ML20128H894

From kanterella
Jump to navigation Jump to search
Amend 63 to License DPR-61,revising Item III.D.3.4, Control Room Habitability, of 830314 Confirmatory Order to Remove Required Completion Date of Dec 1984 & to Indicate That Item No Longer Part of Order
ML20128H894
Person / Time
Site: Haddam Neck, 05000000
Issue date: 07/01/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20128H864 List:
References
TASK-3.D.3.4, TASK-TM NUDOCS 8507100298
Download: ML20128H894 (2)


Text

- _ _ _

eaerg f , tg UNITED STATES y g NUCLEAR REGULATORY COMMISSION

g WASHINGTON, D. C. 20555

%, . . . . + ,o[

_ CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT DOCKET NO. 50-213 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 63 License No. DPR-61

1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for amendment by the Connecticut Yankee Atomic Power Company (the licensee) dated November 7, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

8507100298 850701 PDR ADOCK 05000213 P PDR

2. Accordingly, the license is amended by revising Item III.D.3.4 under Section III of the March 14, 1983 Order Confirming Licensee Comitments on Post-TMI Related Issues to (1) remove the required completion date of December 1984, (2) replace the completion date with "To Be Determined," and (3) indicate that Item III.D.3.4 is no longer considered part of the Confirmatory Order.

3.

This license amendment is effective as of the date of its issuance.

FORTHE,NUCLEARREGULATORYCpWISSION

, J .

John . Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing Date of Issuance: July 1,1985