h n,...,
/
UNITED STATES cr
[
['
~k NUCLEAR REGULATORY COMMISSION Q
O l
WASHINGTON, D, C. 205bs k,
p#
February 18, 1993 Docket No. 50-245 Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
MILLSTONE NVCLEAR POWLR STATION, UNIT 1 - INSERVICE TESTING PROGRAM RELIEF REQUESTS FOR PUMPS AND VALVES (TAC NO. M84917)
By letter dated October 30, 1992, Northeast Nuclear Energy Company (NNECO) provided the NRC staff with their resolution of the outstanding items regarding the Inservice Testing (IST) Program at Millstone Unit No. 1.
By letter dated January 8, 1992, the staff issued its safety evaluation in response to NNEC0's submittal of Revision 4 of the Millstone Unit No.1 IST Program and associated relief requests.
In the NRC's January 8, 1992, safety evaluation, the staff requested NNECO to provide a description of the process used in developing the IST Program, in addition, the staff requested that NNECO address the items identified in the " Anomalies and Action Items" Section of the above-mentioned safety evaluation. NNEC0's October 30, 1992, submittal addressed Dese items and, in addition, forwarded Revision 5 of the IST Program (with 8 relief requests for pumps and 14 relief requests fo" valves).
The staff's review of NNECO's submittal is provided in the enclosed safety evaluation.
The Code of Federal Regula+1ons, 10 CFR 50.55a, requires that inservice-testing of certain ASME Coe Class 1, 2, and 3 pumps and valves be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda, excest where relief has been granted or proposed alternatives authorized )y the Commission pursuant to 50.55a(f)(6)(1),
(a)(3)(1), or (a)(3)(ii). Guidance on acceptable alternatives to Section XI requirements was provided in Generic letter 89-04, Guidance on Developing Acceptable Inservice Testing Programs, for certain aspects of IST.
The staff concludes that some of the relief requests as evaluated and modified in the enclosed safety evaluation will provide reasonable assurance of the operational readiness of the pumps and valves to perform their safety-related functions, provided NNEC0 makes the applicable modifications described in the relief requests during refueling outages 14 (1994) and 15 (1996). The staff has determined that granting relief pursuant to 10 CFR 50.55a(f)(6)(1) is nenn Q.J 0 0 [
Q k\\\\
='
s I
e a
Mr. John F. Opeka q l
i
- authorized by law and will not endanger life or property, or the common -
U defense and security and is otherwise in the public interest 'giving due consideration to the burden upon the licensee that could result if the -
requirements were imposed on the facility, j
for certain other items, relief is not granted and for truq has the staff has recuested the licensee to perform additional review M 9 inddress the relatec issues within 6 months f,*om the date of the-endoso wiety q
evaluation. These items are as follows:
Sections. 2.2, 2.2, 2.6. 3.9, and.
3.12, of the enclosed safety evaluation. Other sections may include actions-NNECO is to take in address provisions in the granting of relief. These
...i provisions should be incorporated into the inservice testing program within 6-l
- months from the date of the enclosed safety evaluation unless otherwise noted-in the safety evaluation.
.1 This request for information affects one respondent, and, therefore, is'not -
subject to Office of Management and Budget review under P.L.36-511.
Sincerely, Original signed by
- I John F. Stolz, Director-Project Directorate 1-4 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page Distribution:
Docket file SVarga GHill (2).
PD l-4 Plant JStolz OPA TMurley/FMiraglia SNorris OC/LfDCB JPartlow
.JAndersen-VMcCree, ED0 ERossi OGC LTDoerflein, RI JLieberman EJordan PCampbell See previous _ concurrence o m et LA:PDI-4 PM:PDI-4 1-D:PDI-4 OGC*-
SNb[
JAndersen:ch JStolz-JHull~
N Dn I//7/93 V /'7 /93
/ /93 2/2/93
/ /
OfflCIAL RECORD COPY L
Document Name:
G:\\ANDERSEN\\84917 P
i
,-._+#
\\ e "...,
..a.,,y,.
,,,m.,
A.,..,,6.,__-'.,.y,,.,.
._m.mo.,,mo mu.i.,_, l ml -,+.M J _ m... +3-,.'.--
r
- ~
.JA r
e, e---E
r; r
t' Mr. John F. Opeka.
Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit 1 Cc:
Gerald Garfield, Esquire R. H. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear, Operations Services Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company-Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region i Oepartment of Environmental Protection U.S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Allan Johanson, Assistant Director First Selectmen Office of Policy and Management Town of Waterford Policy Development and Planning Division Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Nuclear Station Director P. -0. Swetland, Resident -Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U.S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 513 Waterford, Connecticut 06385 Niantic, Connecticut 06357 H. F. Haynes, Nuclear Unit Director Millstone Unit No. 1 Northeast Nuclear Energy Company 4
Post Office Box 128 Waterford, Conne ticut 063B5 Nicholas S. Reynolds Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 L