Press Release I-96-67, NRC to Discuss Apparent Violations at Haddam Neck Nuclear Plant
ML20128K478
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/08/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PR-I-96-067, PR-I-96-67, NUDOCS 9610110084
Download: ML20128K478 (1)


Text

_ _ . _ _._ _ ._- _._ _. _._ __ -

- . _ . . _ _ . _ - ~ _ _ _ _ ~ . _ _ _ . . _ _ . _ .

i ,

e~

e'

. 1

.. l United States Nuclear Regulatory Commission

~

Office of Public Affairs, Region I 1 475 Allendale Road King of Prussia, PA 19401  !

Phone: _610/337-5330 Fax: 610/337-5241 '

q Internet: dps@nrc. gov i

'I I-96-67 October 8, 1996

Contact:

Diane Screnci FOR IMMEDIATE RELEASE i

NRC TO DISCUSS APPARENT VIOLATIONS AT HADDAM NECK NUCLEAR PLANT i

The Nuclear Regulatory Commission staff will meet with

officials of Connecticut Yankee Atomic Power. Company on Friday, j October 18, to discuss apparent violations of NRC requirements at the Haddam Neck Nuclear Power Plant in Haddam, Connecticut. The predecisional enforcement conference, which is open to the public for observation only, will begin at 9 a.m. at the Hawthorne Inn, 4 2387 Berlin Turnpike in Berlin, Connecticut.

The apparent violations were identified daring several NRC regular and special-inspections, starting last November. The

. apparent violations include errors ~in design basis documents, ,

errors introduced by design changes, inadequate corrective i actions, errors in evaluations required by NRC regulations, failure to update the Final Safety Analysis Report, and violations having to do with the operability of equipment,

, including the containment air recirculation fans and the residual heat removal system.

I The decision to hold a pre-decisional enforcement conference does not mean that the NRC has determined that a violation has occurred or that enforcement action will be taken. Rather, the purpose is to discuss apparent violations, their causes.and safety significance; to provide the licensee an opportunity to point-out any errors that may have been made in the NRC inspection report; and to enable the licensee to outline its proposed corrective actions. No decision on the apparent violations will be made at this conference. Those decisions will be made by senior NRC officials at a later time.

1 i

9610110084 961008-PDR PRESS R RG-I-96-067 PDR; 110032 peuot oft