Text
'
e
.4 VERMONT YANKEE NUCLEAR POWER CORPORATION g
RD 5, Box 169, Ferry Road, Brattleboro, VT 05G01
[p 85-62 g,\\
ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 TELEPHONE 617-672 8100 July 2, 1985 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Reference:
a)
License No. OPR-28 (Docket No. 50-271) b)
Letter, USNRC to VYNPC, NVY 85-90, dated 5/2/85 (Generic Letter 85-07)
Dear Sir:
Subject:
Implementation of Integrated Schedules for Plant Modifications (Generic Letter 85-07)
Enclosed"is our response to Generic Letter 85-07 [ Reference b)]
in the format requested. Vermont Yankee would be pleased to discuss this subject with you at any mutually agreeable time.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION j
\\
Warren P. Murphy Vice President and Manager of Operations
/dm ool I
8507090302 B50702 PDR ADOCK 050 21 P
ENCLOSURE 2 RESPONSE FORMAT - GENERIC LETTER 95- 07 PLANT NAME:
Vermont Yankee
[
UTILITY:
Vermont Yankee Nuclear Power Corporation l
I.
INTENTIONS A.
Intend to work with the staff to develop an ILS B.
Have reservations that must be resolved before developing ILS C.
Do not presently intend to negotiate an X
ILS with the staff D.
Plan to implement an informal ILS only II.
STATUS
- A.
If you answered I.A a,bove:
l.
Have you settled on a method for prioritizing the work at your plant (s)?
Circle One:
Yes No If yes, select best description:
Engineering judgement Analytic Hiearchy process Risk based analysis Cost-benefit analysis Other (please describe)
If no, provide estimated date for selecting a methodology:
Date I
or S
If not presently available, provide estimated' date' for scheduling the selection of a methodology:
2.
What is your estimated date for making a submittal to the NRC-t or If not presently available, planned date for scheduling a submittal to the NRC
}
B.
If you answered I.B above:
1.
Please explain your reservations on separate sheet (s) or provide your schedule for supplying an explanation See separate sheet (s) or Separate submittal scheduled for (Date) 2.
If available to meet with the staff to discuss your concerns, propose a time frame for such a meeting and provide a contact that can make arrangemants Contact / Time Frame _
Phone Number C.
If you answered I.C 1.
Would you he willing to meet with the staff to discuss the development of an ILS for your facility (s)?
Circle One:
No If yes, propose a time frame for such a meeting and provide a contact that can rake arrangements.
Contact R.W. Capstick Time Frame To be arranged Phone Number (617)872-8100 If no, any constructive comments you have would be appreciated.
III.
ADDITIONAL ITEMS Please e,ake any suogestions you may have as to how a utility sponsored availability / reliability pro.iect might be credited for plant safety enhancement. Provide additional constructive coments as appropriate.
\\
.