ML20128P547

From kanterella
Jump to navigation Jump to search
Responds to NRC SE Re Util 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Section 2.5 of Updated Final Hazards Summary Rept Encl
Date released: 05/21/2020 Download: ML20128P547


Section 2.5 of Big Rock Point Updated Final Hazards Summary Rept.
ML20128P550
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/18/1993
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML20128P550 (25)
Responds to NRC SE Re Util 120-day Response to Suppl 1 to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Section 2.5 of Updated Final Hazards Summary Rept Encl
ML20128P545
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/18/1993
From: Beckham W
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR
Download: ML20128P545 (7)