ML20128G908
| ML20128G908 | |
| Person / Time | |
|---|---|
| Issue date: | 02/09/1993 |
| From: | Scaletti D Office of Nuclear Reactor Regulation |
| To: | Pierson R Office of Nuclear Reactor Regulation |
| References | |
| PROJECT-680A NUDOCS 9302160172 | |
| Download: ML20128G908 (4) | |
Text
'
..a
- o. "
p* **Cu
- qlo,
[f ',
UNITED STATES
- g
' g NUCLEAR REGULATORY COMMISSION W ALHINGTON, D. C,20$55 february 9, 1993 Project No. 680 MEMORANDUM FOR:
Robert C. Pierson, Director Advanced Reactors Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:
Dino C. Scaletti, Senior Project Manager Advanced Reactors Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation SUBJECI:
FORTHCOMING MEETING WITH ASEA BROWN B0 VERI - COMBUSTION ENGINEERING (ABB-CE)
DATE AND TIME:
February 22, 1993 9 a.m. - 4 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Room 1/F/19 i
Rockville, Maryland 20852 PURPOSE:
(1) Discuss the BNL PIUS. systems analysis, failure modes-effects and criticality analysis (FMECA), and hazards and operability (HAZ0P) relative to plant systems and components,(2)discusspotential'accidentinitiatorsand.
sequences, and (3)-solicit clarification relative to certain PlVS systems.
See enclosed agenda.
PARTICIPANTS *:
EG ML R. Pierson E.-Throm P. Kroeger D. Scaletti T.:Cox J. Higgins R. Meyer, RES D. Ebert, RES R. Fu11 wood, L. Shotkin A. Szukiewicz, RES..
et al.
et al.
RiVUR}( 70 M I D M R II E O 'S jg4##d 2o026 h21 2 930209 l
~
.680A-ppg
D Robert C. Pierson February 9, 1993 PARTICIPANTS *:
ABB-CE/ABB ATOM C. Molnar T. Pedersen H. Thornburg L. Nilsson, et al.
U. Bredolt Original signed by:
Dino C. Scaletti, Senior Project M> nager Advanced Reactors Project Directorate Associate Directorate for Advanced-Reactors-and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
Agenda cc w/ enclosure:
See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058,06/28/78.
However, portions of this.
meeting may be closed to the aublic to protect ABB proprietary information.
Members of the public who wisi to attend should contact me at 301-504-1104, pistribution:
AEChaffee, EAD ll/A/1 Central File ELJordan HNBB 3701 PDR Receptionist OWFN PDAR R/F CERossi, DRil 9/A/2 TEMurley 12/G/18 ACRS(10)
P 315 FJMiraglia.
12/G/18 OGC 15/B/18 DMCrutchfield OPA 2/G/5 RCPierson Hall Room, PHAS 12/G/18 THCox P0' Dell, PTSB 12/E/4 EDThrom LPlisco 10/A/9 DCScaletti PShea r
-DEbert:
NLS 013 PIUS R/F-RMeyer NLS 013 PDAR Meeting File ASzukiewicz NLS 013
-LShotkin NLN 353 LA:ADAR PM:PDAR' SC:P PSheaGk DS -
- sa THCo k-
'p/tj/33
'3'
.t/?/93 0FFICIAL RECORD COPY Document Name:
PIUSMTG2.22
if 2.
Robert C. Pierson february 9, 1993 1
PIUS Project No. 680 cc:
Regis Hatzie, Director 9354-0401 Ulf Lindolow, Section Chief Advanced Water Reactor Projects PWR Core Design, fuel Division ABB Combustion Engineering ABB Atom, ABB Nuclear Power S-721 63 Vasteras-1000 Prospect Hill Road Sweden Windsor, Connecticut 06095-0500 John F. Carew Mark Crump Manager 9341-0407 Building 475 B Reactor Engineering Brookhaven National Lcboratory ABB Combustion Engineering Upton, New York 11973-5000 Nuclear Power 1000 Prospect Hill Road Gregory J. Van Tuyle Windsor, Connecticut 06095-0500 Building 475 B.
Brookhaven National Laboratory Chuck Molnar 9377-0407 Upton, New York 11973-5000 Nuclear Systems Licensing ABB Combustion Engineering Johann Lindner, Vice President Nuclear Power Technology and Engineering 1000 Prospect Hill Road ABB Atom, Inc.
Windsor, Connecticut 06095-0500 200 Great Pond Drive Windsor, Connecticut 06095 Lars Nilsson, Technical Manager PIUS Reactor Division Ernie H. Kennedy, Manager ABB Atom AB Nuclear Systems Licensing S-721 63 Vasteras ABB Combustion Engineering Sweden Nuclear Power 1000-Prospect Hill Road Harold D. Thornburg P.O. Box 500 ABB Atom, Inc.
Windsor, Connecticut-06095-0500 901 South Warfield Drive Mt. Airy, Maryland 21771 Daniel F. Giessing, Director Office of LWR Safety and Technology Mail Stop NE-42 U.S. Department of Energy Washington, DC 20585 Steve Goldberg, Budget Examiner Office of Management and Budget 725 17th Street, NW Washington, DC 20503' 1
g
s
.a 4
ENCLOSUR[
NRC/ABB-CE Meeting february 22, 1993 TENTATIVE AGENDA 9:00 Introductiont 9:15 - 10:00 Overview of PlVS System Study BNL/J.C. Higgins Key Operator Actions & Independent BNL/J.C. Higgins Safety Systems 10:00 - 10:15 Break 10:15 - 11:15 PIUS Event Analysis BNL/R.R. Fu11 wood' 11:15 - 11:45 issues.for further Evaluations BNL/P.G. Kroeger 11:45 - 12:00 Questions 12:00 - 1:00 Lunch 1:00 - 3:00 ABB Response to NRC/BNL Requests ABB 3:00 - 4:00 Discussion / Comments I
. h e
W F
w T