June 28, 1985 Docket No. 50-267 MEMORANDUM FOR:
Richard P. Denise, Director Division of Reactor Safety and Projects, Region IV FROM:
Hugh L. Thompson, Jr., Director Division of Licensing, NRR
SUBJECT:
REVIEW OF FORT ST. VRAIN DRAFT TECHNICAL SPECIFICATIONS FOR CONTROL RODS
References:
1.
TIA 85-01 dated January 2, 1985 (Task 3) 2.
Preliminary Report Related to the Restart and Continued Operation of Fort St. Vrain Nuclear Generating Station October 16, 1984 3.
Memo from H. L. Thompson to R. P. Denise dated May 21, 1985 on Fort St. Vrain Evaluation for Control Rod Drive Mechanisms and Reserve Shutdown Systems 4.
Memo from H. L. Thompson from to R. P. Denise dated May 17, 1985 on Fort St. Vrain - Control Rod Position Instrumentation Enclosed is a June 21, 1985 memorandum from the Division of Safety Technology providing an evaluation of the draft Fort St. Vrain Technical Specifications for Control Rods. This evaluation is being provided under Task 3 of TIA 85-01 (Reference 1). Specifically, these draft Technical Specifications will be usad by the licensee as the basis for developing the procedures required by the Assessment Report (Reference 2) for plant restart. These procedures will govern the operation of the control rods until a formal change to the Technical Specifications can be implemented.
Additionally, the draft Technical Specifications incorporate temperature limits for the Control Rod Drive Mechanisms that are acceptable to the NRC. This is in response to one of the requirenents of our SE on this topic (Reference 3).
The draft Technical Specifications also include responses to the requirements of our SE on Control Rod Instrumentation (Reference 4).
We consider that this completes our obligatior under Task 3 of TIA 85-01 to support your review of draft Technical Specifications related to plant restart.
8507110416 850628ADOCK 05000267 PDR PDR P
l
f We will continue to support your office in the review of thc general upgrade of the Fort St. Vrain Technical Specifications.
TUrfgtnal Signed by Hugh L Thompton, Jr.
Hugh L. Thompson, Jr., Director Division of Licensing, NRR
Enclosure:
As stated Distribution:
.uus,un Fue ;
GClainas NRC~PDR ~ ~
HThompson Local PDR ORB #3 Rdg KHeitner PMKreutzer EJButcher CONTACT:
K. Heftner X27364 oyN
,y 088 A
R D DIRm ORB #3;DL ORB #3:DLI\\
PJ f&er KHeitner:dd E!TBu her e'inas HThom f ff85 6/1L/85 6/z 85 6/fy85 6/g/85 CONTACT:
K. Heitner X27364 l