ML20128K175

From kanterella
Jump to navigation Jump to search
Informs of Shipment of Spent Fuel from Monticello Plant to Morris Operations in Morris,Il.Shipment Schedule Withheld (Ref 10CFR73.21)
ML20128K175
Person / Time
Site: 07000754
Issue date: 06/05/1985
From: Marlone Davis
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
25358, NUDOCS 8507100503
Download: ML20128K175 (1)


Text

-f Northem States Power Company 7, <,_

{M Monticello Nuclear Generating Plant P.O. Box 600 Monticello, Minnesota 55362 70-7[Y e-,

l\\

N,.

07000 2[Yo 30 Y

\\

'O J 2-YJ S~

June 5, 1985

/

p O

/

u z,.

g c-()"':M&

sn/

7,.g.r pi

& g-Director

\\,/ '~risd;

,y Nuclear Regulatory Commission 5

Region III Office N Il' V 'st?

799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Sirs:

This lette'r is to inform your office that Northern States Power Company plans to ship spent nuclear fuel from the Monticello Plant to Morris Operations in Morris, Illinois.

A description of the shipment, pursuant to 10CFR73.37, is provided as an attachment to this letter.

The shipment schedule is also provided within the enclosed envelope.

The schedule information is safeguards information and is required to be protected in accordance'with the provisions o,f 10CFR73.21.

W. A. Shamla Plant Manager by M

b

  1. ed.

M. A. Wavis A

Rad. Material Shipping Coordinator

{$

g-g N.x R

~

WAS/ MAD /siv

.w?

2 rn P m

w o

D Attachment (1)

Enclosure (1) cc:

Shipment File

/

ce;.g 9;

'Mn (Q

' ~.,.

[,b]

.. y tw I

' ' L Ll, 8507100503 850605

.% d.ZiM

~

PDR ADOCK 07000754 C

PDR

'k CCC2190 t