ML20128N491

From kanterella
Jump to navigation Jump to search
Notification of 930224 Meeting W/Licensee in Monroeville,Pa to Review Overall Status of AP600 Project,Including Test Program Status & Schedules & AP600 Probabilistic Risk Assessment.Meeting Agenda & Directions Encl
ML20128N491
Person / Time
Site: 05200003
Issue date: 02/17/1993
From: Borchardt R
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9302230259
Download: ML20128N491 (5)


Text

.

3 4#p* *touq'o UNITED STATES

[ 3m'g'g NUCLEAR REGULATORY COMMISSION

$ c- t WASHINGTON, D. C. 20555 j February 17, 1993 k....+) 1 Docket No.52-003  !

i MEMORANDUM FOR: T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger i

W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, EDO T. Gody B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU: Richard W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM: Frederick W. Hasselberg, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal-Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - NOTICE OF SENIOR MANAGEMENT MEETING WITH WESTINGHOUSE DATE AND TIME: February 24, 1993 (8:30 a.m. - 2 p.m.)

LOCATION: Westinghouse En.srgy Center (WEC) flanroeville, Pennsylvania PURPOSE: To review the overall status of the AP600 project, including -

test program status and schedules, the AP600 probabilistic risk assessment (PRA), and AP600 inspections, tests,. analy-ses, and acceptance criteria (ITAAC). A meeting agenda and directions to the WEC are enclosed.

Ifp.le: Proprietary features of the AP600 design will be discussed.

[

9302230259 930217 PDR (

A ADOCK 05200003 tp pop

-- m E

, , l' /

February 17, 1993 PARTICIPANTS *: 113 1 WESTINGHOUSE T. Murley N. Liparulo D. Crutchfield B. McIntyre A. Thadani J. Butler R. Borchardt A. Sterdis T. Kenyon et al.

F. Hasselberg

()dM g Frederick W. Hasselberg, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosures:

1. Meeting Agenda
2. Directions to WEC cc w/ enclosures:

See next page

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Lederal Reoister 20858, June 28,1978. However, portions of this meeting may be closed to protect Westinghouse proprietary information.

Members of the public who wish to attend should contact me at (301) 504-1141.

DISTRIBUTION:

Central File PDST R/F RBorchardt PDR RHasselberg TKenyon GGrant, ED0 PShea JMoore, 15818 ACRS (ll)(w/o enc) P0' Dell, PTSB CMcCracken, 8D1 BPerch, 8H7 SBajwa Achaffee, EAB EJordan, MNBB3701 NRR Mailroom, 12G18 0FC: LA:PDST:ADAR PM:PDST:ADAR SC:PgT:ADAk NAME: PShea j FHass,pJ h z RBohardt DATE:

02/fNh3 02/17/93 02/[~[/93 _

0FFICIAL DOCUMENT COPY: MTG224S.RH

Docket No.52-003 Westinghouse Electric Corporation cc: Mr. Nicholas J. Liparulo Nuclear Safety and r,egulatory Analysis Nuclear and Aovanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. B. A. McIntyre Advanced Plant Safety & Licensing Westinghouse Electric Corr. oration Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. John C. Butler Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Penn;ylvania 15230 Mr. H. D. Beaumont Nuclear and Advanced Technology Division Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike Suite 350 Rockville, Maryland 20352 Mr. Sterling Franks ^

U. S. Department of Energy NE-42 Washington, D.C. 20585 Mr. S. M. Modro EG&G Idaho inc.

Post Office Box 1625 Idaho Falls, Idaho 83415 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C. 20503

. l

.n Possible Agenda  ;

Westinghouse /NRR Senior Management Meeting -

February 24, 1993 8:30 am - 2:00 pm Introductions and Overview of AP600 Project Regulatory-Treatment of Non-Safety Systems Defence-In-Depth in Passive Systems AP600 Critical Components / Reliability Assumptions Shutdown Capability Hurricane Andrew / Beyond 72 Hours AP600 ITAAC Screening Criteria ,

Overview of Westinghouse ITAAC Approach AP600 Testing Program

  • Overview of Test Program Status and Schedules Plans for tisits to Test Facilities Testing of Check Valves AP600 PRA Initiating Event Frequency Calculations PRA Reliability PRA Insight Implementation

.7 Foreign Assignee's Access to Westinghouse P oprietary Material Enclosure 1


~

TRAVEL TO WESTINGHOUSE ENERGY CENTER (WEC) MONROEVILLE. PA AIRPORT - WESTINGHOUSE ENERGY CENTER IS APPROXIMATCLY 32 HILES LOCAL CONTACT - BRIAN McINTYRE - 412-374-4334 RADISSON HOTEL 412-373-7300 101 MALL BLVD PALACE INN 412-372-5500 MOSSIDE BLVD HOWARD JOHNSONS 412-372-1022 2750 MOSSiDE BLVD RED ROOF INN 412-856-4738 2729 MOSSIDE BLVD C 1 LJ l \-

~

e

,/ dE'If. { _

\ p 7 \ g P g,,, . 47' N  % 3"'"" '"'r--$7 Jc -is"i~,/ "." x tw n

u * *5 a=

mat. i.e i

.., C PENN

4 '* ,

l

,l,laT=,,,

%g

[Tl','l.!0,,,,4 i

$ ~WEC TURNPIKE EXIT 6-8 *'%,

g p

sentet Oms ra0s asar0er:

i. ra0m tot sata:Es portsevaan anar0st r0tt0w a0ert se TOwano rettsseman aus staat Oman int pasavat ts-tre) p m 2. Tatt A09ff 8-3F9 INtegen 1Mt FORT PITI fututt 81aftst is ful AIGNT-mass tant 10 1585 Osf0 885ft 8-378. ,

3 s. Ps0s MOWaA8t-steJONN90k't; transvartN0180av tant mona0testtt 8BN. Ent0T test te-a.3007 Inc. RES acert esAEE tRE s0sta.04 80 tit 40.

3 4.

FOR Tut AaSts905 TWRN aleNT af FIRST itaFFIC tISMT 05 505ft et. ORfC 35. PENN M8SNWaY (988tatte 305ft it).

O y,

S.

EttF $0 int trit TNay-tant as0 fues tiri AftER 38095 7 tBSWIS Out tient AFits THE ratsE B1088*8 L8ent es get fut c -WatL ERTRaNgt On fut stent aS0WI fft WlLE FOR1Nta 9035

~

b m . _

____1_ __