ML20128F298

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jan 1993 for Millstone Nuclear Power Station Unit 3 & Revised Monthly Operating Rept for Dec 1992
ML20128F298
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/05/1993
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128F301 List:
References
MP-93-126, NUDOCS 9302110332
Download: ML20128F298 (1)


Text

s..

t..

y-

  • a-ggg oeneral Offices

2c[#M'..e."..,,a,"w*7[7,"

P.01 box 270 J

HARTFORD. CONNECTICUT 06141-0270 -

.a m.or L

g

y u,

-(203) 666-6911

<s x February 5,'1993 11P-93-126 Re: 10CFR50.71(a)l U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 r

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423 -

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section s.9.1.5, the Millstone Nuclear Power Station - Unit 3 hionthly Operating Report 93-02 covering.

-operation for the month of January is hereby forwarded.- Additionally, a corrected page-for the Unit Shutdowns and Power Reductions for the month of December-(hfonthly Operating Report 93-1) is included. The numbering of unit power reductions was incorrectly reported for the month of December. The attached page reflects the correct information.

Very truly yours, j

. NORTHEAST NUCLEAR ENERGY-COMPANY 1#

cace Stephed E. cace Vice President, Millstone Station - NNECO Attachment '

i cc: T.T. Martin, Region I Administrator P, Swetland, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3

V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 i

i

/p/

110008 Ju21;gg2gg{g3

_