Text
9/'% %
UNITED STATES -
- o 4:
P NUCLEAR REGUt.ATORY COMMISSION g
.i.
WASWNGTON. D. C. 20555 -
0
%,,4...+ /
February 22, 1993 Docket Nos.
E.-266 and 50.,01; Mr. Robert E. Link, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee, Wisconsin 53201
Dear Mr. Link:
SUBJECT:
EVALVATION OF POINT BEACH NUCLEAR PLANT 120-DAY RESPONSE T0 SUPPLEMENT NO. 1 TO GENERIC LETTER 87-02 (TAC N0s. M69472 AND MG9473)
The enclosure provides the NRC staff's evaluation of your response to Supplement No. I to Generic Letter (GL) 87-02, " Verification of Seismic Adequacy of Mechanical and Electrical Equipment in-Operating Reactors, Unre-solved Safety Issue (USI) A-46," for the Point Beach Nuclear. Plant, Units 1 and 2, which was submitted to the NRC in a letter dated September 21,.1992.
The supplement required that all addressees provide, within 120 days of the issue date of the supplement,- either a commitment to use both the Seismic Qualification Utility Group (SQUG) commitments and the implementation guioance described in the Generic Implementation Procedure, Revision 2 (GIP-2), as corrected on February 14, 1992, and as supplemented by the staff's-Supple-mental Safety Evaluation Peport No. 2 (SSFR No. 2), or else provide an alter-native method for responding to the GL.
Your September 21, 1992, response indicated that you commit to the SQUG commitments but was unclear as to whether you plan to follow the implemen-tation guidance.
In a conference call on January 15,1993,.ycu clarified your intent to adhere to the GIP-2 implementation = procedures. ~ Based on your com-mittment to the entire GIP-2, including both the SQUG commitments and the implementation guidance, the staff finds your response acceptable.
We note that, in addition to the August 21, 1992, SQUG letter for implementing GIP-2 referenced in your submittal, you should refer to the October 2,1992, letter f rom J. G. Partlow, NRC, to N. Smith, SQUG (attached co_ the enclosed -
SE) which responds to thc August 21, 1992, SQUG letter.
The implementation schedule you propose is within the 3-year response period requested by the staff in Supplcment No. I to GL 87-02 and is, therefore, acceptable.
Your response concerning the in-structure response spectra to be used for USI A-46 has been determined by the staff to be adequate and acceptable.
In-additicc, the staf f agrees with you that the in-structure response spectra generated using the procedures and criteria described in your submittal can be used as ' conservative, design" spectra for coccaring seismic capacity to seismic demand at Point Beach.
9302250094 930222 PDR ADOCR 05000266 P
PDR f'
m
, n
~,
mn I
,-.3, Mr. Robert E. Link February-22, 1993 In addition to responding to the generic letter, your September 21, 199f letter indicated that you intend to change the licensing basis methodology for verifying the seismic adequacy of new and replacement-electrical and mechanical equipment prior to receipt of a final-plant-specific SER resolving US! A-46.
This would be done-in accordance with 10 CFR 50.59.. You also indicated that you plan to use GlP seismic verification methodology _ in the-near future for the installation of two additional' euergency diesel generators.
The staff recognizes that you may revise the licensing basis in accordance wi'th 10 CFR 50.59 to reflect the acceptability of the USI A-46 (GIP) methodology for verifying the seismic adequacy of-electrical-and mechanical equipment covered by the GIP.
This should.be done consistently with the SQUG commitments and implementation guidance.
If you have any questions regarding this issue, please contact me at (301) 504-1387.
Sincerely, h4V 1.
AnthonyT.fGody,dr., roject Manager Project Directorate 111-3 Division of Reactor Projects-Ill/IV/V Office of Huclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
-)
See next page d
f'
]
Mr. Robert E.: Link --
February 22, 1993
/
In addition to responding to the generic letter, your September-21, 1992 letter indicated that you intend to change.the licensing basis methodology for verifying the seismic adequacy of new and replacement electrical andL mechanical equipa*nt prior to receipt of a final plant-specific 1 SER resolving USl A-46.
This would be done in accordance with IC CFR 50.59.1You also.
indicated that you plan to use GIP seismic verification methodology:in the.
near future for the installation of two additional emergency diesel generators.
The staff recognizes that you may revise the licensing ~ basis in<
accordance with 10 CFR 50.59 to reflect the acceptability of the USl A-46 (GIP) methodology for verif ving the seismic adequacy of electrical and mechanical equipment covered by the GIP.
This should be done consistently with the SQUG commitments and implementation guidance.
If you have any questions regarding this issue, please contact me at (301) 504-1387.
Sincerely, Original Signed By:
Anthony T. Gody, Jr., Project Manager Project Directorate'III-3 Division of Reacto'r Projects lll/IV/V-Office of Nuclear Reactor T..:lation
Enclosure:
As stated cc w/ enclosure:
See next page DJSTRIBUTION Dockrt File ACRS (10)
NRC & LPDRs PD33 Gray PD3-3 Reading Region 3 DRP JRoe PYChen Zwolinski MMcBrearty JHannon JMa PKreutzer HAshar AGody,Jr.
JNorberg FICE PD3-3:LA PD3-3:PM PD3-3:PD
'ff(E jf///-
/
NAME PK ut;zer AGodyJr/atg/th JHannonheb JNerg j;
l _DATE 4 /& /93
.f//6/93 Ap93
'l / f " 93 OFFICIAL RECORD.
i:
DOCUMENT NAME:
G;\\PTBEACH\\PB69472,SER
=
- \\
d
l-t Mr. Robert E. Link Point' Beach Nuclear Plant Wisconsin Electric Pcwer Company Unit Nos. 1 and 2 CC:
Ernest L. Blake, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
1 Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Pnint Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chai rn.an Public Service Commission of Wisconsin Hills Farms State Office Building Hadiron, Wisconsin 53702 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Roao Two Rivers, Wisconsin 54241 D
i a
I n-