__
y Northern States Power Company i
414 Nicollet Malt Minneapohs, Minnesota 55401 Teksphone 1612) 330 5500 February $, 1993 Honticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICEL1h NUCLEAR CENERATING PLANT Docket No. 50 263 License No. DPR-22 Monthly Operating Report January 1993 i
T Attached is the Monthly Operating Report 'for January 1993 for the Monticelle.
Nuclear Generating Plant.
/htke - c i
Thomas M Parker Director Nuclear Licensing TMP/mk1 C:
Director, Of fice of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota Kris Sunda Attachment l
i 14 9302110377 930131
/t i
.PDR,ADOCK 05000263 R.
~
~
,\\ \\
J.]
4
OPERATING DATA REPORT f
DOCKET NO.
50-263 DATE 2-1-93 COMPLETED BY H.H. Paustian TELEPHONE 612/295-5151 OPERATING STATUS
) Notes
]
- 1. Unit Name :
Monticello
)
)
JANUARY
]
)
- 2. Reporting periods 1670
)
]
- 3. Licensed Thermal Power (MWt):
4.-Nameplate Rating (Gross MWe):
569
)
)
- 5. Design Electrical Rating (Not MWe):
545.4
)
)
- 6. Maximum Dependable Capacity (Gross MWe): __564
)
)
- 7. Maximum Dependable Capacity (Net MWe):
536
)
)
- 8. If Changes Occur in Capacity Ratings (Items ' umber 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE 11.-Hours In Reporting Period 744 744 189265
- 12. Number Of Hours Reactor Was Critical 627.9 627.9 152612.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 625.0 625.0 149901.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 767201 767201 230160614
- 17. Gross Electrical Energy Generated (MWH) 252928 252928 77783728
- 18. Net Electrical Energy Generated (MWH) 240336 240336 74396223
- 19. Unit Service Factor 84.0%
84.0%
79.2%
- 20. Unit Availability Factor 84.0%
.84.0%
79.2%
- 21. Unit Capacity Factor (Using MDC Net) 60.3%
60.3%
73.3%
- 22. Unit Capacity Factor (Using DER Net) 59.2%
59.2%
72.1%-
- 23. Unit Forced Outage Rate-0.0%
0.0%
3.7%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 1/27/93 - 56 days
- 25. If Shut Down At End Of Report Period, Eatinated Date Of Startup: 3/23/93
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
1
.t.,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello___
DATE 2-1-93 COMPLETED BY H. H. Paustian TELEPHONE 612/295-5151 MONTH OF JAN UtY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 405.
17 381.-
2
- 408, 18 380.
3 402.
19 377.
4
- 409, 20 375.
5 402.
21 374.
6
_401.-
22 372.
7 398.
23 370.
8 397.
24 370.
9 395.
25 367.
-10 393.
26 336.
11 390'.
27-
-4.
- r 12 389.
28
-5.
13 388.
29
-5.
14 389.
30
-4.
15 383.
31
-3._
16 383.
.-INSTRUCTIONS On _ this fornat, list'the average daily unit power level in MWe-Net for each day in_the reporting month.
Compute to the nearest whole megawatt.
t "L7F e
+
-9 w
v t e e
o a
9
NARRATIVE
SUMMARY
OF' OPERATING EXPERIENCE
~ '
DOCKET NO.' 50-263 DATE 2--1-93 COMPLETED BY H.11. Paustian TELEPHONE' 612/295-5151 MONTH JAN 1-1-93 to Power operation.
Coastdown continued.
1-27-93 1-27-93 Plant. shutdown for End-of-Cycle 15 refueling outage, f
Notes-Power operation defined-as essentially 100% of.
rated power except for. weekend load drops for.
specified--autveillance testing.
O n-DOOTT FO.
50-263 INIT SHUIT;0VNS AND POVER REDUCTIONS INIT FU$ME Monticello DATE 02-01-93 COMPIETED BY 7. H. Paustian-TEIEPHONE _412/295-5151 REPORT N0tml January Cause & Corrective No.
%te Type Duration Reason Method IIR System Action to
'(1)
(hours)
(2) of No.
Code e
Shutdown (4)
(5)
Prevent Recurrence (3)
I Plant shutdown for 1993 (EOC15) refueling outage
)
1 01-27-93 S
119.0 C
1 N/A I
l i
f 3
4 1
2 Method:
Draft IEEE Standard F: Forced Reason:
1-Manual 805-1984(P805-US) 5: Scheduled A-Equipment Failure (Explain) 2-Manual Scram B-Maintenance or Test 3-Automatic Scram 5
C-Refueling 4-Other (Explain)
IEEE Standard 803A-1983 D-R lator Restriction l
rator Training & License Examination i
F-inistrative G-Operational Error (Explain)
H-Other (Explain) i 1
I 1
[
i k.- - _ -..___.