 09/09/77 Letter D. Olson to R. Tiller transmitting Quick Look Report for Test S-28-6 (23 pages)
12. 09/30/77 Letter D. Olson to R. Tiller transmitting Quick look Report for Tests S-28-7 through S-28-12 (36 pages)

W Wisconsin's Environmental Decade 114 North Carroll Street, Suite 208, Madison, Wisconsin 53703 (608) 251-7020 230 W. Wells St.. Suite 309. Milwaukee, WI 53203 (414) 272-1607 sommo 214W East College, Appleton, WI 54911 (414) 734 5403 4chaf4s Seay Charrman IQn And t,,%,'a.,

November 26, 1984 fitEEDOW OF INFORMAT)ON

"'"'" ACI REQUEST

'L^^"*'"" ,o Freedom of Information Act Officer p,ap,G;a

Ue Se Nuclear Regulatory Commission -[f-[h n = a u - ane

=L .,

Washington, De Ce 20555 To Whom It May Concern:

0LL d IN9-tyf

$27,T" n,cos,a e, neu

}.Use'," Pursuant to the Freedom of Information Act, this is to m ,, request copies of any documents subsequent to 1980 describing the

"**===* scope of work and results f rom projects completed, in the process

'L'Z"" of being conducted or planned by Westinghouse Electric i,9,,8l,";,,,, Corporation or the Nuclear Regulatory Commission relating to uma tests or analyses of steam generator tube degradation in

"*s ' i',0,,. pressurized water reactorse on ,t.w ,.

l5, """"" A waiver f rom any fees is requested on the grounds that the a* Z',"

information is sought by a non-profit, public interest ca = = organization for use as part of the public dialoguee In the T!sZa, event a waiver f rom fees is not granted, please advise if any y " ';,,, fees will be in excess of $50e I",'C" Sincerely, c m .ng ,

Ty;" WISCONSI' S bNIRONMENTAL DECADE, INCe C tn. Crnnon m< . -. ..

We@rn HOuda

-w* by t s Cooremstor i Denae Amsoa j"'i'

/P R ANDERSON n~n u..*, President Dmow e Apam,pe ca n Idrietukee Canv854 Arthst Boss f ascerve Dnve Cowomstw AsNa Gopent og Admm<sfrghee A s s.staat Appieten Canvass Da e Mcsta (dur crea Drse As eco@re Ilen) Y(* led 4&nsmettratrye

$$$*ef3nt Maeson Canvase Kevm Crown idus annri Dnve

$8 3e OU*

bean knneuter Aan.n.st errve A14 8Ca' taw Cneere Canvase Fe,r, noti.es Eduranon Or*Ve Aescream 3542t?g4-l, v<a. P@ess **eenendes A.-

.