ML20128H859

From kanterella
Jump to navigation Jump to search
Advises That Rev 23 to Physical Security Plan Acceptable for Inclusion Into Plan
ML20128H859
Person / Time
Site: Westinghouse
Issue date: 10/01/1996
From: Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Fici J
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9610100084
Download: ML20128H859 (2)


Text

. - - _ _. _ . _ .__ ~ . _ _ _ _ _ ___ _ - _ _ _ - . . _ . _ _ -. __ ..

i

. october 1,1996  !

l i

i l

l Westinghouse Electric Corporation 1 ATTN: Mr. J. A. Fici, Manager Columbia Plant Commercial Nuclear Fuel Division

Drawer R 1 Columbia, SC 29250

SUBJECT:

PHYSICAL SECURITY PLAN, REVISION 23 l

Dear Mr. Fici:

4 This acknowledges the receipt of your letter of Seatember 1,1996, which transmitted Revision 23 to your Physical Security )lan. ,

Revision 23 changed the configuration of the Controlled Access Area and described the current Shipment Tracking System. Our review of the Revision j has found it to be acceptable for inclusion into the Plan. i It has been determined that your submittal contains information of a type I specified in 10 CFR 2.790(d). It is therefore deemed to be commercial or financial information within the meaning of 10 CFR 9.17(a)(4) and shall be subject to public disclosure only in accordance with the provisions of 10 CFR 9.19.

Should you have any questions concerning this letter, we will be glad to 1 discuss them with you.

i Sincerely,  ;

(original signed by G. L. Troup)

Edward J. McAlpine, Chief Fuel Facilities Branch

, Division of Nuclear Materials Safety Docket No. 70 1151 License No. SNM 1107 i cc: (See Page 2) 9610100084 961001 i PDR ADOCK 07001151 i C PDR 4

100006 ,

86DW

see .

__ . - - . - . . -. - - . - - - . . . ~ . . . - - -. .- - --. . - - - - -

. .g i -

WEC 2 i

cc: Wilbur Goodwin, Manager

Regulatory Affairs Westinghouse Electric Corporation Commercial Nuclear Fuel Division Drawer R 2 Columbia, SC 29250 l Max Batavia, Chief Bureau of Radiological Health S. C. Department of Health
and Environmental Control
2600 Bull Street

! Columbia, SC 29201 Distribution:

, E. McAlpine, RII l

' C. Bassett. RII G. Shear, RIII

C. Cain, RIV

! F. Wenslawski, RIV 1 PUBLIC l License Fee Management Branch i

I a

i l

l 5

I i

i orrin o;; nyus ;f p;; nyus SIGNATURE 6 4 hh j NAME WTcbtn avloe sen DATE jejk/ Qb, 96 o9 , 7 0 , 96 09 , , 96 o, , , 96 o, , , 96 o9 , , 96 COPY? (fES) ~ NO YES [f]) VES NO VES NO VES NO YES NO OFFICIAL % CVed COPi DOCUMtNT NAMt: i;\ifBli\ktFukia\itCyo02.kFi i

1 l

l

  • 4 l ,

, 'x.J^. ,

f..

. ,, ..s ..y::.

, -: . n Westinghouse Commercial Nuclear or r n Electric Corporation Fuel Division M'agg250 NRC-96-041 September 1,1996 U. S. Nuclear Regulatory Comnussion l

ATTN: Mr. Edward J. McAlpine, Chief Fuel Facilities Branch Division of Nuclear Materials Safety 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323-0199 Gentlemen:

l

Subject:

Docket No. 70-1151 - Update of Physical Security Plan j l The Westinghouse Electric Corporation hereby submits a revision updating the Physical Security Plan

! for the Commercial Nuclear Fuel Division's Fuel Fabrication Facility located near Columbia, South Carolina. This submittal is being made in accordance with the provisions of 10CFR70.32(e), since it does not decrease the effectiveness of the currently approved security plan.

All pages in each of revised Chapters 2,4, and 7, as well as the revised Table of Contents and 8.0, Signature Page, are included. Revisions are being made 1) to reflect an expansion of the CAA in order to eliminate the need for a gate, and 2) to describe Shipment Tracking under our current computerized

) system. All requirements for Access Control and Shipment Tracking will continue to be met under the revised Plan.

l Westinghouse requests that the enclosures to this letter be withheld from public disclosuste in accordance with the provisions of 10CFR2.790(d). If you have any questions, please write to me at the above address; telephone (803) 776-2610, Extension 3426; or Fax (803) 695-3964.

l Sincerely, WESTINGHOUSE ELECTRIC CORPORATION l

1 l Charles ' anders, Manager Nuclear Materials Safety and Safeguards cc: U. S. Nuclear Regulatory Commission gggg=

, y p u 7' A*ITN: Mr. Bob Pierson, Chief

-Licensing Branch

~

ivision of Fuel Cycle Safety & Safeguards ashmgton, DC 20555 The Msam@oose %nmace/Na:harfue@sm - Wimtof0>e 1.998Matoon Ba&geNabw/Qaidykant

=, . w 3 u..