Confirmatory Action Ltr CAL-4-93-04 Confirming Understanding Reached from 930204 Telcon That Plant Will Not Be Taken Critical Until NRC Briefed of Results of Efforts to Correct Overspeed Trip Condition Affecting turbine-driven Afps
ML20128G484
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/05/1993
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hall D
HOUSTON LIGHTING & POWER CO.
References
CAL-4-93-04, CAL-4-93-4, NUDOCS 9302160019
Download: ML20128G484 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - -

Mog UNITE D sT ATES

[@. k NUCLEAR '1EGULATORY COMMISSION

[

HE0loN IV 611 RYAN PLAZA DRIVE, SulTE 400

[

ARLINGTON, TEX AS 760118064

  • e..*

FEB - 51993 Docket 50-498 50-499 License NPF-76 NPF-80 CAL 4-93-04 Houston Lighting & Power Company ATIN:

Donald P. Hall, Group Vice President, Nuclear P.O. Box 1700 Houston, Texas 77251

SUBJECT:

CONFlRMATORY ACTION LETTER Pursuant to our telephone conversation on February 4, 1993, it is our understanding that South Texas Project, Units 1 and 2, will not be taken critical until you have briefed the NRC staff of the results of your efforts to correct the overspeed trip condition that is affecting the turbine-driven auxiliary feedwater pumps.

Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, and 10 CFR 2.204, you are required to notify me immediately if your understanding differs from that set forth above.

Issuance of this Confirmatory Action Letter does not preclude issuance of an ordar formalizing the above commitments or requiring other actions on the part of the licensee.

Nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of-this letter.

In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.

The responses directed by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Action of 198u, Pub. L. No.96-511.

CERTIFIED Mall - RETURN RECEIPT RE0 VESTED 120000 9302160019 930205 l

f PDR ADDCK 05000498

.j

{)

p.

PDR

)

(

. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.

Sincerely, n L.Yb lames L. Milhoan legional Administrator cc:

Houston Lighting & Power Company ATTH: William J. Jump, Manager Nuclear Licensing P.0, Box 289 Wadsworth, Texas 77483 City of Austin Electric Utility Department ATTN:

J. C. Lanier/M. B. Lee P.O. Box 1088 Austin, Texas-78767 City Public Service Board ATTN:

R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296-Newman & Holtzinger, P. C.

ATTN: Jack R. Newman, Esq.

1615 L' Street, NW-Washington,.D.C.

20036 Central--Power and Light Company ATTN:

D.'E. Ward /T. M. Puckett P.O. Box 2121 Corpus Christi,-Texas 78403 INP0 Records Center 1100 Circle 75 Parkway =

Atlanta, Georgia 30339-3064 Mr. Joseph M. Hendrie.

50 Bellport Lane-Bellport. New York 11713-

,'-4'-

, s.

1 Bureau of Radiation Control State of' Texas

- 1101 West 49th-Street Austin, Texas-78756

~

Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Licensing Representative Houston Lighting & Power Company Seite 610 Three >3tro Center r

Bathesda, Maryland 20814

- ?

Houston Lighting & Power Company

. ATTN: Rufus S. Scott, Associate

-General Counsel P,0. Box 61867 Houston, Texas -77208 NRC Public Document Room Texas Radiation Control Program Director

[

s i

4 i

b

'.s w

3 FEB 5 N

" bCC:

DMB;1Ef36?

J. H. Sniezek, DEDR J. L. Lieberman, D/0E (2)

L. J. Chandler, Asst. GC/0GC T. E. Murley, D/P"'

RIV Coordinator, s0 J. L. Milhoan, RA L. J. Callan, D/DRSS S. J. Collins, D/DRS A. B. Beach, D/DRP G. F. Sanborn, E0 W. L. Brown, RC' J. Carson, ORA RIV File J. T. Gilliland,-Pi(0 A. T. Howell, C/PSD J. I. Tapia, SRI' T. F. Stetka, C/DRSS:MS M. A. Satorius, PSD l

(

AI 93-037-RIV:C:DRh Ih h EO

'RC DRA -

FJ t

- ATHowell;df MVM8fRio A

GS n WB wn JMont ery-JMi jih an-2/g' /93 U[J/Jy/93 2/fach'

'/'/93

.2/3 /93-

/93 2/' /93 2/ /93 2

M ff py

..I s