Forwards Insp Rept 50-440/96-05 on 960608-0726 & Notice of Violation
ML20128M103
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/08/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20128M108 List:
References
NUDOCS 9610160004
Download: ML20128M103 (3)


See also: IR 05000440/1996005

Text

(~0l

4

October 8, 1996

Mr. Lew W. Myers

Vice President - Nuclear

Centerior Service Company

P. O. Box 97, A200

Perry, OH 4408.1

SUBJECT: NRC INTEGRATED INSPECTION REPORT N0. 50-440/96-05 AND

NOTICE OF VIOLATION

Dear Mr. Myers:

On July 26, 1996, the NRC completed a routine safety inspection at your Perry

Unit I reactor facility. The enclosed report presents the results of that

inspection.

During the 7-week inspection period, one plant transient, involving the trip

of a reactor feedwater pump, occurred that impacted on the plant's operation.

The operations staff responded well to this event. However, we observed that

there is a need to address improvement opportunities with the radioactive

material control program, particularly with respect to ensuring that the

general workforce has a clear understanding of the program's requirements.

We are also concerned about a violation of NRC requirements that was

identified.

In this case, the inspectors identified that maintenance workers

and supervisors failed to promptly and formally report a deficiency in a

safety-related valve resulting in a delay in the corrective action process.

This violation is cited in the enclosed Notice of Violation, and the

circumstances surrounding the violation are described in detail in the

enclosed report. Please note that you are required to respond to this le'1. -

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

Based on the results of the close-out inspection of Generic Letter (GL) 89-10,

we have determined that your motor-operated valve (MOV) program and

implementation at Perry are acceptable, and meet the inter,t of Generic Letter 89-10.

Program documentation, test data, and margin improvement plans

provided an adequate basis to conclude that all GL 89-10 program MOVs would

perform their intended safety functions under design-basis conditions.

Accordingly, we are closing the NRC review of your program.

.150089

\\

l

9610160004 961008

1

1

PDR

ADOCK 05000440

O

PDR

I

L. Myers

-2-

,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and the enclosures will be placed in the NRC Public Document Room

(PDR).

Sincerely,

Original signed by John A. Grobe

James L. Caldwell, Acting Director

Division of Reactor Projects

Docket No. 50-440

.

Enclosures: Notice of Violation

Inspection Report 50-440/96-05

cc w/ enc 1:

P. Stetz, Senior Vice

President - Nuclear

L. W. Worley, Director, Nuclear

Services Department

J. D. Kloosterman, Manager,

Regulatory Affairs

W. R. Kanda, Director, Perry Nuclear

Assurance Department

N. L. Bonner, Director, Perry

Nuclear Engineering Dept.

H. Ray Caldwell, General

Superintendent Nuclear Operations

R. D. Brandt, General Manager Operations

Terry J. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio

Department of Health

C. A. Glazer, State of Ohio,

Public Utilities Commission

See attached for distribution

Document name R:\\INSP9 PTS \\ POWER \\PERR\\PER96005.DRP

To receive a copy of this document, indicate in the box "C" = copy without

.

attach / encl

"E" = Copy with, attach / encl

s"N" = No copy

l0

e

IW

I

10

.nu

o..

o.s

o.s

g 4.f.j', ,,

$.dsD

gg;;,,g,

-

x. m n. ,..i.

lo/t/H

ib-1-9 4

io11i %

io laus.

'

mn

oA%K

N

a

A&

-na

v..

o..

4. m !. W 11

t.... # t

e. &M

-

\\

A

hoDM

o\\$it,

vM\\%

wn

~

'~

V

Of fICI AL Rf LORD COPV

n

I

.

.

.

.

_

_ - - .-__.-_

-.-.--

- - .

..._ -

.

- . -

- . -

.

_

-3-

Distribution:

Docket File w/ encl

SRI Perry w/ encl

PUBLIC IE-01 w/ encl

DRP w/ encl

OC/LFDCS w/ encl

RIII PRR w/enci

Project Manager, NRR w/ encl

RMB/ FEES w/o enc 1

IPAS (E-Mail) w/ encl

A. B. Beach, w/ encl

B. L. Burgess, w/ encl

W. L. Axelson, w/enci

P. Fredrickson, RII w/enci

T. Scarbrough, NRR w/ encl

C. Vandenburgh, RIV w/ encl

E. Kelly, RI w/ encl

<