htnom thow oreanna Canna"v Post OM.ce Don 1295 Barnuteham Alabama 35?O1 Tek%>)e F05 068 505G L
Southem Nudeal Operating Company
- o. wooe,,a j'fe Fy tre sou: tern croctoc svavm Februar,/ 12, 1993 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555 Centlemen:
Joseph M. farley Nuclear Plant Monthly Doeratina Data Report Attached are the January 1993 Monthly Operating Reports for Joseph M.
Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, kL nd,~4 J. D. Woodard JAR:scj(mor.let)
Attachments cc:
Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 18:116 l
l l
9302190279 930131 N
l
[i ?'
l PDR ADOCK 05000340 R
PDR l
V
{I
i j
JOSEPH M. TARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS January 1993 At 1820 on 1-8-93, the unit was ramped down to 60 percent reactor power to perform maintenance on the high pressure stop valve on the lA steam generator i
feed pump.
The unit returned to 100 percent power at 0416 on 1-10-93.
The following major safety related maintenance was performed during the month of January:
1.
Performed miscellaneous corrective and preventive maintenance on the diesel generators.
OPERATING DATA REPORT DOCKET No. _
59-348 DATE J1bruary 5.1993_
COMPLETED BY.__LJLJ111]
r TELEPHONE 12951039-3116 DRMIINUJAIDS
- 1. Unit Name:
Jq1coh M. Faticy - Unit 1 Notes
- 2. Reporting Period:
JinMary.._1993
- 1) Cumulative data since
- 3. Licensed Thermal Power (HWt):
2,652 12-1-77, date of
- 4. Nameplate Rating (Gross MWe):-
860 commercial operation.
- 5. Design Electrical Rating (Net MWe):- 829
- 6. Maximum Dependable Capacity (Gross MWe):
835.7 7 Maximum Dependable Capacity (Net MWe):
8J2 0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons: N/A
~~
- 9. Power Level To Which Restricted, If Any (Net MWe):
M/A
- 10. Reasons for Restrictions, if Any:
N/A This Month Yr-to-Dato Cumulative
- 11. Hours In Reporting Period 744.Q 744.0 112,2SitQ t
- 12. Number Of Hours Reactor Was Critical 744.0 744.0-1Q1.11121
- 13. Reactor Reserve Shutdown Hours 09 0.0 3 51929 1
2
- 14. Hours Generator On-Line 744.0 744.Q 102.127.7
- 15. Unit Reserve Shutdown Hours QiQ 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)-
1.928.567,3 1.92&,15223 ZE1.929.643.6
- 17. Gross Electrical Energy Generated (MWH) 625 348.0 626.348.0 _&i.393.150.0
- 18. Net Electrical Energy Generated (MWH) 594dhhiQ 594.1511Q _122fl2.dD5J
- 19. Unit Service factor 100 Q 100.0 76.8
- 20. Unit Availability Factor 100.0 100.0 76.8
- 21. Unit Capacity Factor (Using MDC Net) 98.3 98 1 74 9 2
22.UnitCapacityfactor(UsingDERNet) 96.3 96.3 72.21
- 23. Unit forced Outage Rate 09 0.0 6.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 Q.8/09/77 INITIAL ELECTRICITY 98/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 DATARPT.UI
v-c DOCKET NO.-
50-348 l
UNIT _,
I j
DATE Februarv 5. 1993-COMPLETED'BY R. D. Hill 1
TELEPHONE -(2051 899-5156 MONTH _ January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(HWe-Net) 1 818 17 821 2
818 18 820 3
817 19 813 4
Ql4.
20 816 5
812 21 750 6
815 22 817 7
815 23 818 8
764 24 817 9
472 25 822 10 812 26 824 11 819 27 822 12 819 28 823 13 811 29 8 11 14 730 30 813 15
.166 31 824 16 822 JMIR110110M On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole-megawatt.
AVGDLY.PWR
UNIT SHUTDOWNS AND POWER REDUCTIONS umm to sc-34e UNIT NAME J. M. Fafiev - Unit 1 DATE Februa v 5.1993 COMPLETED BY R D. Hill 4
REPORT MONTH: JANUARY TELEPHONE C051899-5156 METHOO OF UCENSEE CAUSE & CORRECTNE DURATION SHUTTING EVENT SYSTEM COMPONEN' ACTION TO NO.
DATE TYPE' (HOURS)
REASON' DOWN REACTOR' REPORTS CODE
- CODE' PREVENT RECURRENCE 001 930106 S
34.0 A~
N/A N/A SJ N/A At 1820 on 14-93, the urut was ramped down to 60 percent reactor power to worst on the high presauce stop valve on the 1A steam generator feed pump. The unit retumed to 100 percent power at 0416 on 1-10LG1
)
4 4
1:
2:-
3-4:
5:
- F: Forced.
- Bensort Metnod.
Exbent G-bstruenons for Exhibit 1-Same Source S: Scheduled '
A-Equipment Fa;iure (Explain) 1 - Manual
%.Ls for Data Entry.
B - Marntenance er Test 2 - Manual Scrar i.
Sheets for tscensee Event.
. C - Refueling 3-Automabc Scram.
Report (LDU File (NUREG4151) 0- Regulatory N h 4 - Other (Explain)
. E-Operator Traming & t.icensing Exammaton F-Admrrast strve
~ G - Operational Error (Exp'ain) '
H - Other rexplan)
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS January 1993 At 2315 on 1-30-93, the unit was taken off line for an eight day forced outage.
The primary focus of the outage was the replacement of the 'B' pressurizer safety value due to seat leakage.
The following major safety-related maintenance was performed during the month:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
2.
Installed a new diaphragm in the Reactor Makeup Water Storage Tank.
3.
Refurbished the 2D service water motor and pump.
~~
]
OPERATING DATA REPORT I
C DOCKET NO.-
50-364 DATE Februarv 5. 1993-COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 i
OPERATING STATUS l,
- 1. Unit Name:
Joseph M. Farley - Unit 2 Notes-
- 2. Reporting Period:
January 1993
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2.652 7-30-81, date of
- 4. Nameplate Rating (Gross MWe):__
860 commercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
863.6
-7 Maximum Dependable Capacity (Net MWe):
822.0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report ~,
Give Reasons: Item numbers 6 ant' 7 chanaed to reflect current output capacity.
,o
- 9. Power Level To Which Restricted, If Any (Net NWe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A
)
This Month-Yr-to-Date Cumulative
]
- 11. Hours in Reporting Period 744.0 744.0
-100.897d
- 12. Number Of Hours Reactor Was Critical 719J
' 719. 5 -'
86.741.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0-
- 14. Hours Generator On-line-719.3-719.3 85.636.0-
- 15. Unit Reserve Shutdown Hours-OJ -
0.0.
0.0
- 16. Gross Thermal Energy Generated (MWH).
1.879.525d
-1.879.525.4 _218.410.473.21
- 17. Gross Electrical Energy Generated (MWH) 619.425.0 619.425.0
_71. 631.603J
- 18. Net Electrical Energy Generated (MWH) 589.063.0-
-589.063.0 -_67.928.261.0
- 19. Unit Service Factor
-96.7-96.7-84.9
- 20. Unit Availability Factor 96.7 96.7 84.9
- 21. Unit Capacity factor (Using MDC Net)'
96.3 96.3-82.1
- 42. Unit Capacity Factor (Using DER Net) 9 5. 5 ~-
95.5-81.2-l
- 23. Unit Forced Outage Rate 3.3 31 4.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and-Duration of Each);
N/A
-25. If Shut Down At End Of Report Period.-Estimated Date of-Startup: N/A
-26. Units:In Test. Status _(Prior to-Commercial Operation):-
Forecast-Achieved-.
INITIAL CRITICALITY _
05/06/81__
95/08/81 INITIAL ELECTRICITY 95/24/81 05/25/81-COMMERCIAL OPERATION
.08/01/81 91/30/81
.DATARPT.U2
-.m.-...
.m
_ _ _. - - - ~,... _. _.
,/ - '
DOCKET NO.
50-364 UNIT 2
DATE february L _l911 COMPLETED BY _ R. D. Hill 1ELEPHONE,RQS) 899-5156 MONTH __
January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Not)
(MWe-Net)-
1 825 17 827 2
824 18 826 3
823 19 825 4
819 20 826 5
817 21 824 6
621,._
22 822 7
82?
23 825 8
820 24 825 9
824 25 8 10 10 826 26 829 11 (25 27 827 12 824 28 829 13 801 29 81 7 14 828 30 679 15 829 31 0
16 828 LUIEl10.lDJ15 On this format. list the average daily unit power leval in MWe-Net for each' day in =
the reporting month. Compute to the nearest whole megawatt.
AVGDLY.PWR.
s UNIT SHUTDOWNS AND POWER REDUCDONS
~
DOCKET RD.
50054 UMT NAME J, M. Farky - thM 2 DATE February 5.1993 COVPLETED BY R D HM REPORT MONTH: JANUAM TELEPHONE (2051 8 % 5156 METHOD OF UCENSEE CAUSE & CORRECirW DURATION SHUTTING EVENT SYSTEM COMPONENT ACmON TO NO.
DATE TYPE' (HOURS)
REASON' OOVM REACTOR' REPORT s CODE
- CODE
- PoEVENT RECURRENCE 001 930130 F
24J A
1 N/A N/A N/A At 2315 on 1M93, the unit was taken o'f hoe for an eW day Forced Outage The pnmary focus of the outage was the replacernent of the ~B-prossttizer safety valve due to seat leakage.
1:
2:
3-4:
5:
F: Forced Feason:
Method.
ExNtxt G+istnsencers for Exhitst 1-Same Source S: Scheduled '
A-Egipmerit Fanure (Empiam) 1 - Manual Prepar h ibt Data Entry.
B W.a we or Test 2 - Manual Scram.
Sheets for Laconsee Everft C - Refueling
' 3 - Automate Scram.
Report (LErg FDe (NVEGC161)
D - Regulatory Naa.
4 - Otner (Explasn)
E. Operator Tra:r#g & Ucermng E-TO.Jon F - Mmirittratrve G -Cr.eL : Error (Explain)
H - Other (Exotair)