g p'O
- D"de"a#
NudearOperanons -
. Fermi-2 Edison"REEN a:n;.
-May 27, 1985 NE-85-0713 FRIORity RoutitlG Mr.. James G.-Keppler og\\
NK Regional' Administrator g
Region III p(ggg U. S.-Nuclear 1 Regulatory Commission
- jg
-799 Roosevelt Road Glen Ellyn,: Illinois 60137
Dear Mr. Keppler:
Reference:
(1)
Fermi 2 NRC Docket No. 50-341 (2)
Fermi 2 Facility Operating License, License No. NPF-33
Subject:
Fermi 2 Facility Operating License Condition for Electrical and'IEC As-built Drawina Proaram The' purpose of this letter is to request the assistance of NRC,-Region III, in acquiring a clarification'to the Fermi 2 Facility Operating License.
Detroit Edison is addressing this request to Region III because'it is related to the Electrical and I&C As-built Program which is under the purview ~of the Region.
The' license, Attachtent 1, paragraph B.3.ar states:
" Correct all remaining drawing deviations (not completed prior ~to fuel load or addressed in
' Item 2.a'above) identified during walkdowns associated with the resolution of 10CFR50.55(e),
Item No. 143, " Deviations of As-built Plant from Design Dor:uments".
Demonstrate'that all design documents; reflect the as-built configuration of the. plant."
To assure this requirement is understood to apply.to the nuclear safety-related electrical and IEC plant configura-tion and that some flexibility'is allowed in the manner of
~
final' engineering disposition of Category C deviations, the
-revised paragraph.below is proposed for incorporation into the. Fermi 2 full power license:
MAY 311985 hDOCk$
/
DR 0
g
I Mr. James G. Keppler May 27, 1985 NE-85-0713 Page 2
" Correct all remaining drawing deviations (not completed prior to fuel load or addressed in Item 2.a above) identified during walkdowns associated with the resolution of 10CFR50.55(e),
Item No. 143, " Deviations of As-built Plant from Design Documents".. Demonstrate that all design documents related to the subject 50.55(e) Item No. 143 are reconciled to the as-built configur-ation of the plant."
The flexibility referred to above for Category C engineering dispositions includes, as an example, the acceptability of the drawing configuration shown below:
Terminal Terminal Strip Strip 1
1 3
3 T
T 3
T T
T Field Drawing Minor. pictorial differences as shown above which are electrically and functionally equivalent, may be acceptable as-is and so documented without requiring a revision to a drawing.
Please direct any questions to Mr. Lewis Bregni at (313)586-5083.
Sincerely,
+