ML20128L893
| ML20128L893 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 02/12/1993 |
| From: | Jackiw I NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20128L897 | List: |
| References | |
| NUDOCS 9302220039 | |
| Download: ML20128L893 (2) | |
See also: IR 05000483/1992022
Text
.
_
. _ _
__
__. _
.
)Ch/h(b
g "Gog
UNITED STA1 ES
3
3,
NUCLEAR REGULATORY COMMISSION
t
o
REGION Hi
f
n$
799 ROOSEVELT ROAD
- I
G.f N ELLYN, ILUNOIS 60137-5727
4
o,s,*****/
FEB 12 7393
Docket No. 50-483
Union Electric Company
ATIN: Mr. Donald F. Schnell
Senior Vice President - Nuclear
Post Office Box 149 - Hail Code 400
$t. Louis, MO 63166
Dear Mr. Scnnell:
This refers to the routine safety inspection conducted by Mr. B. L. Bartlett
and Ms. D. R. Calhoun of this office from December 1,1992 through January 31,
1993, of activities at Callaway Plant, Unit 1, authorized by NRC Operating
License NPF-30, and to the discussion of our findings with Mr. W. R. Campbell
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection certain of your activities appeared to be in violation
L
of NRC requirements.
However,-as described in the enclosed inspection report
you identified this violation. Therefore, the violation will not be subject
to enforcement action because your efforts in identifying and correcting the
violations meet the criterie specified in Section VII.B. of the " General
Statement of Policy and Procedures for NRC Enforcement Actions," (Enforcement
Policy, 10 CFR Part 2, Appendix C).
-
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will. be placed in;the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection. -
Sincerely,
,
f
26
w
1, N. Jacki
Chief,
Reactor Projects, Section 3A
p
Enclosure:
Inspection-Report
No. 50-483/92022(DRP)
hep Attached Distribution 190040
I
I
-
9302220039 930212
'
,
--
_
1
-PDR
ADOCK 05000483
i(!
'
G
PDR '
h
j
..
.
.
Union Electric Company
2
Q1siributioni
cc w/ enclosure:
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
5. E. Sampson, Supervising
Engineer, Site Licensing-
D00/006 (RIDS)l
OC/LfDCD
Resident-Inspector, Rill
Region IV
Resident inspector, Wolf Creek
K. Drey
C. John Renken, Engineer
~
Policy & federal Dept.
Gerald Charnoff, Esq.
'
R. A. Kucera, Deputy Director,
Department of Natural Resources
1
-
p
p
o
..
y
d)
1
m-
er
4-
re-
rrr*+rw-P*
-m-m
-,y-t'_