ML20128F326
| ML20128F326 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/27/1985 |
| From: | Jens W DETROIT EDISON CO. |
| To: | Dinitz I NRC OFFICE OF STATE PROGRAMS (OSP) |
| References | |
| NE-85-0906, NE-85-906, NUDOCS 8507080208 | |
| Download: ML20128F326 (7) | |
Text
.
er
- 6 72Mi' Natiear Operadons DOIrOil
^
r.rm 6400 Neyth Dixe H4g Edison amehway aune y,,ess a:r.v_
UE-85-0906 lir. Ira Dinitz Insurance Indemnity Analyst Office of State Programs U. S. Nuclear P.egulatory Commission Washington, D.C. 20555
Dear !!r. Dinitz:
Reference:
Ferni 2 NRC Docket No. 50-341 NRC Licence No. MPF-33
Subject:
Muclear Liability Insurance Secondarv Financial Protection Enclosed are tuo certified, true copies of the documents outlined belou.
Endorsements 110 and 111 to the Nuclear Liability Insurance Policy No. UF-92 Declarations Page and Endorsement 6 to the Nuclear Liability Insurance Policy MF-120 Endorsement 1 to the Secondary Financial Protection Certificate N-94 Endorsenent 1 to the Secondary Financial Protection Certificate 11-94 Should you have any questions or connents on the enclosed material, please contact fir. Keener Earle at (313) 586-4211.
Sincerely,
,/
f b'
l cc:
11r. P. fl. Byron fir. fl. David Lynch Ilr. J. D.
Saltzman USNRC, Document Control Desk Uashington, D. C.
20555 8507080208 850627
'g8 PDR ADOCK 05000341 i
s J
Nuclear Energy Liability insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION INCREASE OF LIMIT OF LIABILITY ENDORSEMENT It is agreed that:
~
1.
The limit of liability stated in Item 4 of the declarations of the policy is amended to read $ 124,000,000.00 This amended limit applies with respect to obligations assumed or expenses incurred because of bodily injury or property damage caused, during the period from the effective date of this endorsement to the date of termination of the policy, by the nuclear energy hazard.
2.
The limit of liability stated in Item 4 of the declarations and the amended limit of liability stated in paragraph 1 above shall not be cumulative, and each payment made by the companies af ter the effective date of this endorsement for any loss or expense covered by the policy shall reduce by the amount of such payment both the limit of liability stated in Item 4 of the declarations and the amended limit stated in paragraph 1 above, regardless of which limit of liability applies with respect to bodily injury or property damage out of which such loss or expense arises.
This is to certify that thin ic a true copy of the original Endorsement having tha on.larcoact s abor and being r=do part at the Huclear Encr;*y Liability f olicy (Facility Foruj as deo-Ignsted hereon. No Insurance is afforded hereunder.
A
=
t % I. QWer U 7 2 ra #
- W'E % b##
% ax :.nw L.wa 6 in s$r March 15. 19&5 or er ent To form a part of Policy No NF-92 12.01 A.M. Stancard Time Issued toThe Detroit Edison Company Date of issue April 1 1985 For the su icribing ce panies B
A
. c.v
/#~
General Manager
'A \\
.,,1 }
Endorsement No 110 Counter 10 bm k
M.
F ~- m s
)
Nuclear Energy Liability insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT CALENDAR YEAR 1985 It is agreed that Items la. and Ib. of Endorsement No. 108 are amended to read:
la. ADVANCE PREMIUM:
It is agreed that the Advance Premium due the companies for the period designated above is:
$63,584.73 Ib.
STANDARD PREMIUM AND RESERVE PREMIUM:
In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premium and the Reserve Premium is: $ 46,974.57 Additional Premium:
$ 52,078.44 This is to certify that thin 10 " +"W' ropy of the original c.doraeucat hrcirc :he m.
_ ad Mg cade M r
I "2 1"7 " A 3
- 8' of the liuclear Ene-Gy hirili'- 2 ign.sted herpon. lio In3uryce ip ag'?-C/j fj e:1 hereunder.
D-John L. Quttrcd.i, V!re Pndkrt-LhbH;ty Un&r aritir.g A:wncan Nudca barcu Effective Date of January 1, 1985 NF-92 Y
12:01 A.M. Standard Time lssuedio The Detroit Edison Company Date of issue May 3. 1985 For the su scribing co panies By l
~
/F~
General Manager Endorsernent No III Countersigned by NE-36
MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS 919 North Michigan Avenue, Chicago 11, Illinois This is to certify that this is a true copy of the original D7clarations and Endorsements Numbered 1 through 8 and being
- zde a part of the Mutual Atomic Energy Liability Nuclear Energy Liability Policy No. MF-120 (Facmty Fonn)
Palicy (Facility Form) as designat d hereon.
No I turance is affa ded hereunder.
-1,
\\
DECLARATIONS Joh L. Quat 11, Vice Presi e - ability unuerwruing American Nuc} ear Insurers Item 1.
Named Insured The Detrolt Edison Company Addrm 2000 Second Street, Detroit,Michban 48226 (No.
Street Town or City State)
Item 2.
Policy Period: Beginning at 12:01 A.M. on the 15th day of Ma.tch
,19 85, and continuing through the effective date of the cancelation or termin:tien of this policy, standard time at the address of the na:ned insured as stated herein.
Item 3.
Description of the Facility:
Location See Endorsement _No. 1 Type Power Reactor The Operator of the facility i.
The Detrolt Edison Company Item 4.
The limit of the companies' liability is $J6_L,_0_0_0_,0_00._00 subject to all the terms of this policy having reference thereto.
Item 5.
Advance Premium $ 17;791-9R Item 6.
These declarations and the schedules forming a part hereof give a complete description of the facility, insofar as it relates to the nuclear energy hazard, except as noted No Exceptions Date of Issue._ May 3, 1985 Countersigned by Authorized Representative Nuclear Energy Liability Policy (Facility Form) 2/1/57 (Second Revision) 7.
r 1
NUCLEAR ENERGY LIABILITY INSURANCE i
l MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ADVANCE PREMIUM ENDORSEMENT and STANDARD PREMIUM ENDORSEMENT Calendar Year 1985 1.
ADVANCE PREMIUM It is agreed that the Advance Premium due the companies for the calendar year designated above is S 17.791.98 2
STANDARD PREMIUM AND RESERVE PREMIUM
. In the absence of a change in the Advance Premium indicated above, it is agreed that, subject ~to the provisions of the Industry Credit Rating Plan, the Standard Premium and Reserve Premium are:
Standard Premium 17.791.98 Reserve Premium S
13.144.20 Effective Date of To form a part this Endorsement March 15. 1985 of Policy No.
MF-120 Icaued to The Detroit Edison Company Date of Issue May 3. 1985 For the Subscribing Companies MUT L ATOMIC ENERGY LIABILITY UNDER ITERS By w 2A '
VV V
\\
T Endorsement No.
6 Countersigned by AUTil0RIZED REPRESENTATIVE This is to certify that thic is a tmto copy of the original Endorsement having the endor ~ e.
- ce and being made part
- th "" 1*""
" #57 '1*b
~~ " # ),;, (Fa 111ty Fors) as des-
/
ME-41 ignated hereon. No Incurance is e/korded hereunder.
.T.
m t. en:w n.,.u..n m. ecu. m
_.~
Amican Eiu hwurcr4
1
- 8
~
Nuclear Energy Lisblilly insurance NUCLEAR ENERGY LIA0fLITY INSURANCE ASSOCIATION l
SPECIFICATION OF CERTIFICATE EFFECTIVE DATE AND PREMIUM ENDORSEMENT It is agreed that:
1.
The United States Nuclear Regulatory Commission has issued to the insureds name in Item 1 of the Declarations Operating 1.icense No.
NPF-33 effective March 20, 1985 for the reactor described in Item 3 of the Declarations of the certi fica te.
- 2.
Item 6 of the Declarations of the Certificate is deleted and replaced by the following:
Item 6.
Certificate Period:
Beginning March 20, 1985 and continuing to the effective date and time of cancellation or temination of the Master Policy or this Certificate, whichever first occurs, eastern standard time.
3.
Item 8 of the Declarations of the ~ Certificate is deleted and replaced by the following:
Item 8.
Portion of the annual premium payable for the companies' contingent liability described in Condition 4 of the Master Policy from the effective date hereof to the end of calendar year 1985
- $ 3,654.90 This ip to certify u. t v c u i-; a - o von vi the original Endorcement havin;; tim and v..
.ur and being nado part oc ti:e IIuclear Enerc/ Liia an t t, D'acility For:a; as des-ignated hereon. No Inn vance in.. orded hereunder.
'o n L tem L,m,
s A v.w.n ha.v ama Ef t:ctive Date of inis Encorsement_
March 20, 19g5 12:01 A.M. Stencaro Time To form a part of Certificate No.
N.,9 4 issuad to _ The Detrolt Edison Comoany Dita of issue Mav 1-14M For the su scnoing corgpanies 1
sy A
/F~
1 General Manager Encorsement No --
Counters!cnsd by-h
NUCLEAR ENERGY LIABILITY INSURANCE MUTUAL ATOMIC ENERGY LIABILITY-UNDERWRITERS SPECIFICATION OF CERTIFICATE EFFECTIVE DATE AND PRENIUM ENDORSB1ENT
's It is agreed that:
1.
The United States Nuclear Regulatory Commission has issued to the insureds name in Item 1 of the' Declarations Operating License No.'
NPF-33 effec tive '
March 20,'1985 for the reactor described in Item 3 of the Declarations of the certificate.
i s
2.
Item 6 of the Declarations of the Certificate is deleted and replaced by the following:
Item 6.
Certificate Period:
Beginning March 20. 1985 and continuing to the effective date and time of cancellation or termination of the Master Policy or this Certificate, whichever first occurs, eastern standard time.
3.
Item 8 of the Declarations of* the Certificate is deleted and replaced by the following:
Item 8.
Portion of the annual premium payable for the companies' contingent liability described in Condition 4 of the Master Policy from the effective date hereof to the end of calendar s
year 198c;
- '$ ' 1.061.10 Eficctive Date of To form a part this Endorsement March 20, 1985 of Cortificate No.
N'94 The Detroit Edison Company 7,
g Date of Isaua M y 3. 1985 This 10 to certify that thin la a true copy of the original Endorsement h1ving the e@" e r r To'r thdSchscllh's(Companies
^
o t' the Nuclear Ec' < rrj ' i D i ' '. '
'o !
(Unc!11ty For.2) aa dos-d htgp+k TOMIC ENERGY LIAJllLITY US af Ignated he con.1;o Inauwm a m,
)ERWillTERS John L Quattrocchi, Uiee rnyyemn.pg, g,g*,.
Ily d
Nk R
W/
N Amencan Nuc! car hisura, Endorsement No.
I Counternigned by A urinmu.i. it.w....w r.rn e 4