Discusses Insp of Licenses DPR-42,DPR-60 & SNM-2506 on 960522-0709.Violations Noted:Licensee Failed to Assure Adequate Design Control for Mod Installed on Discharge Piping of AFW Pumps
ML20128F845
Person / Time
Site: Prairie Island  
Issue date: 10/01/1996
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Watzl E
NORTHERN STATES POWER CO.
References
EA-96-266, NUDOCS 9610080241
Download: ML20128F845 (3)


Text

{{#Wiki_filter:o

4. -

October 1, 1996 EA 96-266-Mr. E. Watzl Vice President, Nuclear Generation Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401

SUBJECT:

EXERCISE OF ENFORCEMENT DISCRETION

Dear Mr. Watzl:

This refers to an NRC inspection conducted at the Prairie Island Nuclear Generating Plant May 22 to July 9,1996. The inspection included a review of modifications installed on your auxiliary feedwater (AFW) pumps and the results of that inspection were sent to you by letter dated September 13, 1996. Based on the information developed during the inspection, the NRC has determined that violations of NRC requirements occurred. Specifically, as required by 10 CFR Part 50, Appendix B, Criterion III, in 1982 you failed to assure adequate design control for a modifi;ation installed on the discharge piping of the AFW pumps. This modification was necessary to protect the AFW pumps against run-out for certain accident conditions. As a result of the inadequate control of the modification's design, the pumps were rendered inoperable under certain conditions, in non-compliance with the Technical Specifications. Normally, escalated enforcement action would be considered for these violations. However, in order to recognize your efforts in identifying problems affecting safety and to give credit for prompt correction of these problems, I have been authorized, after consultation with the Director, Office of Enforcement, to exercise enforcement discretion, pursuant to Section VII.B.3 of the NRC Enforcement Policy (NUREG-1600), and not issue a Notice of Violation in this case. NRC's decision to exercise discretion in this matter is based on it involving an old design issue that (1) was identified by your staff as a result of a voluntary initiative that consisted of a review of your 10 CFR 50.59 safety evaluation program; (2) was promptly and effectively corrected by your staff; (3) would have limited risk consequence for a relatively small number of postulated LOCA events; and (4) would not likely have been identified by routine licensee efforts such as normal surveillance and quality assurance activities. No response to this letter is required. 9610080241 961001 PDR ADOCK 05000282 G PDR

9 r E. Watzl 2 October 1, 1996 In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room (PDR). 1 Sincerely, /s/ A. B. Beach A. Bill Beach Regional Administrator Docket Nos. 50-282, 50-306, 72-10 License Nos. DPR-42, DPR-60, SNM-2506 cc: Plant Manager, Prairie Island John W. Ferman, Ph.D., Nuclear Engineer, MPCA j State Liaison Officer, State i of Minnesota State Liaison Officer, State of Wisconsin Tribal Council, Prairie Island Dakota Community i i l DOCUMENT NAME: G:\\EICS\\96266.HS To r:ceive a copy of this ddpu/nent, indicate in the box: "C" = Copy w/o $tachment/ enclosure "E" = Copy with attachment / enclosure *N" = No copy 0FFICE Rill:iTD 5 l RIII:R $ l RII/Il&RP l RFil: TAD l HQ:0E l i NAME Burg &Wjc BersonIN/ CalWell BoAW Lieberman via e-mail DATE 09/26/96 09/)-{f /96 09/ $ /96 $$/81 /96 09/26/96 0FFICIAL RECORD COPY

i

r E. Watzl 3

October 1, 1996 I DISTRIBUTION: jPUBLICxIE-01:iE?llL SECY CA JTaylor, ED0 JMilhoan, DEDR JLieberman, OE i ABBeach, RIII WRussell, NRR RZimmerman, NRR LChandler, OGC JGoldberg, 0GC Enforcement Coordinators i RI, RII, RIII, RIV BBeecher, OPA HBell, OIG EJordan, AE0D GCaputo, 01 MSatorius EA File (2) (Also by E-Mail) 1 I i l i I i 080013 i I -}}