Forwards Prioritization Evaluation for Generic Issue 37, Steam Generator Overfill & Combined Primary & Secondary Blowdown. Safety Concerns Re Issue Should Be Addressed in Unresolved Safety Issue A-47
ML20128H928
Person / Time
Issue date: 05/17/1985
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Bernero R, Knight J, Russell W
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-47, REF-GTECI-SY, TASK-A-47, TASK-OR NUDOCS 8505300665
Download: ML20128H928 (5)


Text

o i.

Distribution g%dDmisess!!r, SPEB R/F DST C/F AD/T R/F LRiani ST li W WMinners FRowsome TSpeis MEMORANDUM FOR:

Robert M. Bernero, Director, DSI DEisenhut/HDenton James P. Knight, Acting Director, DE MFarr William T. Russell, Acting Director, DHFS REmrit Themis P. Speis', Director, DST RColmar LRiani c/f FROM:

Harold R. Denton,' Director SPEB Route Cop)

Office of Nuclear Reactor Regulation

SUBJECT:

SCHEDULE FOR RESOLVING AND COMPLETING GENERIC ISSUE NO. 37~- STEAM GENERATOR OVERFILL AND COMBINED PRIMARY AND SECONDARY BLOWDOWN Generic Issue No. 37, " Steam Generator Overfill and Combined Primary and

?

Secondary Blowdown" has been prioritized as discussed in the enclosed evaluation. There is no need for a separate resolution of this issue, but you should assure that the safety concerns identified in this issue are appropriately addressed in USI A-47, " Safety Implications of Control

. Systems" and the implementation of NUREG-0737 item I.C.1, "Short-Term

' Accident Analysis and Procedures Revision" (MPA's F-04 and F-05).

In accordance with NRR Office Letter No. 40, " Management of Proposed Generic Issues," there is no separate resolution to this issue to be monitored by the Generic Issue Management Control System (GIMCS).

However, the attached evaluation will be incorporated into NUREG-0933, "A Prioritization of Generic Safety Issues," and is being sent to other NRC offices, the ACRS, and PDR for comments on the accuracy and completeness of the evaluation.

Any changes as a result of comments will be coordinated with you.

Should you have any questions pertaining to the contents of this memorandum, please contact Louis Riani (24563).

bdN/X Harold R. Denton, Director by Office of Nuclear Reactor Regulation

Enclosure:

/

g/

Prioritization Evaluation h

.cc:

See next page 8505300665 850517 AD T

I/

pg g

PDR OTECI GSYA-ratyped.4/29/85:slm. *SEE PREVIOUS CONCURRENCES Q

N SPEB: DST AD/T: DST D: DST DD:NRR D:MW SPEB DS'.T diTin;i*iiff Tsihiffsf" TR6ss6s64" ' T$isti#" ""' 'EssF". ".. ". NDM. 6n" ' '

. w,c,'

su omy ac eoau m oo somcu ono OFFICIAL RECORD COPY uscm mi-muo :

J

  • - -cc:

'V. Stello.

~

J. Funches R..Minogue, RES

. R. DeYoung, IE

- C. Hel temes,- Jr.. AE00 -

J. Davis.

.F.

Rowsome W. Minners

. ACRS

. PDR R. Capra K. Kniel L. Riani

8. Sheron R. - Emrit' N

.~

s

- oncet e=>

cove >

PaaC #oana us po so Nacw oreo -

' OFFICIAL RECORD COPY owm + = - n.

4

~

P

+

ENCLOSURE PRIORITIZATION EVALUATION GENERIC ISSUE NO. 37

" STEAM GENERATOP,0VERFILL AND COMBINED FRIltARY AND SECONDARY BLOWDOWN" i

'a'

. g..

o

-4 e..-

Issue No. 37: ' Steam Generator Overfill and Combined Primary and Secondary Blowdown L

~ DESCRIPTION-Historical Backcround In a report completed in 1980 (Reference A) the AEOD identified potential safety prcblems concerning steam generator overfill due to control system failures and combined primary and secondary blowdown.

As a result of discussions with the Commissioners and the EDO, NRR reported in a J

May 27,~1981 memo to-AE00-(Reference 495) that the' steam generator overfill problem was to be integrated as a sub-task into' Unresolved Safety Issue A-47.

In addition, separate work was scheduled on the matter of combined primary and secondary blowdown to establish its safety significance.

With_ regard to the issue concerning steam generator overfill, USI A-47 deals

~

with control system failures leading to overfill.

A.related issue, Generic Issue 67, " Steam Generator Staff Actions" includes actions which address steam generator overfill following a steam generator tube rupture'and are not'part'of USI A-47.

With regard to the safety issue concerning combined primary and secondary blowdown, this issue has been addressed in the NUREG-0737 item I.C.1,

'"Short-Term Accident Analysis and Procedures-Revision" (MPAs' F-04 and F-05).

CONCLUSION

'The safety concerns identified in this issue are addressed in USI A-47'and NUREG-0737,. item I.C.1.

m

's

+

b

--.-.~A

y,--

0

References:

A.

"AE0D Observations and Recommendations Concerning the Problem of Steam Gcnerator Overfill and Combined Prinary and Secondary Bleridcun,"

AE0D/C005, December 17, 1980.

495. Memo fran H. Denton to C. Michelson, " Steam Generator Overfill and Combined Primary and Secondary Blowdown, May 27, 1981.

- - ~