Forwards Safety Insp Repts 50-352/93-01 & 50-353/93-01 on 930111-15.No Violations of Regulatory Requirements Noted. Effective Programs for Measuring Radioactivity in Process & Effluent Samples Noted
ML20128G446
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/04/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20128G448 List:
References
NUDOCS 9302160011
Download: ML20128G446 (3)


See also: IR 05000352/1993001

Text

- - - - - - - . - - - - _ - - - - - - - - - - - - _ - - . _ _ _ -

,

D^D

,

i

,

ifE8 0 4 1993

Docket Nos. 50-352

50-353

Mr. D. ht. Smith

Senior Vice President -

Nuclear

Philadelphia Electric Company .

Nuclear Group lleadquarters I

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

Dear hir. Smith:

Subject: Combined inspection Nos. 50-352/93-01 and 50 353/93-01

This letter refers to the safety inspection conducted by Mr. J. Kottan and his. N. McNamara

of this office on January Il-15,1993, of activities authorized by NRC License Nos. NPF-39 and

NPF 85 at the Limerick Generating Station, Units 1 & 2, Limerick, Pennsylvania, and a the

discussions of our findings held by Mr. Kottan and Ms. McNamara with Mr. J. Doering and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are important to public health and safety, and are

described in the NRC Region I Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

In addition, our Mobile Laboratory was brought to your site and used by the inspectors to make

certain independent measurements. The basic purpose of these independent measurements is to

verify your capability for analyzing radioactive -effluents, and to achieve and maintain

comparable methods of analyses between your facility and the NRC. The data from these

measurements are included in this report with the exception of the wet chemistry results, which

will be documented in a subsequent inspection report.

-

9302160011 930204

PDR - ADOCK 05000352

0 PDR

OFFICIAL RECORD COPY G: LIM 9301.CIR - February 4,1993

qW

IpL n pj

V1 l

n

P

.

,ffB 0 4 1933

Philadelphia Electric Company 2

Within the scope of this inspection, you had in place effective programs for measuring

radioactivity in process and effluent samples and for measuring chemical parameters in plant

systems samples. No violations of regulatory requirements were observed and no response to

this letter is required.

Sincerely,

Origin &l Signed Dyl

Jarnes H. Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch _

Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Combined inspection Report No. 50-352/93 01 and 50-3S3/93-01

cc w/ encl:

R. Charles, Chairman, Nuclear Review Board

D. R. Helwig, Vice President - Limerick Generating Station

G. J, Beck, Manager - Licensing Section

G. Madsen, Regulatory Engineer - Limerick Generating Station

Secretary, Nuclear Committee of the Board

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety information Center (NSIC)

K. Abraham, PAO (2)

NRC Resident inspector

Commonwealth of Pennsylvania

OFFICIAL RECORD COPY G: LIM 9301.CIR February 4,1993

y f

,g

i T*-

.-

-

- - - _ - _m- - -_ . _ . - - - __ _ _ . _ _ _ _ . _ _ - _ - _ _ _ . _ __.__-----i--

_. ______-_ _

.

R8 0 41933

'

Philadelphia Electric Company 3

bec w/ encl:

Region I Docket Room (with concurrences)

E. Wenzinger, DRP

C. Anderson, DRP

N. Perry, SRI, Yankee Rowe

DRS/ Ell SALF Coordinator

V. hicCrec, OEDO

F. Rinaldi, NRR

,

L

RI: S :DRSS N: SS RI:DRSS

McNamara/ tmh Kottan Miller r

02/['/93 02/ /93 02/[/93 02/V/93

!

OFFICIAL RECORD COPY 0: LIM 9301.CIR February 4,1993