Documents Util Requests for Rev of Completion Date for Commitment Contained in Corporate Nuclear Performance Plan, Vol 1,Rev 6 Re Master Equipment List.Requests That Scheduled Completion Date Be Extended to 940930
ML20128F082
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/03/1993
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9302110239
Download: ML20128F082 (3)


Text

,

p 4-y.,

A 6

HA iva eme VgW AdWWy Fou OMo lhe M4 cwh Apam 3NhN 000 O J "lW Zeringue vu nokwnt Hnn rey usou not FEB 0 31993 U.S. Nuclear Regulatory Commission ATTH: Document-Control Desk Washington, D.C.

20555 Gentlement In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - REVISION OF CORPORATE NUCLEAR PERFORMANCE PLAN (CNPP),-VOLUME I,-REVISION 6, COMMITMENT DATE RELAThD TO MASTER EQUIPMENT LIST

References:

1.

TVA letter dated May 5, 1989, to NRC

_ Corporate Nuclear Performance Plan, Volume I, Revision 6 2.

TVA letter dated September 20, 1991, to NRC - Status and' Schedule for Completion of Unit 2 Post-Restart Issues This letter documents TVA's request for a revision of the completionfdate for a commitment contained in CNPP, Volume I, Revision 6, related to

" Master Equipment List" (Reference 1). As discussed in the NRC'and TVA management meeting-held on January 8, 1993,,it is appropriate-to= revise the commitment date_of September 30, 1993-to September 30,-1994.--

.In the CNPP, TVA committed to, upgrade the configuration (management--

system. -As part of this upgrade _ effort for BFN, TVA letter dated September 20,-1991', to NRC (Reference 2)-provided a scheduled implementation date of_ September 30, 1993,' for the.following CNPP-commitment The configuration management-function _.v'ill include a-controlled.

master equipment list and a master design document list.

I h

. [

m' 1

m_m_-

t 2

l U.S. Nuclear Regulatory Commission FEB 0 31993 Reference 2 also provided the following information: 1) the Master Equipment List (MEL) has been incorporated into the Browns Terry Equipment Management System (EMS) data base, 2) the key safety-related listings of equipment information have been loaded into EMS, including the Q-List and the 10 CFR 50.49 list, 3) the procedures for maintaining these listings are in place, 4) the valve tabulations would be added by September 30, 1991, and 5) the EMS, the Document Change Control Management (DCCM) System, and the Calculation Cross Reference Information (CCRIS) System are the controlled systems that make up the Master Design Document List.

Subsequently, the MEL Validation / Verification was merged with phase 11 of the Q-List. This resulted in an increase in the total scope of the project and the need to extend the scheduled completion date to September 30, 1994.

In addition, other databases were reviewed for inclusion into the Equipment Management System (EMS),

Based on these reviews, TVA plans to input the instrument and fuse tabs.

In addition, the revised scope of this project includes a systematic review of EMS to:

1) update quality-related classification and evaluation, 2) validate the database by identifying safety related, quality-related, and nonquality related components in safety related systems, 3) resolve incorrect and redundant component identification numbers (UNIDS), and 4) establish procedural controls to maintain configuration. The increase in the total scope of this project through combining of programs has resulted in a total of approximately 129,000 components for Unit 2 and common to be verified and input to EMS.

In summary, due to the increase in scope as previously discussed TVA requests that the scheduled commitment completion date be extended to September 30, 1994. There are no new commitments contained in this letter.

If you have any questions, please telephone G. D. pierce, Interim Manager of Site Licensing, at (205) 729-7566.

Sincerely,

[

0. J. Zeringue cc: See page 3

3 U.S. Nuc1 car Regulatory Comminaion FEB 0 31993 cc HRC Resident inspector lirovnn Ferry Huclear Plant Route 12, llox 637 Athens, Alabama 35611 Mr. Thierry M. Rosa, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr.11. A. Wilson, Project Chief i

U.S. Nuclear Regulatory Connianion

~

Region 11 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 e

t'l b

ii u iti iib ii

...amia...m