PY-CEI-NRR-2099, Forwards Per 10CFR50.59(b)(2),annual Rept of Facility Changes,Tests & Experiments for Period Covering 960919 to 960410
| ML20128L537 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/08/1996 |
| From: | Myers L CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20128L541 | List: |
| References | |
| PY-CEI-NRR-2099, NUDOCS 9610150114 | |
| Download: ML20128L537 (2) | |
Text
GNTERKNt ENERGY PERRY NUCLEAR POWER PLANT Mail Address:
O. BM W 10 CENTER ROAD EW. OHIO 4 081 PERRY, OHIO 44081 (216) 259 3751 October 8, 1996 PY-CEI/NRR-2099L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Planc Docket No. 50-440 Annual Report of 10 CFR 50.59 Safety Evaluations for 1994 - 1996 Gentlemen:
Pursuant to 10 CFR 50.59 (b) (2), enclosed is the report of facility changes, tests, and experiments for the Perry Nuclear Power Plant (PNPP).
Those changes, tests, and experiments reported are for the period September 19, 1994, through April 10, 1996 (the end of the PNPP fifth refueling outage), and in selected cases, more recent evaluations.
This report summarizes a total of 281 safety evaluations. Attachment I defines the acronyms and format description. Attachment 2 provides the summaries of the safety evaluations listed above.
If you have questions or require additional information, please contact Mr. James D.
Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.
Very truly yours, g m nip Lew W. Myers Vice President - Nuclear JEE:sc 150015 l
Attachments c,,[
h cc: Region III Administrator NRC Resident Inspector NRC Project Manager 9610150114 961008 PDR ADOCK 05000440 R
PDR Operating Componies Clevelona Electne morninating loledo Idison
PY-CEI/NRR-2099L l
l 1
l FORMAT DESCRIPTION Each 50.59 Safety Evaluation summary is presented in the following format:
SE No.?
A sequentially assigned number from one (0001) to end of the period, preceded by the year; e.g. 86-0025.
l Source Documente There are several sources of evaluations.
The most frequent are abbreviated as shown.
DCN - Drawing Change Notice DCP - Design Change Package FCR - Field Clarification Request LL&JED - Lifted Lead and Jumper and Electrical Device MFI - Mechanical Foreign Item NR - Nonconformance Report where S or N in the serial number indicates safety or nonsafety ONI - Off-Normal Instruction PAP - Plant Administrative Procedure PEI - Plant Emergency Instruction PIF - Potential Issue Form PSTG - Perry Specific Technical Guidelines PTI - Periodic Test Instruction SCR - Setpoint Change Request SMRF - Simple Modification Request Form SOI - System Operating Instruction SVI - Surveillance Test Instruction TM - Temporary Modification TXI - Temporary Test Instruction Descriotion of Chance:
A short narrative describing the type of plant change.
Summary 2.
Response to 10 CFR 50.59 (a) (2) (i) - is the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety previously evaluated in the safety analysis report increased?
II.
Response to 10 CFR 50.59 (a) (2) (ii) - is the possibility for an accident or malfunction of a different type than any evaluated previously in the safety analysis report created?
l i
III.
Response to 10 CFR 50.59 (a) (2) (iii) - is the margin of safety as defined I
in the basis for any Technical Specification reduced?
1