Forwards Insp Repts 50-334/92-30 & 50-412/92-29 on 921222- 930125.Noncited Violations Noted
ML20128L180
Person / Time
Site: Beaver Valley
Issue date: 02/10/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20128L186 List:
References
NUDOCS 9302190108
Download: ML20128L180 (3)


See also: IR 05000334/1992030

Text

~.

,

,

-

- --

,

av

<

FEB .101993-

'

.

Docket No.

50-334

50-412

-

Mr. J. D. Sieber

Senior Vice President

Nuclear Power Division

Duquesne Light Company-

Post Office Box 4

~ Shippingport, Pennsylvania 15077

Dear Mr..Sieber:

H

SUBJECT:

NRC INSPECTION REPORT NOS. 50 334/92-30 AND 50-412/92-29

(12/22/92 - 01/25/93)

I

This letter transmits the report of the resident safety inspection by' MessrsiL. Rossbach and

P. Sena at the Beaver Valley Power Station in Shippingport, Pennsylvania. The reporting .

period covers from December 22,1992, to January 25,1993. The inspectio_n consisted of

document reviews, interviews, and observation of activities important to public health and

safety. The findings were summarized and discussed with you and other members of your=

staff at the conclusion of the inspection.

Overall, both units continued to be operated safely and conservatively. Your staff identified

an instance where proper senior reactor operator staffing was_'not maintained in' the Unit 1

. control room for a very brief period of time. This violation is not being cited because' of i.ts

minor safety significance and the isolated nature of the incident.

. No reply to this letter is necessary; -Your cooperation with us is appreciated.

Sincerely,

Griginal Signed gy

James C,kg '

1

James C.- Linvillel Chief-

Projects Branch No. 3;

Division of' Reactor Projects

'

Enclosure: - NRC Inspection Report Nos. 50-334/92-29 and 50-412/92-30

o

180058

.

9302190108 930210

-PDR

ADOCK 05000334.

9

PDR

q

.0FF4CIALRECORD COPY

'

t;

c

.

s

'

,

.

-

m

/

.

FEB 10 t393

Mr. J. D. Sieber

2

cc w/ encl:

G. S. Thomas, Vice President, Nuclear Services

D. E. Spoerry, Vice President, Nuclear Operations

L. R. Freeland, General Manager, Nuclear Operations Unit

K. D. Grada, Manager, Quality Services Unit

N. R. Tonet, Manager, Nuclear Safety Department

H. R. Caldwell, General Superintendent, Nuclear Operations

K. Abraham, PAO, (2 copies)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

Coramonwea!fh of Pennsylvania

State of Ohio

'

.

l

i

)

i

I

i

'

,

i

l

l

OFFICIAL RECORD COPY

a

_

Mr. J. D. Sieber

3

FEB 101993

bec w/cncl:

Region I Docket Room (with concurrences)

DRS/EB SALP Coordinator

J. Linville, DRP'

W. Lazarus, DRP

L. Rossbach, SRI - Beaver Valley

SR1, Perry, Region 111

W. Butler, NRR

G. Edison, NRR

V. McCree, OEDO

bec w/ Letter and Executive Summary Only:

T. Martin, R A

W. Kane, DRA

C. Hehl, DRP

J. Wiggins, DRP

R. Cooper, DRSS

W. Hodges, DRS

W. Lanning, DRS

W. Ruland, DRS

L. Bettenhausen, DRS

J. Joyner, DRSS

D. Holody, EO

RI:DRP

RI:DRP

RI:D

L. Rossbach

ry

J.

i v'lle

2/5/93

4/43

3. ;

}

OFFICIAL RECORD COPY

A:BV9230.MEO