~__Wisconsini x
VElectac-
- POWER COMPANY 231 W Mchgrart PC tkw 2046. Mif.oAee v4 53204
. (di4) 2202345
- VPNPD-9'3- 0 30 NRC 014 February 8,'1993 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137-Washington, DC -20555-Gentlemen:-
DOCKETS 50-266-AND 50-301 MONTHLY OPERATING REPORTS POINT-BEACH NPCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 21of thel Point Beach Nuclear Plant.for the calendar month of JanuaryT1993.
Sincerely,
/
Bob Link--
~Vice President
~ Nuclear' Power (MFB/igL cc:-
!L._L.. Smith, PSCW-.
--NRC Regional Administrator, Region III NRC Resident Inspector:
b Ll L9302120125.930131
~
l.
DR-ADOCK;'O
.4 gym.,ygg,,. p,,g,-
y
9 l'
OPERATING DATA REPORT DOCKET NO. 50-266 j
J 1-DATE: 02/02/93 COMPLETED BY: Richa:-d F. Arnold TELEPHONE:
755-2321 ext.193 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 NOTES y_
- 2. REPORTING PERIOD: January - 1993-
- 3. LICENSED THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
na
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): na
- 10. REASONS FOR. RESTRICTIONS, (IF ANY):
na THIS MONTH YEA'R TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 744.0 194,952.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 161,627.3
'13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 744.0 744.0 158,583.4
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
^
- 16. GROSS THERMAL ENERGY GENERATED-(MWH) 1,128,908 1,128,908 222,865,881
- 17. GROSS ELECTRICAL ENERGY. GENERATED 381,700 381,700-75,258,100
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 366,032 366,032 71,718,195 1L9. UNIT SERVICE FACTOR 100.0%
100.0%
81.3%
- 20. UNIT AVAILABILITY FACTOR 100.0%
100.0%
81.8%
- 21. UNIT CAFACITY FACTOR.(USING MDC NET) 101.4%
101.4%
75.5%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.0%
99.0%
74.0%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.7%
- 24. SHUTDOWNS SCHEDULED OV3R NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage 3/27/93 --5/13/93 (47 Days) l'
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
h na DATA REPORTED AND FACTORS CALCULATED AS REQUESTED.IN.NRC LETTER DATED SEPTEMBER 22,' 1977
,__a.
-~
~ -
1
. POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 A_VERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1.
MONTII JANUARY - 1993 DATE February 2.1993 COMPLETED BY R.' F. Amold TELEPHONE 414 055-2321 s
AVERAGE AVERAGE AVERAGE-DAILY DAILY
. DAILY -
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET p_AY MWe NET 126 1 MWe NET I
493 11 493 21 491 2
494 12 492 22 490 3
484 13 492 23 492 4
493 14 493 24 492 5
494 15 491 25 406 6
493 16 493 26 493 7
489 17 492 27 492 8
493 18 490 28 489 9
494 19 490 29 492 10 494 20
- 93 30 402 31 494 M
. PBF-0028a
-(03-90)
- =.
FOINT BEACH NUCLEAR PIANT Docket No.
50-266
'~
Unit Nrme Point Beach.' Unit 1
- UNIT SHUTDOWNS AND POWER REDUCTIONS Date '
February 2.1993 Completed By R. F. Arnold REPORT MONTH JANUARY - 1993 Telephone No.
414/755-2321. Ext.193 Method of Shut:ing No.
Date Type' Duration Reason' Dourn Lkensee Evers Sycem Componera Cause and Cornetive Action
'F: Forced
%eason:
' Method:
' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG4161)
D - Regulatory Restriction -
4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load 5
F - Admimstrative _
~ 6 - Other (explain)
Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain) 9 FBF-0028b -
- (03-90)
_.-.m._
u s.
?
-DOCKET NO.
- 50-266
. UNIT NAME Point Beach Unit 1 DATE:
February 2, 1993
-COMPLETED'BY R._F.EArnold TELEPHONE 414/755-2321, Ext._193-Unit 1 operated at approximately 492 MWe net throughout the report period with l'.o significant load reductions.
The degraded grid voltage relay-setpoint on the_4160 V safety-related buses were' reset to a value of 23959 17 11/2%.
The emergencyidiesel generators (G01 andLG02) were derated by.~5%E because ethlyene glycol was utilized as an engine coolant.1The
. concern isithatioverheating.--of the cylinderchead'couldiresultJin hotspots. During the' annual maintenance overhaul of G02 the ethylene glocol was_ replaced with water with-a rustlinhibitor added. G02 was.rerated to' original va' lues when it.wasireturnedito service on January.29..The annual' maintenance overhaul 1for G01--is scheduled for mid; February,_at'which time waterswith rust inhibitors added-will be used. Following-completion'of the outage:
G01'will be rerated to original values.
Safety-related maintenance included:
1.
Two silicon control rectifiers were replaced in.1DY-04 (1251VDC/125 VAC) inverter.
12.
Replaced the latch check switch on-G02 emergency-diesel 4160 V output breaker.
3.
CompletedIannual maintenance overhaul of the G02 emergency 1
-diesel.
~
d
'u,
.t
i
)Ii l\\
I
~
%%%1L %
09952.115 1
601 13840 7
9 9 6 2 2,8,1,6 6 1 0 1 d
E 3
1220 B888 l
V 7,0,2 7,3 3 3 4 o
I 68 5 n
T 97 4
7, 3, 8, r
3 A
75 5
A 9
L 11 1
131 1
U 277 M
2
.F t
U x
. S C
d e
N r
O a
1
. S h
2 A
c 3
E 7
1 i
2
. R 00000.59450400950 7
0 R
9 3
3 5
E E
4 4 0 4 0 9,6,7,0 0 0 9 0019O 1
9 5
. V T
44 4
0
/
7 I
A 77 7
637111 5
2 Y
G D
186 2
0 B
2
/
O 1,3 3 O
2 D
E T
T 1
R N
0 E
N
. R
)
E T
O O
R H
B T
E H
P A
C M
E L
P
. E E
A E
K E
P E
R T
E T
C T
M L
P O
A O
E
. T F
E D
D C
T S
O S
A
%%% 41L
. L 0000050400950.f D
f 594 O
E E
4 4 0 4 0 9,6,7,0 0 0 9 T
U A
0019OI P
T
. C n
44 4
N I
77 7
63711 1 A
I D
r 186 R
R I
d
. S o
1,3 3 U
A R
M D
T E
S
)
1 S
T
. E
. 7 S
D T
I a
I N
F E
O H
n H
A O
L
.N
. G T
U E
C O
E T
R
........ R T
A N
)
H E
A D
0 T
W D
N M
D I
2 903 E
T 0
f E
T I
55S E
P A
w F
0 S M N
Y M
A T'
U 4E T
I a
(
R 7 :
T T
E
(
O 9)
I Y
S U
P 4Z : (
N S
E Q
E T
- 5. 8 W)
A
)
H E
R N
MES L
)
H
) )
T R
A 8. :
WG F :
A H
W TT N
D A
L
- 13) SMN I
)
C W
M EE O
O S
T P352ES I
Y I
MD(
NN M
I A
A 915 WOTT
,N T
E R
(
D R9 MREA wA I
TD CR 6
E D
A1 GNR RS DAE DE P
E G
E
- : T(
aT CR ERT MD T
T
(
N L
) ) E Y
vI U
TEA X
T A
I C
TENYYT I(
R L
T U yWW( TTI R
AH RREE NN N
O U
A N rMM I I C T,
DW UEGN I I P
C R
a(
GCCA SS O
N ON E
RSS R
E L
E H u SNAAP EN I RWEHEYG OUUEE R
A P
O TV C
O AaEOTAAC ETDI N RY C
AO F
EJWRACC HT PCTLWYEG ARRR O
S N
R OGR" B
f P(
EI I I GEH* DREEO TTEE D
O T:
LLL H
n N R. S O T E NTYCCGL N
T S
NDLGABBR W
i I
U N L E. CTAAAU E
C U
I OANCAAU s
TSERHEA AI FFrD A
T OI MII DDC O E RRVOS CLFL rE T
F t
A PRRTRNNC TR OURT LIA IYYOH A
T EEATEEO POEAEARCEBTT C
D S
?HRCPP LR EHSRVMTI CAII DS N
N T
EEES EO R
EERRCRI LCCE W
A EG ELDDE VF FR nEEETVI AACS O
N MNDTE G
E NO ESHLCRAPPRN D
D I
R uETEEEVAAOW T
E T
T NTSLNUI A N
RO R
- LSACCFO U
T A
H R
R TOEEI IIC ES RECRTSS TTTTTT eS O
E I PCMSTX WA UMAUI OOTI IIII U n P
P NEI AEAAFaOE a OUEONRRENNNNNH oFaE O
URLNDMMI nPRn HNRHUGGNUUUUUS nI nR A
12345678 90 12345678901234 5
T 1
113 11111122222 2
-l l
,l'
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNTT POWER LEVEL UNTT NAME Point Bescit Unit 2' MONTH JANUARY - 1903 DATE Ta-v 2.1003 i
i COMPLETED BY R. F A m id TELEPHONE 414'755-2321 i
AVERAGE AVERAGE AVERAGE
[
i DAILY DAILY DAILY POWER LEVEL POWER LEVEL PuWER MVEL p_Al -
MWe NET DAY MWe NET DAY MWe NET I
l 4
1 496 11 496 21 408 i
2
'495 12 495 22 491 3'
497 13 495 23 4%
t 4-4%
14 496 24 495 5
496 15 494 25 409 f
6 495 16 495 26 402
?
7 491 17 473 27 495 8
495 18 493 28 495 9
495 19 494 29 404
[
10 496 20 497 30 404 l
4.
31 406
.].
4 i
7 t
7
,b i
O
_ ~,.
POINT BEACH NUCLEAR PLANT Docket No.
50-301 1
Umt Name Point Beach. Un32 UNTT SHUrDOWNS AND POWER REDUCTIONS Date T a - i 2. 1093 Completed By R. F. Amt4d Te ephone No.
4141755-2321. Ert.103 REPORT MONTH JANUARY - 1903 r
Method of w
Duretson Dem Licensee Evera Symem Cearonent Cause ont Cerrectree Action No.
Date Type'.
(Hours)
Reasca" w
Repat No.
Code
- Cede' To Prevesa Recur =cece i
- 'F: Forced -
h2
- Metnod:
- Exhibit G - Iom mi==
S: Scheduled '
- A mt Failure (explain)
' I - Manual for preparation of B - M=mtmance or Testing 2 - Manual Scram data entry sheets
. C - Refuelmg 3 - Automatic Scram LER file (NUREC4161)
- D - Regulauxy Restnction 4 - Contmustion of
- E - Operator Training &
Prevuxu Shutdown Ixensing Exam 5 - Reduced I.md F - A d....M A.G e 6 - Other (explain)
' Exhibit I - Sans: Source G - Operational Enor (explain)
H - Other (explain) '
I h
6
,..o-
. (03r90)
p,,
O DOCKET No.
50-301 UNIT NAME Point Beach Unit 2 DATE February 2, 1993 COMPLETED BY R.
P.
Arnold TELEPHONE 414/755-2321, Ext. 193 Unit 2 operated at approximately 494 Mwo not throughout the report period with no significant load reductions.
The degraded grid voltage relay notpoint on the 4160 V safety-related busos were reset to a value of 23959 V il/2%.
Safety-related maintenance included:
1.
Repositioned pins on latch check switches of two 4160 V safoguards breakorn.
2.
Increased spring compression pressure on Unit 2 "B" steam generator blowdown sample air operated isolation valvo.
T
-