- a-ggg oeneral Offices
- Selden Street. Berlin. Connecticut -
2c[#M'..e."..,,a,"w*7[7,"
P.01 box 270 J
HARTFORD. CONNECTICUT 06141-0270 -
.a m.or L
g
- y u,
-(203) 666-6911
<s x February 5,'1993 11P-93-126 Re: 10CFR50.71(a)l U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 r
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423 -
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section s.9.1.5, the Millstone Nuclear Power Station - Unit 3 hionthly Operating Report 93-02 covering.
-operation for the month of January is hereby forwarded.- Additionally, a corrected page-for the Unit Shutdowns and Power Reductions for the month of December-(hfonthly Operating Report 93-1) is included. The numbering of unit power reductions was incorrectly reported for the month of December. The attached page reflects the correct information.
Very truly yours, j
. NORTHEAST NUCLEAR ENERGY-COMPANY 1#
cace Stephed E. cace Vice President, Millstone Station - NNECO Attachment '
i cc: T.T. Martin, Region I Administrator P, Swetland, Senior Resident Inspector, Millstone Unit Nos.1,2 & 3
V. L. Rooney, NRC Project Manager, Millstone Unit No. 3 i