ML20128L681

From kanterella
Jump to navigation Jump to search
Forwards Tl King 850621 Memo Re Evaluation of Draft Tech Specs for Control Rods.Task 3 of Task Initiation Action 85-01 Complete
ML20128L681
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/28/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20127P112 List:
References
NUDOCS 8507110416
Download: ML20128L681 (2)


Text

1 O

June 28, 1985 Docket No. 50-267 MEMORANDUM FOR:

Richard P. Denise, Director Division of Reactor Safety and Projects, Region IV FROM:

Hugh L. Thompson, Jr., Director Division of Licensing, NRR

SUBJECT:

REVIEW OF FORT ST. VRAIN DRAFT TECHNICAL SPECIFICATIONS FOR CONTROL RODS

References:

1.

TIA 85-01 dated January 2, 1985 (Task 3) 2.

Preliminary Report Related to the Restart and Continued Operation of Fort St. Vrain Nuclear Generating Station October 16, 1984 3.

Memo from H. L. Thompson to R. P. Denise dated May 21, 1985 on Fort St. Vrain Evaluation for Control Rod Drive Mechanisms and Reserve Shutdown Systems 4.

Memo from H. L. Thompson from to R. P. Denise dated May 17, 1985 on Fort St. Vrain - Control Rod Position Instrumentation Enclosed is a June 21, 1985 memorandum from the Division of Safety Technology providing an evaluation of the draft Fort St. Vrain Technical Specifications for Control Rods. This evaluation is being provided under Task 3 of TIA 85-01 (Reference 1). Specifically, these draft Technical Specifications will be usad by the licensee as the basis for developing the procedures required by the Assessment Report (Reference 2) for plant restart. These procedures will govern the operation of the control rods until a formal change to the Technical Specifications can be implemented.

Additionally, the draft Technical Specifications incorporate temperature limits for the Control Rod Drive Mechanisms that are acceptable to the NRC. This is in response to one of the requirenents of our SE on this topic (Reference 3).

The draft Technical Specifications also include responses to the requirements of our SE on Control Rod Instrumentation (Reference 4).

We consider that this completes our obligatior under Task 3 of TIA 85-01 to support your review of draft Technical Specifications related to plant restart.

8507110416 850628ADOCK 05000267 PDR PDR P

l

f We will continue to support your office in the review of thc general upgrade of the Fort St. Vrain Technical Specifications.

TUrfgtnal Signed by Hugh L Thompton, Jr.

Hugh L. Thompson, Jr., Director Division of Licensing, NRR

Enclosure:

As stated Distribution:

.uus,un Fue ;

GClainas NRC~PDR ~ ~

HThompson Local PDR ORB #3 Rdg KHeitner PMKreutzer EJButcher CONTACT:

K. Heftner X27364 oyN

,y 088 A

R D DIRm ORB #3;DL ORB #3:DLI\\

PJ f&er KHeitner:dd E!TBu her e'inas HThom f ff85 6/1L/85 6/z 85 6/fy85 6/g/85 CONTACT:

K. Heitner X27364 l