Informs of Planned Outage of at Least 3 Wks During Which Installation & Testing of Independent Alternate Shutdown Sys Will Be Completed,Per Item 2.C.(9)(d) of Low Power OL Requirement.Planned Outage to Begin in Sept/Oct
ML20128G934
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/05/1985
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NE-85-0912, NE-85-912, NUDOCS 8507090360
Download: ML20128G934 (2)


Text

._

J',

=

Y!tyne H. Jim Vice President Nuclear Operations M $I Edison =du*ortn ointe s,gnway s

= " - "

July 5, 1985 NE-85-0912 Mr. B. J. Youngblood, Chief Director of Nuclear Reactor Regulation Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Youngblood:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. MPP-33

Subject:

Schedule for Installation of Indeoendent Alternate Shutdowh System Item Number 2.C. (9) (d) of the Fermi 2 Low Power Ooerating License requires, in effect, installation of the independent alternate shutdown system ("3L panel") orioroto startup after the first known outage of three weeks or longer which occurs after September 30, 1985.

This letter is to inform you that Detroit Edison will have a olanned outage of at least this duration tentatively starting in the September /

October time frame, and in no case starting later than October 30, 1985.

l In accordance with the license condition,. Detroit Edison i

will comolete installation and testing of the 3L panel orior l

to startuo from this outage.

Included in this commitment are comoletion of any procedural modifications and onerator L

. training required to assure the alternate shutdown system is functional from both a personnel, software, and hardware standooint.

Pronosed technical noecifications for this 3L canel will be submitted orior to Sectember 30, 1985.

pgas 1

I Mr. B. J. Youngblood July 5, 1985 NE-85-0912 i

Page 2 We request you olan to allocate aporooriate resources to review these prooosed specifications consistent with our placing the panel into operation.

We will inform you of a more definitive schedule for this when we submit the proposed technical specifications.

Any questions regarding this matter can be-directed to Mr._O. K. Earle (313) 586-4211.