ML20128M240
| ML20128M240 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/10/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9302220116 | |
| Download: ML20128M240 (7) | |
Text
. _ - _ _ _ _ _ _ _ _. _ - _
. fe
'.g NUCLEAR REGULATORY COMMISSIOiB j i 21 j
REoioN iv 8
611 RYAN PLAZA oRIVE. SulTE 400 C
[
AR LINoTON, TEXAS 760118064 FEB I O 1993 Docket 50-382 License NPF-38 Entergy Operations, Inc.
ATTN:
Ross P. Barkhurst, Vice President Operations, Waterford P.O. Box B Killona, Louisiana 70066 This refers to the meeting conducted at Mr. Dan Packer's request in the Region IV office on February 9, 1993. This meeting related to your recently completed refueling outage, shutdown risk considerations, communications with the NRC, milestones for 1993, and the new corrective action program. The
/
meeting was open to public observation and was attended by those on the attached Attendance List.
The subjects discussed at this meeting are described in the enclosed Meeting Summary.
It is our opinion that this meeting was beneficial and has provided d better understanding of your performance and plans in the areas discussed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely,
/
f
( A. Bill Beach Direct'op Division of R cforpojects
Enclosure:
Meeting-Suumary w/ attachment cc w/ enclosure:
Entergy Operations, Inc.
ATTN: Donald C. Hintz, President
& Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 3??86 9302220116 930210 f
PDR ADOCK 05000382 j
/yb, P
PDR jV
\\
U
r tergy Operations, Inc. n Entergy Operations, Inc.
AT1ft: John R. M Gaha, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286 Wise, Carter, Child & Caraway ATTN: Rc'
.t 8. McGehee. Esq.
P.O. Box 651 Jackson, Mississippi 39205 Entergy Operations, Inc.
ATTil:
D. F. Packer, General Manager Plant Operations P.O. Box B Xillona, Louisiana 70066 Entergy Operations, Inc.
ATTH:
L. W. Laughlin Licensing Manager P.O. Box B Killona, Louisiana /0066 Chairman Louisiana Public Service Commission One American Place. Suite 1630 Baton Rouge, Louiriana 70825-1697 Entergy Operations, Inc.
ATTN:
R. f. Burski, Director Nuclear Safety P.O. Box B Killona, Louisiana 70066 Hall Bohlinger, Administrator Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 a
~.
t i
Entergy Operations,'Inc.
3-Winston & Strawn ATTN:' Nicholas S. Reynolds. Esq.
i 1400 L Street, N.W.
f
. Washington, D.C.
20005-3502 l
t' h
r
-4
~ !
i i
L I
i i
t e
?
- f 4-5 P
5 E
-i M
r' gr-"g w t',411.erraeg
?
wrw i,p a.ay ww'-
- g-yye,e-u' werTu9"*d4-
"7 9
- '4"ev'*
1-br*"b*-'
t'm*'*/>$
T
"#r'**T"TR
WN-T'4"TN8"4P rMut-
Entergy Operations, Inc. bcc to DMil (IE45) bec distrib. by RIV:
J. L. Milhoan Resident inspector DRP Section Chief (DRP/A)
Lisa Shea RM/Alf, MS: MilBB 4503 MIS System DRSS-flPS RIV file Project Engineer (DRP/A)
Section Chief (DRP/TSS)
DRS l,I RIV:h:DRP/A D
RP WDJohnsondf,
,ABBeach 2/10 /93
}2/lD/93
_x----as
i
)
FEB l 01993 Entergy Operations, Inc.
-4_
bec to DMB (IE45) bcc distrib by RIV:
J. L. Milhoan Resident inspector DRP Section Chief (DRP/A)
Lisa Shea, RM/ALF, MS: MNBB 4S03 MIS System DRSS-FIPS RIV File Project Engineer (DRP/A)
Section Chief (DRP/TSS)
DRS RIV:fsDRP/A'hDhRP
+e
MEETING
SUMMARY
Licensee:
Entergy Operations, Inc.
Facility:
Waterford 3 License No.: NPf-38 Docket No.:
50-382 Subjects:
Recent Refueling Outage Shutdown Risk Considerations Communications with the NRC New Corrective Action Program Milestones for 1993 The fif th refueling outage completed in November 1992 was discussed, including major work items, difficulties, and accomplishments.
Outage risk management during the refueling outage was discussed, including its benefits, lessons learned, and future planned improvements.
Discussions of communications between Entergy and the NRC included an assessment of working level communications with resident and regional inspectors, management interfaces, and plans to enhance communications.
Entergy representatives presented an overview of the revised corrective action program, which was implemented on February 1, 1993.
Under this program, most corrective action items are reported using one form, the Condition Report. This revised program was develop ] based on Quality Action Team recommendations.
Discussion of milestones for 1993 included completion of the generation support building, planned initiation of construction of a new maintenance support building, and plans for the sixth refueling outage scheduled for March 1994.
Attachment:
Attendance List
)
ATTEliDAtJCE LIST
-Attendance at the management meeting between Entergy Operations, Inc. and tJRC l
on February 9, 1993, in Arlington, Texas:
[nterqy Opgations. Inc.
R. f. Burski, Director, fluclear Safety D. F. Packer, General Manager, Plant Operations f)E J. M. Montgomery, Deputy Regional Administrator T. P. Gwynn Deputy Director, Division of Reactor Projects (DitP)
A. T. Howell, Deputy Director, Division of Reactor Safety W. D. Johnson, Chief, Project Section A, DRP
. - - _ _ _ _ _ - - _ - - _ _ - _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ - _ _ - _._-