ML20128J047

From kanterella
Jump to navigation Jump to search
Forwards LER 91-024-01 Re Failure to Take Required TS Action When Loop a of ESW Sys Inoperable.Rev Revises Corrective Action Commitments
Date released: 05/21/2020 Download: ML20128J047


:on 911025,Loop a of ESW Sys Inoperable When ESW Check Valve Failed to Perform,As Designed.Caused by Equipment Failure & Failure to Follow Procedures.Check Valve Repaired & Raw Water Task Force Established
ML20128J050
Person / Time
Site: Limerick Constellation icon.png
Issue date: 02/08/1993
From: Madsen G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20128J050 (8)
Forwards LER 91-024-01 Re Failure to Take Required TS Action When Loop a of ESW Sys Inoperable.Rev Revises Corrective Action Commitments
ML20128J044
Person / Time
Site: Limerick Constellation icon.png
Issue date: 02/08/1993
From: Doering J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20128J044 (1)