g g g/91-o7
qsa
a'
-(
(.
. .
e
-
l
. APR O '81991
Docket No. 50-483
'
.
Union Electric Company
ATTN: Mr. Donald F. Schnell
Senior Vice President - Nuclear
-
Post Office Box 149 - Mail Code 400
'
St. Louis, MO 63166
Gentlemen:
'This refers to the routine safety inspection conducted by
Messrs. J. W. McCormick-Barger and D. J. Hartland of this office from March 25
through March 29, 1991, of activities' at Callaway Plant, Unit 1, authorized by
NRC Operating License NPF-30, and to the discussion of our findings with
Mr. J. D. Blosser and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
N.
No violations of NRC requirements were identified during the course of ;i.
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of.
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
u0riginal s;gned by B, C. I'40f
Richard C. Knop, Chief
Reactor Projects Branch 3
Enclosure: Inspection Report
No. 50-483/91007(DRP)
See Attached Distribution
,
.
j
RIII
RIII
RIII
pf0I
Hartland/dsv
Hague-
Knop
,
,
I
i
9610100090 910409,3
DR
ADOCK 0500
p
-
-
.
.
-
_
_ -
.
' '
(
(
'
, - '
.
g
.
!'
!
APR g 81991
l
Docket No. 50-483
-
!
Union Electric Company
ATTN: Mr. Donald F. Schnell
,
Senior Vice President - Nuclear
Post Office Box 149 - Mail Code 400
St. Louis, MO 63166
.
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
J. W. McCormick-Barger and D. J. Hartland of this office from March 25 through
29, 1991, of activities at Callaway Plant, Unit 1, authorized by NRC Operating
License NPF-30, and to the discussion of our findings with Mr. J. D. Blosser
,
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies arear examined during
i
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
1
..
!
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
s.
I
gc 4
Richard C. Knop, Chief
Reactor Projects Branch 3
l
Enclosure:
Inspection Report
No. 50-483/91007(DRP)
See Attached Distribution
---
3+
p
[v'"
..
RIII
RI
R
-!{
-
Hartland/dsv
ue
Knyp
.
4-6 1I
h i'
/
_ . . . . _ _ .
__.. -
.._
.. ..
_.
-
.. _
,'
[
(
.
.,
-
Union Electric Company
2
APR 08ta?!
Distribution
cc w/ enclosure:
G. L. Randolph, Vice President,.
Nuclear Operations
.
J.'V. Laux, Manager Quality
-
Assurance
)
Tom P. Sharkey, Supervising
Engineer, Site Licensing
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIII
Region IV
. Resident Inspector, Wolf Creek
K. Orey
Chris R. Rogers, P.E.
Utility Division, Missouri
Public Service Commission
CFA, Inc.
Gerald Charnoff, Esq.
Thomas Baxter, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
.
1
.
I
i
---
.
-s,
9
- ~ -
-
.
.