HL-5230, Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV

From kanterella
(Redirected from ML20128M857)
Jump to navigation Jump to search
Application for Amends to Licenses DPR-57 & NPF-5,revising SRs 3.1.7.7 & 3.4.3.1 & LCOs 3.4.3,3.5.1 & 3.6.1.6 to Increase Nominal Mechanical Pressure Relief Setpoints for All SRVs & Allow Operation W/One SRV
ML20128M857
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/07/1996
From: Woodard J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19355E458 List:
References
HL-5230, NUDOCS 9610160204
Download: ML20128M857 (9)


Text

________ _________ __ _ __________ - __ _ _ _ _ -

Georgia Power Company 333 Piedmont Avenue Atlanta. Georgia 30308 j

Telephone 404 526 3195 Maliing Address 40 inverness Center Parkway Post Othee Box 1295 Birmingham. Alabama 35201 Telephone 205 868 5086 J. D. Woodatd the sanhern acctnc system Senior Vice President Docket Nos. 50-321 50-366 HL-5230 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 EM I. Hatch Nuclear Plant Request to Revise Technical Specifications:

Safetv/ Relief Vah>e Servoint Change Gentlemen:

In accordance with the provisions of 10 CFR 50.90, as required by 10 CFR 50.59(c)(1),

Georgia Power Company (GPC) hereby proposes changes to the Plant Hatch Unit I and Unit 2 Technical Specifications, Appendix A to Operating Licenses DPR-57 and NPF-5, respectively. The proposed changes revise Surveillance Requirements (SRs) 3.1.7.7 and 3.4.3.1, and Limiting Conditions for Operation (LCOs) 3.4.3, 3.5.1, and 3.6.1.6 to increase the nominal mechanical pressure relief setpoints for all safety / relief valves (S/RVs) and allow operation with one S/RV and its associated functions inoperable. The proposed changes will reduce the potential for S/RV pilot leakage and the potential for forced outages due to an inoperable S/RV during a fuel cycle. provides a description of and justification for each proposed change. details the bases for GPC's determination that the proposed changes do not involve a significant hazards consideration. Enclosure 3 provides page change instructions for incorporating the revised Technical Specifications pages. Following Enclosure 3 are the revised Technical Specifications pages, as wd1 as the corresponding marked-up pages. provides, for your information, the proposed Bases pages associated with the proposed Technical Specifications changes. The revised Bases pages will be made effective concurrently with the approved Technical Specifications changes. Enclosure 5 contains a General Electric Company proprietary report which details the safety analyses performed in support of the proposed change. Enclosure 6 provides a GE affidavit for the report.

The optimum time to implement the proposed changes is during a scheduled refueling

{

J outage when all of the 11 S/RV topworks can be reset and leak tested prior to reassembly.

9610160204 961007

/

PDR ADOCK 05000321 P

PDR L8 L'~~M

~

cfp/ge.'pC fN lY

Georgia Power d 2

U. S. Nuclear Regulatory Commission Page 2 October 7, 1996 The next Unit 2 refueling outage is currently scheduled for March 15,1997, and the next Unit I refueling outage is scheduled for Fall 1997. Therefore, to suppon the upcoming Unit 2 outage, GPC requests that the NRC review and approve the amendments no later than March 7,1997. A refueling outage on each unit will be required to implement the S/RV setpoint changes. Thus, GPC requests a deviation from the normal 30-day implementation schedule, such that once the proposed amendment is approved, it be issued with an immediate effective date, with implementation prior to startup from the respective refueling outages.

In accordance with the requirements of 10 CFR 50.91, the designated State official will be sent a copy of this letter and all applicable enclosures.

1 Mr. J. D. Woodard states he is Senior Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and to the best of his knowledge and belief, the facts set fonh in this letter are true.

Sincerely, i

J.

. Woodard

! nandsubscribedbefor me this f dayof 0M

,1996.

Su i DbDd[

~W

'~

At ion f

8 JAW /eb

Enclosures:

1. Basis and Justification for Change Request 2.

10 CFR 50.92 Evaluation

3. Technical Specifications Page Change Instructions
4. Bases Changes
5. GE Report NEDC-32041P, " Safety Review for Edwin I. Hatch Nuclear Power Plant Units 1 and 2 Updated Safety / Relief Valve Performance Requirements,"

Revision 2 (Proprietary), April 1996.

6. GE Affidavit for NEDC-32041P c::: (See next page.)

HL-5230

Georgia Power d U. S. Nuclear Regulatory Commission Page 3 October 7, 1996 i

cc: Georeia Power Company Mr..H. L. Sumner, Nuclear Plant General Manager NORMS U. S. Nuclear Rendatory Commission. Washington. D. C.

l Mr. K. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Rendatore Commission. Region H

^

Mr. S. D. Ebneter, Regwnal Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch State ofGeoreia Mr. J. D. Tanner, Commissioner - Department of Natural Resources l

HL-5230

'I

1 i

I Edwin I. Hatch Nuclear Plant

(

Request to Revise Technical Specifications:

Safety / Relief Valve Setpoint Change

{

Basis for Chance Reauest i

1 Georgia Power Company (GPC) proposes to revise Plant Hatch Unit 1 and Unit 2 Technical Specifications to increase the nominal mechanical relief setpoints for all of the -

l 1 I safety / relief valves (SRVs) to 1150 psig and allow operation with one S/RV and its i

associated functions inoperable. Changes are proposed to Surveillance Requirements 3.1.7.7 and 3.4.3.1, and Limiting Conditions for Operation (LCOs) 3.4.3,3.5.1, and j

3.6.1.6.

j.

The current Technical Specifications require that during continuous operation, all of the i

11 S/RVs remain OPERABLE in the safety mode,7 in the Automatic Depressurization l

System (ADS) mode, and 4 in the Low-Low Set (LLS) mode. If one S/RV is inoperable j

for longer than the duration specified in the applicable Action Statements, the plant must be placed in a Cold Shutdown Condition. Analyses have been completed which show that, with one S/RV out of service, all transient / accident criteria can still be met.

j Increasing the nominal mechanical relief setpoints will increase the simmer margin (i.e.,

}

the difference between the S/RV setpoints and the vessel steam dome pressure), thereby potentially reducing S/RV pilot leakage which may occur during a typical operating i

cycle. As a result ofincreasing the mechanical relief setpoints for the S/RVs, the Standby Liquid Control (SLC) System pump test discharge pressure is increased to 1232 psig.

The HPCI and RCIC systems are capable of operating at this increased pressure.

In support of the proposed changes, General Electric (GE) prepared and issued NEDC-32041P," Safety Review for Edwin I. Hatch Nuclear Power Plant Units 1 and 2 Updated Safety / Relief Valve Performance Requirements," Revision 2, dated April 1996, which is provided in Enclosure 5. The GE Affidavit for NEDC-32041P is provided in.

PROPOSED CHANGES Unless noted otherwise, the proposed changes apply to both Unit I and Unit 2.

Pronosed Chance One In SR 3.1.7.7, the SLC pump test discharge pressure is increased from 1201 psig to 1232 psig.

HL-5230 El-1 W.

Basis for Change Request i

Justification for Proposed Chanee One The increase in the SLC pump discharge pressure corresponds to the increase in the S/RV mechanical relief setpoints which is discussed in detail in Proposed Change Two, and the pressure drop that occurs between the pump and the RPV. The original pump discharge j

pressure (1201 psig) was based on the minimum S/RV lift pressure of 1120 psig for both Units 1 and 2 (even though the Unit I lowest setpoint was 1110 psig).

l The 31 psi increase is equivalent to the increase of the current lowest setpoint to the new setpoint, including the 3% tolerance. (The lowest setpoint and tolerance is 1120 psig

+ 3%, which is 1154 ps'g. The new setpoint and tolerance is 1150 psig + 3%, which is -

1185 psig. Thus, the increase is equal to the maximum increase in setpoints, or 1185 psig minus 1154 psig, or 31 psig.)

The SLC pumps are positive displacement pumps, which deliver a constant flow rate regardless of discharge pressure. The pump motors are 40 hp, which are adequate for the pressure increase. The system design pressure is adequate for the increase in operating pressure.

Proposed Chanee Two In LCO 3.4.3, the number of S/RVs that shall be OPERABLE is changed from "11" to "10 of 11." In SR 3.4.3.1, the nominal mechanical trip setpoints for all of the 11 S/RVs are increased to 1150 psig i 34.5 psi. In LCO 3.5.1, the number of ADS S/RVs that shall be OPERABLE is changed from "seven" to "six of seven." In LCO 3.6.1.6, the number of LLS valves that shall be OPERABLE is changed from "four" to "three of four". The Conditions, Required Actions, and Completion Times associated with Technical Specifications 3.4.3,3.5.1, and 3.6.1.6 are revised to remove the requirements for one S/RV inoperable.

Justification for Proposed Change Two Currently, the electronic pressure switch actuation nominal trip setpoints are identical to the nominal mechanical trip setpoints. Following this change, the electronic pressure switches will retain S/RV groupings with staggered setpoints, below the requested mechanical setpoint of 1150 psig. The current Technical Specifications require S/RV setpoints to be within a 3% tolerance as follows:

Unit 1 Unit 2 4 S/RVs set at 1110133.3 psig 4 S/RVs set at 1120 i 33.6 psig 4 S/RVs set at 1120133.6 psig 4 S/RVs set at 1130 33.9 psig l

3 S/RVs set at 1130133.9 psig 3 S/RVs set at 1140134.2 psig i

1 l

HL-5230 El-2

Basis for Change Request NEDC-32041P (Enclosure 5) provides a detailed justification for allowing an upper value mechanical S/RV relief setpoint as high as 1195 psig, with one S/RV inoperable and allowing at least 50 psi margin to the ASME code upset limit (1375 psig). The 1195 psig upper limit bounds the 1150 psig nominal setpoint with a 3% drift. The GE evaluations also support additional changes to the S/RV performance requirements, allowing operation with one S/RV inoperable in the safety / relief mode, the ADS mode, and the LLS mode. Note that in the current Technical Specifications bases, it has been demonstrated that only 8 to 9 S/RVs are required in the safety / relief mode to maintain the reactor vessel below 1375 psig. Table 1-1 of NEDC-32041P compares the present and proposed Unit I and Unit 2 S/RV performance requirements. The following is a brief description of the analyses discussed in Enclosure 4:

Vessel Overpressure Analysis - Section 3.0 shows that an approximate 50 psi margin to the ASME Code upset limit for main steam isolation valve (MSIV) closure with flux scram is maintained. The analysis assumes one inoperable S/RV; 102% of 2558 MWt initial power; an initial steam dome pressure of 1058 psig, which is & Technical Specifications limit; and a 3% drift of the S/RV mechanical relief setpoint Note that this event is reanalyzed each cycle.

ThermalLimits - Section 4.0 shows that the fuel thermal limits; i. e., MINIMUM CRITICAL POWER RATIO (MCPR), are not affected by the proposed increase in the S/RV nominal setpoints, or by having only 10 of 11 S/RVs OPERABLE. Note that limiting transient events are reanalyzed each cycle.

ECCS/LOCA - Section 5.0 shows that the performance of the Emergency Core Cooling Systems (ECCS) is not significantly affected by the increase in nominal S/RV setpoint. ADS perfonnance and the resulting peak clad temperatures following a loss of coolant accident (LOCA) are not significantly affected by having one inoperable ADS S/RV. Large-break LOCAs, which are limiting for Plant Hatch, are not affected by this change.

High Pressure System Performance - Section 6.0 shows that the performance of the High Pressure Coolant Injection (HPCI) and the Reactor Core Isolation Cooling (RCIC) Systems are not adversely affected by the proposed increase in the S/RV l

setpoints and operation with one inoperable S/RV.

Containment Performance - Section 7.0 providesjustification that the proposed increase in S/RV setpoints does not adversely affect containment pressure / temperature response or containment dynamic loads. Specifically discussed is the impact of the increased setpoint on S/RV dynamic loads. Increasing the setpoint has an insignificant impact on the suppression pool volume / level requirements. Operation with one S/RV inoperable has an insignificant affect on containment performance.

HL-5230 El-3

l l

0 1

Edwin I. Hatch Nuclear Plant 4

Request to Revise Technical Specifications:

4 4

_ Safety / Relief Valve Setpoint Change 10 CFR 50.92 Evaluation i

~

The proposed changes revise the nominal trip setpoints of the safety / relief valves (S/RVs) to 1150 psig and allow for continuous operation with one S/RV and its associated functions inoperable.

10 CFR 50.92 Evaluation l

Georgia Power Company (GPC) has reviewed the proposed Technical Specifications changes described above and determined they do not involve a significant hazards j

consideration based on the following:

)

1. The changes do not involve a significant increase in the probability or consequences of an accident previously evaluated. The S/RVs serve to mitigate postulated transients and accidents; the proposed changes do not alter the function or mode of operation of the S/RVs. The probability of an OPERABLE or an INOPERABLE S/RV.

I inadvertently opening or failing to open or close is not affected by these changes.

2 Therefore, the probability of an accident is not increased. Analysis (*)has been performed which considers the consequences of the various transients and accidents with the increased setpoints and with one S/RV inoperable. The analysis also considers the impact on ECCS performance, including HPCI and RCIC. The analysis has shown that the consequences of an accident with the increased S/RV setpoints and with one S/RV inoperable are not increased.

1 j

2. The proposed changes do not create the possibility of a new or different kind of accident from any accident previously analyzed. Revising the nominal S/RV setpoint only changes when the S/RV opens in its mechanical relief mode; the operation of the S/RV and any other existing equipment is not altered. Operation with one S/RV inoperable was evaluated (')and does not introduce any new failure modes. The impact on the operation and design of other systems and components has been evaluated,(*)

including ECCS and SLC. No new operating modes or failure modes are introduced.

Thus, these changes do not contribute to a new or different type of accident.

4 a

a. GE Report NEDC-32041P, " Safety Review for Edwin I. Hatch Nuclear Power Plant Units I and 2 Updated Safety / Relief Valve Performance Requirements," Revision 2 (Proprietary), April 1996. Included as Enclosure 5.

i HL-5230 E2-1

10 CFR 50.92 Evaluation

3. The proposed changes do not involve a significant reduction in the margin of safety.

The change in S/RV setpoint and operation with one S/RV inoperable was evaluated relative to the applicable safety system settings and found to remain acceptable. For example, the proposed changes were evaluated against peak clad temperature limits, ECCS operation, ASME Code overpressurization limits, the MINIMUM CRITICAL POWER RATIO Safety Limit, and containment design limits; no significant reduction N

in the margin of safety was identified a.

GE Report NEDC-32041P, " Safety Review for Edwin I. Hatch Nuclear Power Plant Units 1 and 2 Updated Safety / Relief Valve Performance Requirements," Revision 2 (Proprietary), April 1996. Included as Enclosure 5.

HL-5230 E2-2

i Edwin I. Hatch Nuclear Plant Request to Revise Technical Specifications:

Safety Relief Valve Setpoint Change s

Page Change Instructions Unit 1 Eagg Instruction 3.1-23 Replace 3.4-7 Replace 3.4-8 Replace 3.5-1 Replace 3.5-2 Replace 3.5-3 Replace 3.5-4 Replace 3.5-5 Replace 3.5-6 Replace 3.6-18 Replace Unit 2 Eagg Instruction 3.1-23 Replace 3.4-7 Replace 3.4-8 Replace 3.5-1 Replace 3.5-2 Replace 3.5-3 Replace 3.5-4 Replace 3.5-5 Replace 3.5-6 Replace 3.5-6a/6b Remove 3.6-18 Replace HL-5230 E3-1