ML20128G272

From kanterella
Jump to navigation Jump to search
Responds to 960802 Request for Port Approval & Rail Route & Alternate to Be Used for Transport of Spent Fuel from Naval Weapons Station,Charleston,Sc to Doe,Savannah River Plant, Sc
ML20128G272
Person / Time
Site: 07001252
Issue date: 09/12/1996
From: Shankman S
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Oshinowo F
EDLOW INTERNATIONAL CO.
References
NUDOCS 9610080421
Download: ML20128G272 (4)


Text

_ _

SAE31 ADS pmCOM September 12, 1996 185 SFP0:GMB Edlow International Company ATTN: Ms. Franchone Oshinowo Assistant Manager, Operations 1666 Connecticut Ave., N.W., Suite 500 Washington, DC 20009

Dear Ms. Oshinowo:

This is in regard to your requests dated August 2, 1996, for a port approval and for a rail route and alternate, to be used for transport of spent fuel from the Naval Weapons Station, Charleston, South Carolina, to the DOE Savannah River Plant, South Carolina.

The Charleston Naval Weapons Station Port meets the regulatory requirements of 10 CFR 73.37.

As previously discussed, Route 1 of your request has been designated the Primary Route, and Route 2 has been designated the Alternate Route. The primary and alternate routes, as set forth in Enclosure 1 of each route, meet the regulatory requirements of 10 CFR 73.37. Enclosures 2 and 3 of each route constitutes the route approval. Unless renewed, these route approvals will expire two years from the date of this letter. Note that transportation of licensed radioactive material must be conducted in compliance with appli-cable U.S. Department of Transportation regulations.

Note that 10 CFR 73.37(d)(3) requires rail shipments to be accompanied by escorts who have communications capability to summon assistance in case of an emergency. NRC staff have completed the arrangements with law enforcement agencies required by 10 CFR 73.37(b)(6). Information on these arrangements is provided in Enclosures 2 and 3 for each route, and is to be incorporated into your shipment plans and provided to your carrier along with instructions regarding its use.

The notification requirements of 10 CFR 73.37(f) and 73.72, and the informa-tion protection requirements of 10 CFR 73.21, apply for each shipment made under these approvals. When making notification to this office under 10 CFR 73.72, please confirm that the appropriate governors or designees will or have been notified.

9610080421 960912 "U" "

eon UPON REMGVAL OF ATTACllMEHT THIS DGGUmi IS:

' Acc on+rclind I

coeument Transmiaed sereunh-conuins sdeguards wormauon

( sta - /L m

  • d~k [ d i rm&e m. um. e m aP"uPY o '

g o5 SA:EGJAUS]:{UA 3 N

% _a I

Ms. F. Oshinowo - 2'- September 12, 1996 Should you require' additional information or have questions concerning this matter, please contact John Cook of my staff at (301) 415-7832.

Sincerely, Sf ,

Susan F. Shankman, Chief Transportation Safety and Inspection Branch ,

Spent Fuel Project Office  !

Office of Nuclear Material Safety 1 and Safeguards  !

Enclosures:

1. Primary Route ,
2. Alternate Route '
  1. 185 DISTRIBUTION: 07001252600R & 07001252610R w/ enclosures: w/o enclosures:

Docket File 07001252 NMSS/SFP0 R/F CPaperiello Case File 07001252 RFonner CHaughney Region II MMessier PDR (Enclosure 1) TAC-L22332 TAC-L22333 0FC d7 SFP0 b SfP0 SFP0 er SPEGA NAME kMBennington Jkook EEastk SSNnkman DATE 09/lR/96 09/hS6 09/12/96 09//Z/96 0FFICIAL RECORD COPY C = COVER E = COVER & ENCLOSURE N = NO COPY

.185 - Primary-t- . .

l Enclosure 1 l RAIL TRANSPORTATION ROUTE l NAVAL WEAPONS STATION CHARLESTON. SC

(- TO DOE SAVANNAH RIVER PLANT. AIKEN. SC l SOUTH CAROLINA l 1. -Weapons Station to CSX (N. Rhet Av.)' 10 miles I' 2. N. Rhet Av. to Ashley Junction 2 miles

! 3. Ashley Junction to Fairfax 85 miles I

'4. Fairfax to Dunbarton- 38 miles

5. Dunbarton to Savannah River Plant 8 miles t

l Total- 143 miles l

1-l l

r l l 4 l

I I- )

l l

I

! September 1996 l

_2

._ l.,i; i

185 - Alternate Enclosure 1  !

l

' RAIL TRANSPORTATION ROUTE NAVAL WEAPONS STATION CHARLESTON, SC TO DOE SAVANNAH RIVER PLANT, AIKEN. SC i i

-SOUTH CAROLINA  !

! 1. Wea)ons Station to CSX (N. Rhet Av.) 10 miles

2. N. Rhet Av. to Ashley Junction, SC :2 miles l 3. Ashley Junction to Florence, SC 96 miles .
4. Florence. SC to North Carolina line 39 miles i Subtotal 147 miles i NORTH CAROLINA.
5. North Carolina line to Pembroke 12 miles  !
6. Pembroke to the South Carolina line 93 miles l Subtotal 105 miles I SOUTH CAROLINA
7. CSX to_ Georgia state line Subtotal 143 miles i i

i' GEORGIA

8. CSX to South Carolina state line Subtotal 21 miles f i

\

j SOUTH CAROLINA i

\ '

!- 9. CSX to DOE Savannah River Plant Subtotal 15 miles  !

Total 431 miles i

i  ;

k I

September 1996 i l

. . . -