Monthly Operating Rept for Jan 1993 for Waterford 3
ML20128K928
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1993
From: Alday C, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-93-0114, W3F1-93-114, NUDOCS 9302190041
Download: ML20128K928 (7)


Text

..

m..

M Entergy operations,Inc. =~ ENTERGY a A 7&fe I

"iM 7'/ f 'I d R. F. Durs ki I

i W3F1-93-Oll4 A4.05 QA i

February 15, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control-Desk Washington, D.C. 20555 I

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 l

Monthly Operating Report l

Gentlemen:

i Attached is the subject monthly report which covers the operating 2

statistics for the month of January,1993.

This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

i Very truly yours, adlA i

,/

G ur 1 I

/ ' rec %, Nuclear Safety

/

RFB/TSB/ssf Attachment cc:

J.L. Milhoan, NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INPO Records Center)

NRC Resident Inspectors Office f

9302170041 930131

/ 'h I PDR A00CK 05000382

/ ;

R

.i J,,,,

PDH p'

q

. ~.

4-s.

l.

l.

i NRC MONTHLY OPERATING REPORT I

SU! DIARY OF OPERATIONS WATERFORD 3 JANUARY 1993 i

The enit operat.ed at an average power of 99.7% and experienced no shutdowns or 4

significant-power reductions during the period.

i ii' i

i.

4 s

I L

4 e

i I

1 i

n

+

L L

,,..m,

e PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of January 1993, there were no pressurizer safety valve f ailures or challenges.

.m_._

OPERATING DATA REPORT i

DOCKET NAME: 50-382 UNIT 5'AME: WATERFORD 3 DATE OF RErJRT: FEBRUARY, 1993 COMPLETED BY C. L. ALDAY TELEPHONE: 504-739-6732 OPERATING STATUS 1.

Reporting Period: January, 1993 Gross Hours in Reporting Period 744 2.

Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104-3.

Power Level to which Restricted (if any) (Net MWe): N/A 4.

Reasons for Restriction (if any):

N/A THIS MONTH YR TO DATE CUMULATIVE-5.

Number of Hours Reactor was Critical 744,0 744.0 53,137.0 6.

Reactor Reserve Shutdown Hours d 7.

Uours Generator was On-line 744.0 744.04 52,340.2 8.

Unit Reservo Shutdown Hours 9.

Gross Thermal Energy Generated (MWH) 2,514,707 2,514,707 172,181,760 10.

Gross Electrical Energy Generated (MWH) 832,620 832,620 57,694,090 11.

Net Electrical Energy Generated (MWH) 797,871 797,871 54,969,488 12.

Reactor Service Factor 100.0 100.0 82.4 13.

Reactor Availability Factor 100.0 100.0 82.4 14.

Unit Service Factor 100.0 100.0 81.2 15.

Unit Availability Factor 100.0 100.0 81.2 16.

Unit Capacity Factor (using MDC) 99.8 99.8 79.3 l

l 17.

Unit.

scity Factor (Usi.., udR) 97.1 97.1 77.2 18.

Unit Forced Outage Rate 0.0 0.0 3.9 l

l l

l

_.m.

._.._m.

1 I

i $

t-l OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATERFORD 3 l

DATE OF REPORT: FEBRUARY, 1993 l

COMPLETED BY C.

L. ALDAY TELEPHONE: 504-739-6732 OPERATING DATA REPORT (Con't) 19.

Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A If Shutdown at end of report period, estimated date of startups N/A 20.

i 21.

Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE t

22.

Hours in Reporting Period 744.0 744.0 64,489.0 9

23.

Unit Forced Outage Hours 0.0 0.0 2,110.7 l

24.

Nameplate Rating (Gross MWe): 1200 1

25.

If Changes occur in capacity Ratings (Items Number 2.and 24) Since Last l

Report, Give Reasons: N/A l

b i

?

I I

i l

t i

i 4

=

I 1

1 F

i l

i l

4 3

..e..-

,,,,,,..,,,,,,,,_,..,.,,..w.,,.,a,,,,,,~.,.,,,.--m

. ~.. -. _.... _ -

i a.

i AVERAGE DAILY UNIT POWER LEVEL i

l DOCKET NAME: 50-382 l

UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY, 1993 COMPLETED BY C. L. ALDAY d

TELEPHONE: 504-739-6732 i

i MONTH JANUARY i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1078 17 1075 t

2 1079 18 1073 l

j 3

1078 19 1068 4

1079 20 1069

}

5 1076 21 1070 i

6 1077 22 1072 7

1077 23 1070 8

1077 24 1071 i

9 1077 25 1071 10 1079 26 1070 i

i 11 1076 27 1070 12 1080 28 1070 i

i 13 1077 29 1070 j

14 1076 30 1071

!i-15 1075 31 1070-16 1027 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day I

in the reporting month.. Compute to the nearest whole megawatt.

i 1.

I

?

}

l 4

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORD 3 DATE OF REPORT: FEBRUARY, 1993 COMPLETED BY:

C. L. ALDAY TELEPHONE: 504-739-6732 REPORT FOR JANUARY, 1993 Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Corvnents and Number Date S = Scheduled (Hours)

Reason (1)

Reducing Power (2)

Corrective Actions NONE.

(1) REASON (2) METHOD A = Equipment Failure (explain) 1 = Manual B = Maintenance or Test 2 = Manual Scram C = Refueling 3 = Automatic Scram D = Regulatory Restriction 4 = Continuation from Previous Period E = Operator Training and 5 = Power Reduction License Examination 6 = Other (explain)

F = Administrative G = Operational' Error (explain)

H = Other (explain) w