Submits Annual Rept of All Challenges to Pressurizer Power Operated Relief Valves or Safety Valves for 1992
ML20128H843
Person / Time
Site: Beaver Valley
Issue date: 02/08/1993
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302170180
Download: ML20128H843 (1)


Text

I fie vet valier Power Sistion

$tuppmgpoti. PA i$077-0004 JOHN 0 SIEBER

_ 1412) 3934256 Seriiot Vice President and Fas (412) 643-8069 0$N? t $.$lon February 8, 1993 i

U.

S.

Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Deavor Valley. Power Station, Unit No. 1 and No. 2 IIV-1 Docket No. 50-334, Licenso No. DPH l DV-2 Docket No. 50-412, Licenso No. NPF-73 Annual Report of All Challenges to the Pronourizer Power-Operated Rolief Valvon or Safety Valves This report is submitted in accordance with the 13eaver Valley Power Station Unit Hos. 1 and 2 Technical Specification 6.9.1.5.b.

Unit 1:

'rhe re were no challengen to the pressurizer safety and power operated relief

  • alves (PORV) at Unit 1

during the period of January 1, 1992, to December 31, 1992.

Unit 2:

There were no challenges to the pressurizer safety and power operated relief valves (PORV) at Unit 2

during the. period-of January 1, 1992, to December 31, 1992.

Sincitrely, 7

D. Sieber cc:

_Mr.

L.

W.

Rossbach, Sr. Resident Inspector Mr. T. T.

M% t l'i, NRC Region I Administrator.

Mr.

G.-5.

Edison, Project Manager Mr. M.

L.

Bowling -(VEPCO)

EUfTRK 21Qhl$hh!4 TH pp t