Summary of 960920 Meeting W/Util to Discuss Scope & Schedule of 90-day Effort Proposed at 960911 Mgt Meeting.Meeting Participants,Utils Proposed Approach to Fall 1996 License Renewal Initiative, & Plant Tour Photos Encl
ML20128P489
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/11/1996
From: Scott Flanders
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9610170276
Download: ML20128P489 (15)


Text

sysn/M may k

yo UNITED STATES NUCLEAR REGULATORY COMMISSION E

IE WASHINoTON, D.C. 20555-0001

          • ,o October 11, 1996 ORGANIZATION:

Baltimore Gas and Electric

SUBJECT:

SUMMARY

OF MEETING WITH BALTIM0RE GAS AND ELECTRIC COMPANY (BGE) ON BGE LICENSE RENEWAL ACTIVITIES On September 20, 1996, the Nuclear Regulatory Commission (NRC) staff met with representatives of Baltimore Gas and Electric Company (BGE) to discuss the scope and schedule of the 90-day effort proposed at the September 11, 1996, management meeting.

2 At the September 11, 1996, NRC/BGE management meeting, NRC management proposed a 90-day review effort to fully exercise the template with respect to the key issues (intended functions, operating experience, and corrective actions) identified during the management meeting.

The focus of this meeting was to determine the scope and schedule for the 90-day effort.

Attachntent 1 is a list of meeting attendees and Attachment 2 is a copy of the material distributed during the meeting.

The staff and BGE first discussed the scope of the 90-day review effort.

BGE proposed to focus on three reports for this effort, Component Supports, Main Feedwater, and Structures.

To address the intended function issue, BGE stated that they would revise the reports to meet sections I.A and I.B of the BGE template.

BGE also stated that the revised reports woald attempt to address the comments made by NRC management during the September 11, 1996, meeting concerning intended functions.

To facilitate the discussion on intended functions, an on-site review of design information was added to the scope.

To address the issues of corrective actions and operating experience, BGE stated that it wuld focus on one component / structure type and revise the reports, for that component type, to meet section II of the template.

For the feedwater report, BGE intends to focus on carbon steel piping, for the component supports report BGE will focus on piping hangers, and for the structures report BGE will focus on the auxiliary building.

Coincident with the 90 day effort, the staff and BGE agreed to include technical discussions on BGE license renewal activities for cables.

To initiate this activity, a meeting has been scheduled for October 16, 1996.

This meeting will include discussions on EQ and Non-EQ cable activities for (79

(

license renewal.

This meeting will be used to develop the 90 day scope and j

schedule for this activity.

BGE proposed a schedule for the 90-day effort (see attachment 2).

The staff agreed to the proposed schedule.

The on-site discussion of design information was added to the schedule. This activity is scheduled for October 10, 1996.

(

9610170276 961011 PDR ADOCK 05000317 P

PDR ggg Qh

October 11, 1996 Baltimore Gas and Electric 2-At the conclusion of the meeting.-BGE stated that coincident with this 90 day effort it is addressing the staff's request for additional information (RAI) issued August 30. 1996, and-is continuing to produce new reports, in accordance with the template, for submittal to.the staff in the first quarter of 1997.- Attachment 3 is a copy of photographs taken during the September ll.

1996, tour.

l Scott C. Flanders. Project Manager original signed by License Renewal Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket Nos.:

50-317 and 50-318 Attachments:

1.

Attendance List 2.

Meeting Handouts cc w/ attachments:

See next page DISTRIBUTION w/ attachments.

DISTRIBUTION w/o attachments:

Nth " '

Nf2bl R

Ci H21 n

DISTRIBUTION via e-mail w/o attactments:

ACRS. T-2 E26 ko R (

s Ti F

)

Sta, R

ogg ti 0 CD) e)b i e 0 15 818 CSerpan. RES (CZS)

BSheron, 0-7 D26 GBagcht. NRR (GXB1)

DOCUMENT NAME:To tsceiv3 a copy of this doc /

S (SF1anders/LLM Disk) q t, Indicate in the boa: "C* = Copy yithout attachment / enclosure "E* = Copy with attachrnent/enckisure "N* = No copy 0FFICE PM:PDtK)/

l D:PDLR p'[g-f l

l

[

NAME SFlanders/llm SFNewber rf DATE

/v/ // /96 d /// /96 0FFICIAL RECORD COPY.

October 11, 1996 Calvert Cliffs Nuclear Power Plant Baltimore Gas & Electric Company Unit Nos. I and 2 cc:

President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Connission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, Md 20678 6 St. Paul Centre D. A. Brune, Esquire General Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Company Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, M0 21203 Suite 2101 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge Patricia 1. Birnie Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Terrence J. Camilleri, Director, Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Larry Bell 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Resident Inspector c/o U.S. Nuclear Regulatory Mr. Charles H. Cruse Commission Vice President - Nuclear Energy P.O. Box 287 Baltimore Gas and Electric Company St. Leonard, MD 20685 Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Mr. Richard I. McLean Lusby, MD 20657-4702 Administrator - Radioecology Department of Natural Resources 580 Taylor Avenue Tawes State Office Building B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

. - esp 9

i 1

ATTENDANCE LIST NRC MEETING WITH BALTIM0RE GAS AND ELECTRIC COMPAN1 Seotember 20. 1996 i

NAME ORGANIZATION 1.

Barth Doroshuk BGE 4

~

2.

Don Shaw BGE 3.

Steve Hoffman NRC/NRR/DRPM/PDLR 4.

Sam Lee NRC/NRR/DRPM/PDLR 5.

P. T. Kuo NRC/NRR/DRPM/PDLR 6.

Scott Flanders NRC/NRR/DRPM/PDLR l

7.

8.

9.

10.

11.

l 12.

13.

14.

1 15.

16.

l 17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

i 29.

30.

31.

32.

33.

34.

35.

36.

l 37.

35.

2r i

.s.

\\

41.

42.

BGE's proposed approach to the Fall 1996 License Renewal initiative Week Date Location Event 1

Friday, September 20 White rant Kickoff meeting, scope of work, schedule agreement.

2

- work in progress -

3

- work in progress -

4 Thursday, October 10 CCNPP BGE presents scoping / functions samples (Template sections I.A. and B.) and on-site scoping results to NRC for Feedwater, Structures, Supports.

5 Thursday, Jctober 17 CCNPP NRC returns to site for further review of documentation.

6 Thursday, October 24 White Flint NRC provide final scoping / functions comments, reach resolution. BGE deliver demonstration pieces for Feedwater, Structures, Supports selected component types.

7 NRE.T,5 ishop on NELpUot

- work in progress -

h thu seek 8

Thursday, November 7 CCNPP NRC site visit for purposes ofinspection guide development.

9 Thursday, November 14 White Flint NRC feedback on acidonstration, reach resolution.

10 Thursday, November 21 White Flint Final comments on all LR activities. Plans for management meeting.

I1 Thanksgiving week I2

- preparations in progress -

13 Thursday, December 12 CCNPP Senior Management Meeting.

I w

l

'\\

1

' 'y l

i 1

i Calvert Cliffs Nuclear Power Plant License RenewalProject 1

l l

{

l Plant To"*

i i

l September

,1996 l

1 i

l I

(

l l

l l

m,

i i

i i

I I

y ii

\\

l

,; 2.

.--e j

fp' 3

'W i

i

.M i-'

j e

1.

Fuel Oil Storage Tank No. 21 Enclosure - South Side l

~~--r-,

t

.a 4

j 8

i

[

l i

4 i

s j

i d

2.

Inside Fuel Oil Storage Tank No. 21 Enclosure - Vent Pipe, Steel Decking csuan,w a.w,.mxaww:rumnsawenneaanma~ amens--

\\

l c ;-,

l l

i i

l I

i i

i l

33%

l l

~

W i

i i

J I

i b

i 3.

Fuel Oil Storage Tank No.11; Fuel Oil Unloading Station in Foreground i

l i

Qpe l

,..;g

~

m

\\

_. q) e

  • ~
  • g.- g 2

'?. +

e i

N l

j f

4.

Unit I Containment - North Side; Grease Mark i

}

,.m, c

.m,,,,,,,,,,,,,,,,,__

i,

i 4

l t

()

'9 !

5.

Condensate Storage Tank No.12 Enclosure - South Side 4 -

as-.

'.12 s:

(

I i

?

I-i

'.. ((

6.

Intake Structure - North to South View

-..i

.-.-,,.-..,.---y.

e-,

i l

l P

4 O

i i3

  • W i

s W

I y

s sum t

l l

~

I l

I i

i 1

7 7.

Inside Intake Structure Pump Room I

i l

l l

lH*** -

T; i

i l

i 4

5 l

l t

i Et.

.g g.

I 8

8.

Intake Structure Pump Room - Component Supports

.1

..wg e...

s.

l i

f i

j a

i L

i I

1 l

l l

I i

9.

Unit 2 Auxiliary Feedwater Pump Room \\

{

t Ii I

i TQ:q f

.y ut ut e:

, r: y

.V, qr.3

' q t+ ;

'tu

,k J

n

_q

(:% nl

.x.n a;#

j,'p,V 3;$

~

l.,,'Q;.g :g/,

t l

1 g

1

,y,

j. Y ;.C i

10.

Containment Tendon Grease Caps - Unit 169' Elevation

.~..m._

- - - ~ ~,, _ _ - -. _ _.. - - - - ~ _. _ _ -..

ii i

i 5

l t

f i

4

.a

(

d k

t

{

,;y

-" ' A,kh..__

j p'

i 5

y.

. 7,--

3

.,u..

UH 1 1

i l

11.

Cable Tray Temperature Monitoring Probes s

l

/

1

+T

(

- g

-1 y

W i

~

lk$

i 3*

/

l g.. g r -

\\

s A'

t 12.

Unit 2 Main Feedwater Regulating Station - Turbine Huilding

1 i

j y-- -.,T,_,p 4

,77 -

?. tf y'} W._,___

r

  • e

,y l

'f I.N!

?,

I,',

V 4 hi r

'4 s;

9

-t 5:,

l i'

A

?bc.

j

..M IN,

  • l i.

i

4
e; i; ' i i '; l? "

l

.j- :QA

.y:.,,,;..

+

4M' i

b i

1 13.

Wide Range Noble Gas Monitor - Insulated Sample Tubing 1

1 4

.h hh j

.T

&a l

%b d1 g

}

l i

i 14.

Wide Range Noble Gas Monitor - Equipment Skids w -

-mr-we

-eew,-w---

,w.-m, e-w-

w-

-,-y---

. - ' ~ - - - - - -

--,-----y-

---we-m

-ww

-m

,c-me-w,w--

3 l

Ty jl i gl7"7M ?

j!

g r mE U "'li

l

~~

l

[

, q a

i I

n.h :

~,

i g }{

M lt

.,[? s

{'

l E D N WI f

ll f.

{?

f

( l

}f J h,

['

i,

}

4 l

1 j

i I

sm j

f i

l 15.

Control Room Radiation Monitor t

i 1

w~

N lb%

ja 47

-~*

j hw m T

t 6%.,,

wh; W.;; j

- P t

l

'2

..i

,6 f b.

l i-

La 16.

Unit 1 Feedwater Line, Motor Operated Isolation Valve, Seismic Anchor - MSIV Room

l I

i h

i I

i i

j

- t,...-

I

l 7

p.,

l j

.a

.s..

a.

l I

l l

I I

17.

Unit 1 Feedwater Line, Motor Operated Isolation Valve - MSIV Room f

i i

l

..y
:: ~ = -

2 g

l

'!l4 i

4')

[Wl '

.2s.1._.

_j.

wu

~.cs

,M 18.

Component Cooling System Radiation Monitor j

_____._______,__.--_______.______---*w-m

.mv

-