Forwards RDD:85:8604-01:01, Decontamination & Decommissioning of Bldg C - Phase I at Lynchburg Research Ctr, Per License SNM-778,Condition 14.Verification of Survey & Release of Bldg for Unrestricted Use Requested
ML20128F939
Person / Time
Site: 07000824
Issue date: 05/28/1985
From: Olsen A
BABCOCK & WILCOX CO.
To: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20128F942 List:
References
25450, NUDOCS 8507080415
Download: ML20128F939 (2)


Text

O 76-24

/ O l5 Ab*bf Research & Development Division Babcock & Wilcox

//

RECENtD

.\\

r tyocnso,o nese.,cn cenie, 4

P. O. Box 11165 V,M 31 85 >

{h

  • S t;uCLEAgps u u g

[

Lynchburg, Virginia 24506-1165 n

(804) 522-6000 capsspin g

to 6

wased May 28, 1985 e

s

=

4

'd\\

Mr. W. T. Crow, Section Leader 3

ggggg7gg

.M Uranium Process Licensing Section J

usNac

\\

Uranium Fuel Licensing Branch g.

1 JUN 2 71985 NMSS i

~

U.S. Nuclear Regulatory Commission

}N n233 Washington, DC 20555 36/p]

la MAIL SECTION pomIQTM

Subject:

Decommissioning oa 4

cn E-

Dear Mr. Crow:

I submitted a plan for the decommissioning of Building C of the Lynchburg Research Center by letter dated March 28, 1983.

In that letter I stated that Building C would be decommissioned in three phases. A three-phase approach was necessary because future uses for the building had been identified and portions of the building could be placed into useful ser-vice as soon as they became available.

The final survey report for Phase I of Building C is attached.

This report complies with Condition No.14 of License SNM-778.

In accordance with Appendix F of the ~ license application (dated December 1978), the report identifies the premises, demonstrates that a reasonable effort has been made to reduce the levels of residual contamination below the limits specified in Table F-1, provides a general description of the pro-cedures that were followed, and sets forth the final survey results.

In addition to the Table F-1 limits, other acceptance criteria for the re-lease of soil have been agreed to or recommended by members of your staff.

These criteria are also specified in the report.

I request that a verification of this final survey be made by the NRC and that upon the determination, by the NRC, that the facility meets the applicable criteria, that Phase I of Building C be released for unrestricted use.

Very truly yours, Arne F. Olsen Senior License Administrator Lynchburg Research Center pc: Director, NRC Region II R. L. Bennett 8507000415 850528 m a..