ML20128L782

From kanterella
Jump to navigation Jump to search
Summary of CRGR Meeting 77 on 850603 Re Proposed Rev to 10CFR50 App J & Reg Guide,Task Ms 021-5, Containment Sys Leakage Testing. Attendance List Encl
ML20128L782
Person / Time
Issue date: 07/08/1985
From: Stello V
Committee To Review Generic Requirements
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
TASK-MS-021-5, TASK-MS-21-5, TASK-RE NUDOCS 8507250112
Download: ML20128L782 (3)


Text

.

JUL 8 1985

/j MEMORANDUM FOR:

William J. Dircks Executive Director for Operations FROM:

Victor Stello, Jr., Chairman Comittee to Review Generic Requirements

SUBJECT:

MINUTES OF CRGR MEETING NUMBER 77 The Comittee to Review Generic Requirements (CRGR) met on Monday, June 3, 1985 from 1-5 p.m.

A list of attendees for this meeting is enclosed (Enclosure 1).

J. Richardson, and G. Arndt (RES) presented for CRGR review the proposed Revision of Appendix J (Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors) of 10 CFR Part 50 and the related Regulatory Guide (Task No. MS 021-5) entitled " Containment System Leakage Testing" which would provide a qualified endorsement of an industry standard on this matter (ANSI /ANS 56.8-1981). (Category 2 item.) The CRGR also had benefit of dis-cussions with Regional personnel relative to their direct experience with licensee containment leak rate surveillance testing and Technical Specifi-cations. CRGR reviewed the proposed Appendix J revisions and sampled a number of the 21 regulatory positions ceing proposed in the Regulatory Guide endorse-ment of ANSI /ANS 56.8 1981. CRGR was, however, unable to conclude its review and recommendations on this matter and decided an additional CRGR meeting would be required. A more complete set of minutes on this matter will follow this concluding CRGR meeting.

This document contains no predecisional information and therefore will be released to the Public Document Room.

Questions concerning these meeting minutes should be referred to Walt Schwink (492-8639).

Odt; cal Signed by q, stauo Victor Stello, Jr., Chairman Committee to Review Generic Requirements

Enclosure:

As Stated cc:

See next page 8507250112 850708 PDR REVGP NRCCRGR MEETINGO77 PDR

'06 /

't I

ROG)/D
DEDROGR 0FC :ROGR/;Sf, NAME :M,%.1h.r.J i

ezek

VStello

--___:__4

...___.:.a...__..___..___________.__________,..._________,,,,.,___,,,,,,,,

DATE :7/2/85

7/4/85
7/ /85

A cc: Comission (5)

SECY Office Directors Regional Administrators CRGR Members G. Cunningham J. Richardson G.-Arndt J. Glynn Distribution:

VStello JRoe R0GR Staff JHSniezek WLittle Central File RHernon EFox JFhilips JHenry RErickson ETriner JZwetzig FHebdon PDR(NRG/CRGR) e

. m.

. m.

LIST OF ATTENDEES CRGR MEETING N0. 77 June 3, 1985 CRGR MEMBERS V. Stello R. Bernero E. Jordan J. Scinto T. Ippolito (for J. Heltemes)

R. Cunningham OTHERS J. Richardson G. Arndt J. Burns J. Shapaker J. Huang M. Taylor R. Hernan G. Arlotto A. Tse S. Feld B. Richter C. A. Petraute J. Pulsipher-M. Federline D. Kirkpatrick F. Jape F. Maura S. Rozak S. Hare D. Lurie

,