Advises That Util Change to ECCS Outage Reporting Commitment,Acceptable
ML20128P771
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/18/1993
From: Hopkins J
Office of Nuclear Reactor Regulation
To: Stratman R
COMMONWEALTH EDISON CO.
References
TAC-M76180, NUDOCS 9302250092
Download: ML20128P771 (4)


Text

- _ - _ _. _ -

\\

  • 4 Docket No. 50-440 february 18. 1993 Mr. Robert A. Stratman, Vice President Nuclear - Perry The Cleveland Electric illuminating Company 10 Center Road Perry, Ohio 44081

Dear Mr. Stratman:

SUBJECT:

ANf10AL ECCS OUTAGE REPORT (TAC NO. M76180)

By letter dated February 28, 1990, you informed the NRC staff that you would no longer submit an annual Emergency Core Cooling System (ECCS) outage report to the NRC.

Instead, you will utilize your ongoing involvement with the Institute of Nuclear Power Operations Nuclear Plant Reliability Data System and the 10 CFR 50.73 reporting requirements in order to identify significant ECCS component failures and reliability data for the ECCS systems.

The NRC staff has reviewed the change to your ECCS outage reporting commitment and finds that it is acceptable.

Contact me if you have any questions.

Sincerely, original signed by Jon B. Hopkins, Sr. Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation cc:

See next page llM31WllE NRC & Local PDRs

- vr ow-PDill-3 r/f PDill-Plant File JRoe JZwolinski JHannon RJones JHopkins OGC ARCS (10)

EGreenman, Rlli PKreutzer 3Gl}'

'Y l Q f

LA:PDil);4; PM:PDI!!-3 SRXB:NR D:PDIII-3 PKreutzer JHopkins:sw RJones JHannon 2/j7 /93 2/p/93 2/lp3 2/g/93 1 0 G'

9302250093 930pj*g

^

gDR ADOCK 0500044o

" V '-< a i PDR

t

~

D g.

Y Docket No. 50-440 February 18. 1993 Mr. Robert A. Stratman, Vice President Nuclear - Perry The Cleveland Electric Illuminating Company 10 Center Road Perry, Ohio 44081

Dear Mr. Stratman:

SUBJECT:

ANNUAL ECCS OUTAGE REPORT (TAC NO. M76180)

By letter dated February 28, 1990. you informed the NRC staff that you would no longer submit an annual Emergency Core Cooling System (ECCS) outage report -

to the NRC.

Instead, you will utilize your ongoing involvement with the Institute of Nuclear Power Operations Nuclear Plant Reliability Data System and the 10 CFR 50.73 reporting requirements in order to identify significant ECCS component failures and reliability data for the ECCS systems.

The NRC staff has reviewed the chat.gr to your ECCS outage reporting commitment and finds that it is acceptable. Contact me if you have any questions.

Sincerely, original signed by Jon B. Hopkins, Sr. Project Manager Project Directorate III-3 Division of-Reactor Projects ill/IV/V Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUT10B Docket File NRC & Local PDRs PDill-3 r/f PDIll-Plant File JRoe JZwolinski JHannon RJones JHopkins OGC ARCS (10)-

EGreenman, Rlll PKreutzer 3Bf Yl n

LA:PDII),-3 PM:PDill-3 SRXB:NR D:PDill-3 s

PKreutzer JHopkins:sw R]ones JHannon 2/g)/93 2/p/93 2/1p3 2/g/93

((p* #8!g%,

e,

UNITED STATES 3

p, NUCLEAR REGULATORY COMMISSION g

't WASHNGTON D. C. 20$55 "ty.....,f february 18, 1993 Docket No. 50-440 Mr. Robert A. Stratman, Vice President Nuclear - Perry The Cleveland Electric 111uminating Company 10 Center Road Perry, Ohio 44081

Dear Mr. Stratman:

SUBJECT:

ANNUAL ECCS OUTAGE REPORT-(TAC NO H76180)

Dy letter dated February 28, 1990, you inforiaed the NRC staff that you would no longer submit an annual Emergency Core Cooling System (ECCS) outage report to the NRC.

Instead, you will utilize your ongoing involvement with the Institute of Nuclear Power Operations Nuclear Plant Reliability Data System and the 10 CFR 50.73 reporting requirements in order to identify significant ECCS component failures and reliability data for the ECCS systems.

The NRC staff has reviewed the change lo your ECCS outage reporting commitment and finds that it is acceptable.

Contact me if you have any questions.

Sincerely, rY) o /l

/onB.Hopkins,Sf.ProjectManager Project Directorate 111-3 Division of Reactor Projects Ill/IV/V Office of Nuclear Reactor Regulation cc:

See next page n

Mr. Robedrt A. Stratman Perry Nuclear Power Plant Cleveland Electric illuminating Company Unit Nos. I and 2 CC:

Jay E. Silberg, Esq.

Mr. James W. Harris, Director Shaw, Pittman, Potts & Trowbridge Olvision of Power Generation 2300 N Street, N.W.

Ohio Department of Industrial Relations Washington, D.C.

20037 P. O. Box 825 Columbus, Ohio 43216 Mary E. O'Reilly Centerior Energy Corporation The lionorable Lawrence Logan 300 Madison. Avenue Mayor, Village of Perry Toledo, Ohio 43652 4203 Har)er Street Perry 011o 44081 Resident inspector's Office The Honorable Robert V.-Orosz U.S. Nuclear Regulatory Commission Mayor, Village of North Perry-Parmly at Center Road North Perry Village Hall Perry, Ohio 44081 4778 Lockwood Road Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission Attorney General 799 Roosevelt Road Department of Attorney General Glen Ellyn, Illinois 60137 30 East Broad Street Columbus, Ohio 43216 Frank P. Weiss, Esq.

Assistant Prosecuting Attorney Radiological-Health Program 105 Main Street Ohio Department of Health Lake County Administration Center Post Office Box 118 Painesville, Ohio 44077 Columbus, Ohio 43266-0118 j

Ms. Sue Hiatt Ohio Environmental Protection Agency OCRE Interim Representative DERR--Compliance Unit 8275 Munson ATTH:

Zack A. Clayton Mentor, Ohio 44060 P. O. Box 1049 Columbus, Ohio -43266-0149

-Terry J. Lodge, Esq.

618 N. Michigan Street, Suite 105 Mr. Phillip S. Haskell, Chairman Toledo, Ohio 43624 Perry Township Board of Trustees 4171 Main Street, Box 65 John G. Cardinal, Esq.

Perry, Ohio 44081 Prosecuting Attorney

, ~

Ashtabula County Courthouse State of Ohio l

Jefferson, Ohio 44047 Public Utilities Commission East Broad Street l

Mr. Kevin P. Donovan Columbus, Ohio 43266-0573 Cleveland Electric 111uminating Company David P. Igyarto, General Manager Perry Nuclear Power Plant Cleveland Electric illuminating Company P. O. Box 97, E-210 Perry Nuclear Power Plant Perry, Ohio 44081 Post Office Box 97, SB306 Perry, Ohio 44081

-gn,..

g-,

+

a m

n 9

ya 3

-