ML20128M659
| ML20128M659 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/09/1996 |
| From: | Miraglia F NRC (Affiliation Not Assigned) |
| To: | Feigenbaum T, Harpster T NORTHEAST UTILITIES SERVICE CO. |
| References | |
| NUDOCS 9610160144 | |
| Download: ML20128M659 (3) | |
Text
_ _.
.. ~ _ _ - _ _ - _.
SD-28 Anh g
4 UNITED STATES g
g j
NUCLEAR REGULATORY COMMISSION o
e WASHINGTON, D.C. 20666 4 001 October 9, 1996 i
4
.Mr.:Ted C. Feigenbaum Executive Vice President and a
Chief Nuclear Officer
~
Northeast Utilities Service Company c/o Mr. Terry L. Harpster Director -. Nuclear Licensing Services P.O. Box 128 j-Waterford, CT 06385
SUBJECT:
. ACKNOWLEDGEMENT 0F SEPTEMBER 13, 1996, LETTER, REQUEST FOR ADDITIONAL INFORMATION - HADDAM NECK PLANT
Dear Mr. Feigenbaum:
The Nr'; staff has received your September 13, 1996, response to our August 9, 1996 20 CFR 50.54(f) request for additional information. This letter req.. red you to (1) update and resubmit your basis for continued operation of Haddam Neck, and (2) address the implications of NRC-and Northeast Utilities-
. identified degraded and non-conforming conditions requiring corrective action to meet the Haddam Neck Plant's-design basis.
In your response, you addressed the second item and stated that the first item could not be addressed until " additional reviews and corrective actions" have
-l been completed.
You committed to not restart Haddam Neck until the actions discussed in your letter were completed.
You also committed to coordinate with the NRC staff to develop an inspection and submittal schedule for these activities. Corrective actions requiring licensing actions should be submitted with sufficient time to support staff review.
Your commitment to not restart the plant until the corrective actions have been completed is an acceptable interim response to the August 9,1996, letter.
The corrective actions you have outlined are extensive.
I am also aware that you are in the process of updating the Haddam Neck economic analysis.
It is our understanding that you intend to use this updated analysis to aid in making decisions about whether to operate Haddam Neck in the future.
While this reanalysis is being performed, certain tasks have been postponed (including putting new fuel in the spent fuel pool) until completion of the reanalysis.
Two more issues regarding recent plant performance should also be included and A>
addressed as corrective actions prior to plant restart. These issues were
\\
identified during the augmented inspection team (AIT) review of events occurring between August 22 and September 4,1996, related to reactor coolant system-(RCS) inventory and cooling capacity (Inspection 50-213/96-80) and D
during the August 14, 1996, emergency preparedness (EP) exercise (Inspection
\\
50-213/96-07).
Your performance revealed some fundamental weaknesses in plant operations and in emergency response activities. While some corrective
~
9610160144 961009 PDR ADOCK 05000213 P
PDR 150076
T. Feigenbaum Haddam Neck Plant Northeast Utilities Service Company cc:
Lillian M. Cuoco, Esq.
Mr. S. E. Scace, Vice President Senior Nuclear Counsel Nuclear Reengineering Implementation Northeast Utilities Service Company Northeast Utilities Service Company P.O. Box 270 P.O. Box 128 Hartford, CT 06141-0270 Waterford, CT 06385 Mr. Kevin T. A. McCarthy, Director Regional Administrator Monitoring and 3adiation Division Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 79 Elm Street 475 Allendale Road Hartford, CT 06106-5127 King of Prussia, PA 19406 Mr. Allan Johanson, Assistant Director Board of Selectmen Office of Policy and Management Town Office Building Policy Development and Planning Division Haddam, CT 06438 80 Washington Street Hartford, CT 06106 Resident Inspector Haddam Neck Plant Mr. J. J. LaPlatney c/o U.S. Nuclear Regulatory Commission Haddam Neck Unit Director 361 Injun Hollow Road Connecticut Yankee Atomic Power Company East Hampton, CT 06424-3099 362 Injun Hollow Road East Hampton, CT 06424-3099 Mr. A. M. Callendrello Licensing Manager - Haddam Neck Mr. D. B. Miller, Jr.
North Atlantic Energy Service Corp.
Senior Vice President P.O. Box 300 Nuclear Safety and Oversight Seabrook, NH 03874 Northeast Utilities Service Company P.O. Box 270 Mr. James S. Robinson Hartford, CT 06141-0270 Manager, Nuclear Investments and Administration Mr. E. A. DeBarba New England Power Company Vice President - Nuclear Technical Services 25 Research Drive Northeast Utilities Service Company Westborough, MA 01582 P.O. Box 128 Waterford, CT 06385 Mr. B. D. Kenyon President - Nuclear Group Mr. F. C. Rothen Northeast Utilities Service Company Vice President - Nuclear Work Services P. O. Box 128 Northeast Utilities Service Company Waterford, CT 06385 P.O. Box 128 Waterford, CT 06385
j b
i I*
Mr. Ted C. Feigenbau: October 9, 1996 j
actions have already been taken or are planned in response to the recent RCS events and the EP exercise, it is important that you determine the root causes of these weaknesses and take broad corrective actions.
Attachment I to your letter describes Haddam Neck Plant Configuration Management Plan (CMP) restart related activities that provide reasonable assurance that the future operation of Haddam Neck will be conducted in j
conformance with the Commission's regulations. Since you have concluded there are some similarities in weaknesses between Millstone and Haddam Neck, information on your assessment and views on the need for an independent corrective action verification program (ICAVP) at Haddam Neck should be provided as soon as possible after your decision regarding future operation of d
the facility.
i Sincerely, 1
Original signed by:
4 Frank J. Miraglia, Acting Director Office of Nuclear Reactor Regulation i
i Docket No. 50-213 i
j cc: See next page i
Distribution j
Docket File JZwolinski RCooper, RI PUBLIC-ACRS WRaymond, RI j
PDI-3 Plant JRogge, RI i
DOCUMENT NAME: G:\\DEMBEK\\5054F.ACK
- See previous concurrence Ta vecelwe a espy of thle document,lasBosto in the box: "C" = Copy without ettechment/ enclosure "E' = Copy with attachment / enclosure "N* = No copy y
i 0FFICE PM:NU 4n l
LA:NUPD l
OGC l
D:NUPD l
OE l C 4
NAME SDe eW LBerry*
JGoldberg*
PMcKee*
JLieberman*
!.E-XE
-2226
-H.E?.6
' l' 6-2.EP.!
0FFICE Region I D:DRPE ADPR:NRR NAME WKane SVarga*
RZimmerman*
FMRf$1a 10/CD/96 10/ /96 DATE 10/04/96 10/04/96 10/09/96 i
0FFICIAL RECORD COPY
'