Text
e
/?eekaf
/,p u
'n UNITED STATES
[ ' 3.r, ')
NUCLE AR REGULATORY COMMISSION L
w W A$HING T ON, D. C. 70%$
o.
february 10, 1993 Docket No.52-003 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Divisinn Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355
Dear Mr. Liparulo:
SUBJEC1:
PROPOSED NUCLEAR REGULATORY COMMISSION (N'RC)/ WESTINGHOUSE COOPERATIVE TESTING Of THE AP600 DESIGN This letter responds to Westinghouse Electric Corporation's proposal to establish a cooperative AP600 integral test program involving both NRC-and Westinglouse-sponsored test facilities. After serious evaluation, we have concluded that establishing a cooperative testing agreement is not in the best interest of either the NRC or Westinghouse.
By its very nature, a cooperative agreement means that each party participates in the other party's programs.
Conflict of interest considerations would prohibit the NRC from participating cooperatively in that part of your experimental program in which the results would be used to directly support your certification application, We previously understood that Westinghouse planned to run additional tests with its facilities that would not be used to directly support certification, but rather would serve as additional confirma-tory testing.
However, we now understand that Westinghouse does not plan to run any additional tests in thel-facilities, and that all tests run will be used to directly support certification. Therefore, a cooperative agreement, as we originally understood it, appears no longer practical.
We do not feel that the NRC's confirmatory research program will be adversely affected by the lack of i cooperative testing agreement, in light of Westing-house's obvious interest in the NRC's confirmatory test program and the
~
170076 n
- gg2igggg;ggggg3 g6%
^
Mr. Nicholas J. Liparulo february 10. 1993 4
program's results, the NRC will keep Westinghouse informed of the status of the program and will provide you opportunity for comment.
If you have questions related to this letter, please contact Rick Hasselberg at (301) 504-1141.
l Sincerely, (Original signed by)
Dennis M. Crutchfield, Associate Director for Advanced Reactors and license Renewal Office of Nuclear Reactor Regulation cc:
See next page DISJ11BullDfj:
Docket file PDST R/F TMurley/fMiraglia DCrutchfield PDR PShea RBorchardt 1Kenyon fHasselberg GGrant, ED0 JMoore, 15B18 ACRS (10)
AThadani, 8E2 BSheron, RES SC:PD)T/ADAR D:PDg.ADARD:ADAR t,t OFC:
LA: POST:ADAR PM:PDST:ADAR RPhcn D M N 1d
) Has h NAME:
PSh RBo rdt g
DATE: 01/$/93 01/S/93 01//f/93 01//f/ 9,1 02/N/93 DSSA g REs / g,
OfC:
p NAME: AThadani' BSleron E DATE: 6}1b/93 01/) %
OfflCIAL RECORD COPY:
CNFIRMTS.RH Y
- h Mr. Nicholas J. Liparulo Westinghouse Electric Corporation Docket No.52-003 AP600 cc:
Mr. B. A. McIntyre Advanced Plant safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania 15230 Mr. John C. Butler Advanced Plant Safety & Licensing Westinghouse Electric Corporation Energy Systems Business Unit Box 355 Pittsburgh, Pennsylvania Mr. H. D. Beaumont Nuclear and Advanced Technology Division Westinghouse Electric Corporation One Montrosa Metro 11921 Rockville Pike Suite 450 Rockville, Maryland 20852 Mr. Sterling Franks U. S. Department of Energy NE-42 Washington, D.C.
20585 Mr. S. H. Hodro EG&G Idaho inc.
Post Office Box 1625 Idaho Falls, Idaho 83415 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Room 8002 Washington, D.C.
20503 Mr. Frank Ross U.S. Department of Energy NE-42 Washington, D.C..
20585 l
i