ML20128N178

From kanterella
Jump to navigation Jump to search

Approves Licensee Proposed Use of Rechanneled Fuel Assemblies in 930118 Core Operating Limits Rept for Cycle 6 Operation of Plant
ML20128N178
Person / Time
Site: LaSalle 
Issue date: 02/18/1993
From: Robert Stransky
Office of Nuclear Reactor Regulation
To: Kovach T
COMMONWEALTH EDISON CO.
References
IEB-90-002, IEB-90-2, TAC-M85494, NUDOCS 9302230123
Download: ML20128N178 (2)


Text

- -.

1 jf February 18, 1993 7

a 1

Docket No. 50-373 DISTRIBUTION:..

B. Clayton RIII

~

Docket File NRC.& Local PDRs Mr. Thomas J. Kovach PDIII-2 r/f' J. Roe Nuclear Licensing Manager J. Zwolinski J. Dyer l

Ccamonwealth Edison Company-Suite 300 R. Stransky.

C. Moore OPUS West III OGC R. Jones 1400 OPUS P1 ace

.ACRS-(10)

PDIII-2 p/f j_

Downers Grove, Illinois 60515 l

SUBJECT:

LASALLE COUNTY STATION, UNIT 1 - CYCLE 6 CORE OPERATING LIMITS l

REPORT (TAC NO. M85494)

By letter dated January 18, 1993, the Commonwealth Edison Company (CECO) submitted the Core Operating Limits Report (COLR) for Cycle 6 operation of the 3

LaSalle County Station, Unit -1.

In your. letter, you -indicated your intention j

to use 156 fuel assemblies which.have.previously irradiated fuel channels j

attached to them.

You stated that these assemblies had been rechanneled prior to the issuance of NRC Bulletin No. 90-02, " Loss of Thermal Margin Caused by l

Channel Box Bow," (Bulletin) and that these fuel assemblies will-be placed i

only in non-limiting locations near the periphery:of the core.

l The staff has reviewed your submittal for compliance with the staff position i

set forth in tne Bulletin and with our September 29, 1992, Safety Evaluation j

(SE) regarding the.use of rechanneled fuel during Unit 1 Cycle 6.

We have determined that your proposed use of these rechanneled fuel assemblies is-consistent with both the Bulletin and SE regarding this issue and is, therefore, acceptable. This concludes staff activities regarding your Cycle 6 l

Core Operating Limits Report under TAC No. M85494.

b Please note that the staff has not reviewed the applicability or acceptability of other aspects of your Cycle 6 COLR, and has-no intention to do so in the-near future. Also be advised that, although the staff has previously approved the reuse of fuel channels for Unit 1 Cycle 6, any future-reuse of fuel channels must be evaluated by the staff on a cycle specific. basis.

If you have any questions regarding this letter, please contact me at'(301) 504-1346.

l-

_ Sincerely, Original signed by:

l Robert J. Stransky, Project Manager Project Directorate III-2 l

Division of Reactor Projects - III/IV/V j

Office of Nuclear Reactor Regulation-i-

cc:

See next page (AhD3II2 I PM:PD_LLI-2 BC:SRXBO D:PDIII-2--

OFFICE N

6 RS M kyD RJofek JDyer N _

I q

I 2/ 993 NE[93 2/JtR3 2//h/93-1 o^1E e

k, Y

I 9302230123 93021e "

6 PDR ADOCK 05000373 PUR i

Q

%r-

~

h. _- J

=

a..

.. - z.. w - -

1

___e._m.

_m h'

v i

Mr. Thomas J. Kovach LaSalle County Station Commonwealth Edison Company Unit Nos. I and 2 l'

-cc:

?

Phillip P. Steptoe, Esquire Robert Cushing Sidley and Austin Chief,-Public Utilities Division l

One First National Plaza Illinois Attorney General's Office Chicago, Illinois 60603 100 West Randolph Street Chicago, Illinois - 60601 j-Assistant Attorney. General 100 West Randolph Street

- Michael I._ Miller, Esquire Suite 12 Sidley and Austin l-Chicago, Illinois 60601 One First National Plaza-i Chicago, Illinois.60690 Resident Inspector /LaSalle, NPS i

U. S. Nuclear Regulatory Commission Mr. G..Diederich.

I Rural Route No. -1 LaSalle Station Manager l

P. O. Box 224 LaSalle County Station Marseilles, Illinois 61341 Rural _ Route 1 i

P.-0.-Box 220 i

Chairman-Marseilles, Illinois-61341 LaSalle County Board of Supervisors LaSalle County Courthouse 3

j Ottawa, Illinois 61350 I

Attorney General 500 South 2nd Street j-Springfield, Illinois 62701 i

Chairman Illinois Commerce Commission i

Leland Building 527 East Capitol Avenue Springfield, Illinois: 62706~.

i Illinois Department of Nuclear Safety-Office of Nuclear Facility Safety 1

1035 Outer Park Drive-l Springfield, Illinois _62704 Regional Administrator, Region III U. S. Nuclear Regulatory Conaission i

799 Roosevelt Road, Bldg. #4 l

Glen Ellyn, Illinois 60137

) '

Office of Public Counsel Robert Neuman

-State of. Illinois Center i-100 W. Randolph i

Suite 11-300-

~

Chicago, Illinois 60601 i

j..

i i

-,. -, _., _., _, -. _, -,