3
+
e
- -./3
+-
us
' Portland General Electric Company :
a 1
y James E. Cross-
]
Vice President and Chief Nuclear Officer.
-l February 17,1993)
Trojan Nuclear Plant
. Docket 50-344 License NPF-1i 1
U. S. Nuclear Regulatory Commission
' Attn: Document Control Desk Washington, DC 20555
Dear Sirs:
. Prelusion of Fuel Movement into Containment By letter dated January 27,1993, Portland General Electric (PGE) submitted License Change =
Application (LCA) 229, requesting modification of the Trojan operating license to a-
" Possession Only License". - LCA 229 removes on a permanent t, asis PGE's authorization to operate Trojan as a nuclear generating station.
Additionally, by letter cated February 2,1993, PGE certified to the Nuclear Regulatory Commission (NRC) that the fuel had been permanently removed from the reactor vessel at -
Trojan and had been placed in the spent fuel pool, thus placing the unit in a permanently shutdown and defueled condition.
This letter certifies that PGE will not move fuel back into the containment [ building at Tr' jan o
withc,ut prior NRC approval.
Sincerely, 220115
- /
-R. D. Mafi on
- for J. E. Cross c:
Mr. John B. Martin Regional Administrator, Region V U. S. Nuclear Regulatory Commission it I h-b 9302230265 930217-pn cxosoog4 i SW Salmon Street, Portland, OR 97204 -
b A
-503/464-8897'
4 Dpcument Control Desk
, February 17,1993 j
P3sc.2 Mr. David Stewart-Smith State of Oregon Department of Energy Mr. Kenneth Johnston h%C Resident inspector Trojan Nuclear Plant