APPENDIX A
' Gulf States-Utilities.
-Docket: '50-458/85-23
River Bend Station
Permit: CPPR-145
Based on the results of an NRC inspection conducted during the period of
March I through. April 30, 1985, and-in accordance with the NRC Enforcement
Policy (10 CFR Part 2, Appendix C), 49 FR 8587, dated March 1984, the following
violations were identified:
1..
Failure to Monitor Temperature
10 CFR Part 50, Appendix B, Criterion V, and the licensee's approved
.
quality assurance program require that activities affecting the quality of
safety-related systems and components be prescribed by and accomplished in
accordance with-approved instructions, procedures, and drawings.
Standard ANSI N510-1980, requires the .use of a _ temperature indicating'
device accurate and readable to + or - 0.5 F. to verify isothermal
.
'
conditions for the direct measurement method of air cleaning systems duct
' leakage' testing.
' Contrary to the above, the procedure,used for the conduct of the HVAC
systems duct leakage testing at River Bend did not. require the use of a
temperature indicating _ device and no temperature monitoring was: conducted
-during leak testing performance.
This is a Severity Level IV Violation. '(Supplement II D) (458-8523-03)-
2.
Failure to Calibrate Gas Meter in Range of Use
10 CFR Part 50, Appendix B, Criterion XII, and the licensee's' approved
quality assurance program require that measuring and testing devices used
in_ activities affecting quality be properly calibrated and adjusted at
specified periods to maintain accuracy within necessary limits.
>
Contrary to the above, the Singer Company Model DMT-325, Control
No.12789, gas meter used for HVAC duct air leakage. testing was not
>
calibrated in range of use (e.g., calibration performed at 10 cubic feet
and instrument used at 20 cubic feet per minute). Also, the vendor manual
for' the gas meter only gives a nominal capacity of approximately 5 cubic
feet per minute.
This is'a' Severity Level IV Violation.
(Supplement II D) (458-8523-04)
8506030161 850529
$DR
ADOCK 05000458
.
g
-
.
-2-
~3.-
Failure to Follow Procedure
10 CFR.Part 50, Appendix B, Criterion V, and the licensee's approved
quality assurance program require that activities affecting the quality of
- safety-related systems and components be prescribed by and accomplished in
accordance with approved instructions, procedures, and drawings.
Test Instruction (TI) 8' requires the supervisor of startup test to stamp
preoperational test procedures to establish notification points for
' operations quality assurance prior to approval of the test for
~
performance.
Contrary to the above, preoperational test procedure 1-PT-210, " Integrated
ECCS and Loss of Offsite Power," was approved for performance without the
~ procedure being stamped to establish notification points for operations
quality assurance.
This is a Severity Level V Violation.
(Supplement II D) (458-8523-02)
Pursuant to the provisions of 10 CFR 2.201, Gulf States Utilities is hereby
required to submit to this office, within 30 days of the date of this Notice, a
written statement or explanation in reply, includin
(1) the corrective steps
which have been taken and the results achieved; (2)g: corrective steps which will
be taken to avoid further violations; and (3) the date when' full compliance
.
will be. achieved. Consideration may be given to extending your response time
l
for good cause shown.
l
MAY 2 91985
Dated:
.