ML20128H500
| ML20128H500 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/30/1996 |
| From: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19355E444 | List: |
| References | |
| PBL-96-0212, PBL-96-212, NUDOCS 9610090367 | |
| Download: ML20128H500 (1) | |
Text
_
'Electnc POWER COMPANY Po6nt Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0212 September 30,1996 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DOCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPl.EMENTING PROCEDURES POINT BEACH NUCLEAR PLANT. UNITS 1 & 2 i
J Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.
Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPilONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.
Sincerely, e
.g S. A. Patulski General Manager kmt Enclosure cc:
NRC Resident inspector (w/o/e) i incident Response Center, Region 111 9610090367 960930 g'
j'f p ({ J /
PDR ADOCK 05000266 1
F PDR 7 'fN\\
y r>c GNw
%b(;A PDL 1 Iop ot$c L
t rJoM l q r30 A suwm WHluvah Exm Omn&n
)